Highlights 2013

Semi-automated Gas Turbine


Inlet Filter testing according
ARAMCO standard or for
performance optimization
D. Renschen*, J. Schamberg*, N. Guttenbrunner**, N. Schneider**

There is a growing demand for improved gas turbine air filters with regard to the energy efficiency in operation and
filtration efficiency in view of the increasing demands of modern gas turbine for inlet air quality. Therefore, supported by
DMT as air filter testing specialist, Bilfinger Gerber set up a special test rig for testing semi-automatically gas turbine
inlet filters according to ARAMCO standard (32-SAMSS-008) which describes a harsh gas turbine filter testing program.
The process measuring and control technology allows an automatic run of the different test phases as required by the
ARAMCO standard. Only for dust sampling for the determination of the filtration efficiency manual support is needed. This
facilitates the sequential tests of different air inlet filter types e.g. for optimization of the filter performance within R&D.

1. Introduction fication” is to ensure the ability of an inlet ments for an inlet air filtration system for
air filtration system for combustion gas a gas turbine installed in a filter house. It
New construction plus the growing
turbines to withstand the rigid environ- includes requirements for the filter ele-
replacement market were supposed to
mental conditions in a high ambient dust ment (structure). Further on the specifica-
boost turbine inlet air filter sales to over
desert area, with relative humidity ranging tion describes requirements for the system
$400 million in 2013. This segment would
account for 6% of the $7billion air filter from zero to 100% (coastal zones). The performance, mechanical and electrical
market, as claimed by the McIlvaine intent of such an inlet air fi ltration system instrumentation and the filter house itsself.
Company in its Air Filtration and is to limit the ingestion of airborne conta- In the appendix information about protec-
Purification World Markets report. There minants such as sand, dust and alkali metal tive coatings are summarized and a quali-
is a growing demand for improved gas tur- salts (sea salt aerosol) so as to prevent gas fication and performance tests for materi-
bine air filters with regard to the energy turbine compressor erosion, fouling, cool- als e.g. against salt fog is defined.
efficiency in operation and filtration effi- ing air passage blocking and hot corrosion For planning a test (rig) it is important
ciency in view of the increasing demands of the turbine section components. The to consider the requirements for the pulse
of modern gas turbine for inlet air quality. system specifi ed is intended for continu- air system (Chap. 5). All other important
A lot of the existing and future gas turbine ous duty, high effi ciency air fi ltration. figures for the test equipment, test materi-
power plants are erected in arid or semi- Therefore, the air fi ltration systems cov- als (test dust), test conditions and the test
arid zones with potential high dust expo- ered by this specifi cation are limited to the procedure of filter elements and the report-
sure. automatic pulse-jet self cleaning type. ing of the results are included in Appendix
Usually air inlet filter for gas turbine For other environmental conditions II (Filtration Testing Requirements).
applications are tested for classification with much less dust like in Central Europe
according EN 779.This gives a clear indi- the test standard “Air intake filter systems 3. Test Rig Design and Validation
cation about performance in view of initial for rotary machinery - Test methods - Part
1: Static filter elements” (ISO/DIS 29461- In spite of the requirements and descrip-
pressure drop behavior and efficiency tions for the appropriate equipement for
against DEHS and ASHRAE test dust. But 1:2010) was just developed for filter which
are not cleanable. the test rig according appendix II of the
this standard gives no information about Aramco Standard a lot of details had to be
behavior about cleanable filter systems DMT as air filter testing specialist and
third party testing institution supported fixed. By the target to set up a semi-auto-
and its performance within operation espe- matically working test rig further require-
cially under severe operation conditions. Bilfinger Gerber in setting up a special test
rig for testing semi-automatically gas tur- ments had to be defined especially for
For the filter media of such air inlet fil- process measuring and control technology
ter pretests can be made by the VDI 3926- bine inlet filters according to the Saudi
Aramco Material System Specification 32- devices and the software for data aquisi-
1 (“Testing of cleanable filter media” or tion and control.
ISO 11057) to receive information about SAMSS- 008 (ARAMCO standard).
Appendix II of the Aramco Specification Other requirements resulted from the
the ageing behavior and performance
describes a test procedure for a harsh filter necessity to set up a test system which
against test dust from the application.
testing program divided in several phases generates data which are valid in view of a
The so called Saudi Aramco DeskTop to detect the capability of resistance certification of filter elements which shall
Standard “32-SAMSS-O08” is a “Materials against desert sand storms. be tested by means of this system (DIN
System Specification” including a test EN ISO/IEC 17065). Therefore, all these
specification. The purpose of the “Speci- measurement devices, which are integrat-
2. Test Standard
ed in the test rig, must have a precise spec-
* D. Renschen, J. Schamberg, Saudi Aramco Material System ification and be able to be calibrated.
DMT GmbH & Co. KG Specification 32-SAMSS-008
Product Assessment Refrigeration & Air Quality After finalization the test rig as com-
Am Technologiepark 1, D-45307 Essen / Germany (Aramco Standard) plete testing system has to be validaded
** N. Guttenbrunner, N. Schneider Most chapters of the specification are (EN 45002 “General criteria for the
Bilfinger-Gerber GmbH, D-44379 Dortmund / Germany dealing with material and system require- assessment of testing laboratories”). The

