Electrical Site Engineer.

Installation of following items as per drawing


• Electric Bus bar 1000 Amp, 630 Amp, 100 Amp, 25 Amp
• Conduit wiring, General wiring
• Lighting system, Down light, Tracking Light, panel light
• Lighting bus way
• Grounding & Lightning.
• Fire Alarm System.
• Telecommunication system. CCTV, Access Control
• Cable Tray installation.
• BOQ, MOQ making and billing
• Preparation of Electrical procedures for installation test & commissioning.
• Designing and supervision of maintenance procedures
• Attending Technical and progress meetings on site.
• Reading electrical design specifications and technical drawings.
• Organizing routine servicing schedules.
• Handling of electrical progress at the site with all contactors for equipment
• Sizing, cable sizing, CBs sizing.
Documentation and Coordination
• Making weekly Progress reports
• Making P/O Purchase order for Material
• MAR Material approval request for purchasing electrical materials.
• Coordinate with Clients, Project Management team Project Inspection division.
• Coordinate with Subcontractors and other Staff.
• Coordinate with other discipline such as Civil, Mechanical, Piping (for clearance).
• Coordinate with Engineering/Designing/Planning & Schedule department.

PMI Control Specialist JDs

Job description
Job Description
• Provide operational support in trouble shooting controls related issues during production
operation
• Perform electronic maintenance of production and auxiliary machines as per preventive
maintenance guidelines.
• Support / improve existing electrical / electronics and instrumentation & control systems
through work assignments.
• Perform RCA for recurring issues, develop and implement new control systems to improve
product and process quality.
• Leading the shop floor technical team Guide and motivate them.
• Provide technical support to the process to meet/improve safety, process and product
quality
• Conduct training activities to the factory personnel related to electronics and control
systems
• Develop and implement activities to prevent, eliminate or reduce the environmental
impacts and aspects derived from their area’s daily activities and their associated projects.

FLS………………….
Mechanical……
*Responsible for all erection activities in concern area including ATOX 40 Raw Mill, 5
Stages Preheater, Exhaust Gas Conditioning, CF Silo and Raw Mill Feed.
*Responsible for implementation of all inspections during erection and after installation
timely by following all required standards.
*Responsible for making BOQs of all concern areas including steel structure and
equipment.
*Responsible for managing all documentation related to project.
*Responsible for drawings interpretation and implementation accordingly.
*Responsible for bill verifications and handling all resources including material, tools and
men power.
*Responsible for implementing all safety procedures during erection.
……………………………………………..

 Supervise the Electrical Section of maintenance department activities.


 Perform business management duties such as maintaining records and files, preparing
reports and ordering supplies and equipment.
 Replacing the spare parts of the machines as and when required.
 Responsible for performing routine maintenance..
 Responsible in checking all the Fire Fighting system particularly in the electrical matter.
Familiar with Operation and Troubleshooting of 80KVA UPS (SICE) & Siemens, Rectifier,
Battery Bank, Inverter, and their Static Switch, Corrective Maintenance & Troubleshooting
of direct current board.
Variable Speed Drive Motor:
Familiar with Maintenance, Function and Operation of Frequency Control VSD
Medium and Low Voltage Switchgear, (low voltage switchgear):
Minimum oil, Vacuum and Magnetic Air type circuit breaker preventive maintenance, pole
testing and repair, mechanical interlocks & mechanism, Inspection and replacement of main
and arcing contacts
………………………………………………….