F & S International Edition No. 14/2014 85


02_fs_international_2014_seite_03-98__ 21.05.14 20:12 Seite 86

Highlights 2013

Tab. 1: Survey of measurement points within the Aramco standard test rig validation test method characterizes the
method features of the Aramco Standard
test procedures. The further target of vali-
dating the test rig and the test procedure
(by DMT) is to ensure that testing of gas
turbine filter cartridges (which is per-
formed at a testing site of Bilfinger
Gerber), is according to the Aramco
Standard. For certification of tested filter
types the validated test procedure has to be
secured even against manipulation within
data acquisition. DMT acts as mandated
neutral evaluation service. Bilfinger Gerber
as testing laboratory. Therefore, DMT has
to ensure the integrity of the measured
data when measured in the external labo-
ratory.
Tab. 2: Basic modules of the Aramco standard test rig
The testing procedure of filters accord-
ing the Aramco standard is diveded in six
phases during which sets of different para-
meters and measurements are carried out.
Essentially, for the Aramco test proce-
1 dures (phases 0-5), the following data have
to be measured continuously:
Intermediate - Differential pressure on the Wilson flow
Compresso compressed
grid (volume rate test duct – up to
with air drier air tank
12750m3/h): Δpflow grid
- Ambient pressure (0 – 1100 mbar):
pbarom.
- Ambient temperature: Tambient
- Relative humidity: ϕambient
2
- Differential pressure inlet air filter (3
pressure transmitters: I 0 to 300 Pa, II 0
to 1000 Pa, III 0 – 10000 Pa): Δpfilter
Compressed air tank with diaphragm valves,
blow tubes connection and manometer Pressure regulator valve - Compressed air vessel pressure (up to
10 bar): pcomair
- Valve opening time (is adjusted to the
specified value, not measured)
- Volume rate at sampling point 1 (Mass
·
3 flow controller 0 – 200 l/min): V PN1
Controller
- Volume rate at sampling point 2(Mass
·
blow tube flow controller 0 – 200 l/min): V PN2
diaphragme - Dust concentration raw gas (upstream,
Diaphragme valve valve
via dust generator, gravimetric dosage,
balance 0 to 50 kg): m· test dust
The data acquisition and transmission
of measured values to the central comput-
er (control station) have to be ensured. All
4 measurement parameters are summarized
in table 1.

2 blow tubes with 4. Semi-automatically gas turbine


6 outlet nozzles (each)
inlet filters test rig
The new test rig of Bilfinger Gerber is
composed of several different modules
which are suitable for a testing according
the technical specifcation “32-SAMSS-
5 O08”.
+ The test setup is divided into 10 modules:
6
1) Compressor (supply) for compressed
Test duct air tank (vessel)
Section for 2) Compressed air tank
dust sampling 3) Diaphragm angle valve

86 F & S International Edition No. 14/2014


02_fs_international_2014_seite_03-98__ 21.05.14 20:12 Seite 87

Highlights 2013

4) Blow tube/pipes Tab. 2: Basic modules of the Aramco standard test rig
5) Test duct
6) Test section for dust sampling/dust
sampler system
7) Dust Injection System (ejector)
8) Differential pressure measurement 6
system (for the filter)
9) Fan (suction mode) Mass flow
10) Steam vaporizer for humidification controller
Dust sampling system (dust sampl.)
The different modules are shown in the
table 2 (below) in more detail.
All components of the resulting test rig
are connected to the central control com- Test dust
puter. The software program aquires all containment
data and controls different components 7
like the frequency controlled fan for auto-
matic adjustment of the volume rate to the
specified value. Further on test dust gener-
ation, pressure pulsing and sampling of the Dust injection system (nozzels) Controller unit
dust on the upstream side (clean gas) of
the test filters is done automatically within
one test phase according the Aramco stan-
dard. Only the change of the sampled fil-
ters for the gravimetrical determination of 8
the test dust in the clean gas has to be done
manually at the defined time intervalls by
Differential
the operator. pressure
By the central computer the measured transmitter Measuring points
data are controlled against special limits
(for instance upper pressure drop). If this
limit value is reached the test is stopped
automatically and the operator is informed
by an alarm signal. A picture of the screen
of the software control program is shown 9
in figure 1.
Radial fan unit
5. Validation of the test rig and
axial-flow fan Ventilation flap with actuator unit
the test procedure
To ensure a correct test procedure as
base of a certification the whole test rig
was thoroughly examined. The examina-
tion was performed in particular with
regard to the measuring sensors, in order 10
to inspect the proper positioning and cali-
bration of the measuring equipment.
Steam vaporizer Humidity and temperature sensor
First the status of calibration of the dif- (front outside of test chamber) (inside of test chamber)
ferent measurement devices was con-
trolled. This means as part of the test rig
validation, the calibration certificates were
checked and included in a test rig manual. The data measured by the different sen- the test bench at Bilfinger Gerber was
All sensors of the test equipment have to sors in the test bench are acquired by the accompanied by a test engineer of DMT.
be calibrated periodically according to the central control computer at a rate of about Within this test method validation fol-
requirements of the agreed quality control 5/min. A resulting table is arranged to a lowing work packages have been made by
system (tab. 1). By testing inlet air filters continous time scale to which the data of DMT:
according to ARAMCO standard under each sensor are included in the according - Definition of the requirements for this
supervision of DMT the validity of the cal- columns. The data are broken down by external certification testing
ibration certificates will be inspected. each of the five test phases and stored in a
“csv-file”, which is transferred into an - Definition of the validation procedure for
For the dust generation system the mass the test method
flow of dust was examined by DMT and “Excel” file-format which can easily be
edited for the following data analysis. - Round Robin test between DMT and
the system calibrated accordingly a inter-
To validate the semi-automated filter Bilfinger Gerber
nal QC procedure. The quality of dust dis-
persion of the dust generation system was test procedure adapted according the stan- - Check of the integrity of the raw data and
examined by measurement with a DMT dard 32-SAMSS-O08, two equal tests for the data transfer
modified Berner type impactor in compar- the same type of an inlet air filter were This whole validation process was full-
ision with the particle size distribution of carried out at the DMT and at the Bilfinger filled by Bilfinger Gerber successfully.
the used test dust (fig. 2). Gerber test rig. This first validation test on

F & S International Edition No. 14/2014 87


02_fs_international_2014_seite_03-98__ 21.05.14 20:24 Seite 88

Highlights 2013

DMT gains access to the acquired data


at the external test rig within an ongoing
measurement and to complete data sets
after completion of the tests. The intrusion
by DMT on the computer system of the
external test rig is made via Internet access
about the program “TeamViewer”. Thus, it
is possible during the experiments to mon-
itor the current operating state. By com-
paring data documented during monitor-
ing via “TeamViewer” with the raw data
set after finshed testing validity of data can
be verified.

7. Capabilities of this unique


test system
The semi-automated “Aramco” test rig
of Bilfinger Gerber provides results which
are plausible and trustworthy. It is
designed appropriately for the inlet air fil-
ter test procedure within the specification
32-SAMSS-O08. By this semi-automated
filter system testing can be done much eas-
ier and with less man-power.
Fig.1: A picture of the screen of the software control program Beneath these basic features the test rig
also incorporates a steam humidification
and an air circulation system. Therefore,
different other testing options are possible
due to an “open” air inlet which is inte-
grated in a special test room.
This test rig facilitates the sequential
test of different air inlet filter types (not
only pulse filters) and is suitable for opti-
mization of the filter performance within
R&D. Therefore, beneath the testing
options according the standard further
tests can be made like optimization of the
distance between blow pipe and filter car-
tridge or of the consumption of com-
pressed air, determination of the efficiency
of coalescer filter for mist elimination etc..

Literature:
/1/ 32-SAMSS-O08, Materials System Specification for
Inlet Air Filtration Systems for Combustion Gas Turbines,
Saudi Aramco, 2008
Fig. 2: Comparison particle size distibution of the test dust with the dispersed test dust sampled /2/ DIN EN ISO/IEC 17065, “Conformity assessment -
from the raw gas in the test rig Requirements for bodies certifying products, processes
and services”
6. Testing and Certification of Bilfinger Gerber and DMT closely cooper- /3/ EN 45002, “General criteria for the assessment of test-
inlet air filter elements ate in the examination of filter perfor- ing laboratories”
The testing of filter cartridges accord- mance for other customer. Therefore, the /4/ ISO/DIS 29461-1:2010, “Air intake filter systems for
cooperation is based on a secrecy agree- rotary machinery - Test methods - Part 1: Static filter
ing the Aramco standard at the new test rig elements”
will be performed at the site of Bilfinger ment between both parties which secures /5/ VDI 3926-1, “Testing of cleanable filter media -
Gerber. Nevertheless, the test results will confidentiality of all information within Standard test for the evaluation of cleanable filter
third party testing. media”
be certified by DMT. This assumes that

88 F & S International Edition No. 14/2014

Das könnte Ihnen auch gefallen