DCS

The following are the Nature of Jobs undertaken by the undersigned in the present
employment.
• Developing DCS/PLC Control Logics and SCADA Screens for ABB 800xA/SIEMENS S7
300/400 (DCS, PLC) and FLSmidth ECS SCADA, as per new requirements.
• Installation and commissioning of newly approved PLC projects.
• Experienced in handling Non-virtualized ABB architecture Redundant Aspect Servers,
redundant Connectivity servers and Clients.
• Involve in technical discussions for upgrading plant DCS from ABB 800xA 4.1 to ABB
800xA 6.0.3 with virtualization.
• Experienced in handling Virtualization with VMware Vsphere ESXi and Windows 2012R2.
• Experienced in handling Active Directory Users and Computers, Group policy
management.
• Experienced in handling Third party OPC communication with 800xA, Knowledge
Manager and FLS QCX System through DCom Settings.
• Experienced in handling HP Thin-Clients T520, Experienced in handling Windows 8.1 and
HPZ420 and HPZ440 Engineering and Client stations.
Job Description:
 Provide assurance on the design, planning & implementation of cementing programmes and support to
the Well Teams.
 The role requires site work offshore to supervise and ensure the integrity of cementing operations. As a
Cementing Engineer you will report to the Cementing Team Leader.
 Provide quality assurance of all cementing programmes & verify their compliance with agreed standards,
lessons learned and best practices.
 Provide Input and assist with company the zonal isolations requirements for well integrity purposes during
well construction, temporary & permanent abandonment
 Review and examine laboratory testing of Cement slurries ensuring they meet Company Design
requirements.
 Provide direct support to Wells Engineers including performing site witnessing of critical cement jobs
against the programme.
 Assist in analyzing cementing performance & propose improvements.
 Assist in developing and implementing of a long term development programme
 Ensure that health, safety and environmental performance is maintained as the highest priority.
………………………………………..

Working in Rohri Cement Plant having 5000 ton/day capacity at Rohri, Sukkur. The major
activities are:
• Planning and designing of Electrical system for Rohri Cement Plant.
• Planning and designing of 132 kV Grid Station.
• Planning and designing of 05 Substation, (Crusher, Raw Material Storage and Conveying ,
Raw Material Grinding, Kiln in Let, kiln out let)
• Planning and designing of Cable Root over all plant.
• Installations of MV and LV motors.
• Installation of soft starters, frequency inverter, panels (MV and LV) and MCCs, etc
• Erection of Electrical system of Central Control Room (CCR) as per Drawing.
• Carried out the Cable Trenches in various required Sub-Stations.
• Operation and maintenance of existing grid station 66 kV / 3.3kV.
• Operation and maintenance of existing Hammer Crusher Plant.
• Operation and maintenance of existing Cement Ball Mill having Capacity 700 ton / day.
• Operation and maintenance of existing Packing House.
Co-ordination with Chinese design firms and Electrical contractors.

………………………………………………………..
working on:
Substations
Errection of 132kv gis system( f35ct41) Transmission line
MV and LV Switchgears.
Cable trays installation and cable routing

………………………………………………………………..

Worked in the Erection and Commissioning Of 6 MW WHR Power Plant Project through
Steam Turbine HCTC Model BN6-1.17/.2 by utilizing exhaust hot gases.
Protection of switch-yard equipment & Sub-Station maintenance supervising.
Power Factor Improvement Panels Installation and Maintenance (P.F.I).
Installation, Maintenance and Troubleshooting of Air Circuit Breakers (made by MERLIN
GERIN and SIEMENS)
Preparing and maintaining all documentation regarding Motor Data, Motor Overhauling
Record, Shutdown Activities, Inspection and Plant Maintenance Reports.
Power Plant load Synchronization with K-Electric Load for Load Distribution to Kiln Areas.
Power Plant equipment maintenance, inspection and troubleshooting.
Daily troubleshooting, Inspection and maintenance of Control and Power Circuits in LV/ MV
SWITCH-GEARS PANELS.
Daily Shift Report and log sheet (KW, KVAr and Ampere) of MV Feeder Panels.
Measuring Vibration of all the LV/MV Motors and preparing vibration Log Sheet of All MV
and LV motor on daily basis.
Carried out inspection of all electrical equipment (MV/LV Motors, A.C Drives, Frequency
Inverters, and MCC’s).
Commissioning and Testing of AC Drives, Variable Frequency Drives, Soft Starters. By
SIEMENS, DANFOSS, PUMA, ABB.

……………………………………………………………………………………..

Responsible for project design and installation’s coordination of electrical systems applied
to the cement and minerals industry.
Relevant project management activities: design, coordination, planning, quality control,
system specifications, supplier management, tests and commissioning.
Relevant technical areas within installation engineering: earthing, substations, cable
systems, power systems, motors and drives, automation systems, control and
instrumentation and lighting.
Design of fiber optic networks and IP-based communication systems.

Product specialist in MV/LV substations and communications systems, also with


responsibilities as export control compliance classifier for electrical equipment to embargo
countries and restricted areas.

…………………………………………………..
Occupation: shift Electrical engineer into NLSupervision/FLSmidth specialized in operation
and maintenance of cement plants.
Duties and Responsibilities:
-Ensure the availability and proper functioning of electrical equipment necessary for the
production of "cement" in Cement plant of Djebl-Rasas Tunis.
-Follow the operation for all electrical plant wide during shift.
-Record all problems and their solutions in the shift log.
-Make simulations and alternations to the control system (ECS) and PLC needed by
production
team if necessary to maintain the process in operation.
-Contribute in root cause analyses (RCA).
-Carry out lock out / Tag out.
-Resolve electrical problems occurring during the operation of the plant on shift.
-Manage and supervise the activities of shift electrical technicians.
-Monitor and maintain the functionality of instrumentation for process control.
-Communication skills, problems solving, diligence and attention to details, safety
awareness.
-Making improvements to, and offering advice about, operational procedures
-Investigating problems and diagnosing and repairing fault, solve troubleshooting problems.
- Training maintenance and operative staff where appropriate

…………………………………………….

Pakistan Cement Company Ltd (Formerly Lafarge Pakistan) 7200TPD Production


(One of the largest cement manufacturers of Pakistan)

Major Responsibilities Include:


•Area In-charge at cement mills and packing plant.
Troubleshooting of running plant problems.
•Maintenance of both H.T (600kw~6140kw) and L.V motors.
•Designing of new Electrical circuits using AutoCAD according to plant requirement.
•Power Factor strict monitoring and maintenance to keep it as close to unity as possible.
•Energy consumption calculation and reporting to head office on daily basis.
•Maintain the First Level Inspection schedule.
•Working as a Maintenance Engineer Cement Mills, Kiln-Cooler, Raw Mill-Crusher, 132KV
Grid Station.
•Maintenance and Installation of motors and other starting panels with protections
•Inspection of all Plant Electrical Equipment ( LV motors, MV motors, ACB’s, VCB’s,
Switchgears, LV and MV Bus Bars, control panels, VFD’s, Star delta circuits, soft starters,
transformer’s, capacitor banks, and protection devices etc).
•Modification of electrical circuits according to plant requirements.
•Inspection and maintenance of 132KV switch yard equipments (OLTC, C.Ts, P.Ts, CVTs,
Surge Arresters, Bus bars etc).
•Visit all departments and studying of electrical power systems, load flow, voltage drop,
motor condition, short circuit studies, and relay coordination studies.
•Implement Preventive, Productive and Predictive Maintenance System Effectively to
Eliminate Chance of Machine Breakdown.
•Maintain health and safety rules (PPEs, Risk Assessment, LOTOTO, WAH Permits,
Confined Space Permits, etc) as per Lafarge Standards.
•Making sure personnel safety while performing any maintenance activity.

…………………………………………

Electrical Department:
 As Assistant Manager Electrical trouble shooting of running plant problems.
 Energy consumption calculation and reporting to head office on daily basis..
 Maintenance and Installation of motors and other starting panels with protections..
 Inspection of all Plant electrical Equipments ( LV motors, MV motors, ACB’s, VCB’s,
Switchgears, LV and MV Bus Bars, control panels, VFD’s, Star delta circuits, soft starters,
transformer’s, capacitor banks, and protection devices etc.
Inspection & Preventive Maintenance Cell: (Additional Charge)
 Inspection of Equipment and Conditional Monitoring including Vibration, Sound, Oil Level
and Temperature etc. of Area thoroughly and generate Maintenance reports.

Projects:

 Worked as Site Engineer at new 132Kv Grid


To cope with power demand at cement plant a new Grid station of 132KV was planned at
existing 66kv line, which is to be upgraded up to 132Kv by WAPDA. All the equipments
installed are compatible both for 66kv and 132kv. Power transformer of rating 46MVA dual
winding 66,132/6 kv OLTC supplied by CHINT Electric was installed. I worked as site
engineer with Chinese engineer on this major project.

 Worked as Site Engineer at new Stationery Packing Plant.


As a result of cement demand it was necessary to enhance the packing plant capacity.
Erection and commissioning of stationary packing plant of 80TPH capacity fully automated
plant was done. I worked as site engineer with my team for its commissioning.
 Worked as Site Engineer at VFD installation project.
To reduce the energy cost at plant USAID come up with an idea to replace the soft starters
for cooler fans with VVVFD (Variable Voltage Variable Frequency Drive). So in this regard
17 VFD of different ratings designed by ABB were installed. ACS2000 for 710KW motor of
cooler EP fan was also installed. I worked as site engineer with ABB commissioning
engineers at this project.