OF
CONSTRUCTION METHODS
If the project is awarded to us, the undersigned shall confer with the
construction engineer for a short briefing abouth the minute’s details of the
Plan and Specification . He shall then proceed to the site of work to
coordinate with the authorities concerned for another brief talk about the
feasible implementation of the subject project. They may
suggest/recommend good steps and favorable solutions to problems and
obstacles that might hinder the smooth operation of the work. We may in
turn present our working proposals to carry out the various items involved in
the most modern practice of building construction.
Construction materials that are sufficient for the working force to accomplish
in a work period shall from time to time be purchased in the city. We
understand that in insufficient supply of construction materials increases
overhead cost. Skilled and experience workers shall be hired within locality.
By hiring experience workers who complete set of tools however high his
demand for payment is more advantageous and cheaper than hiring a
beginner with a low rate but without the necessary tools for a particular job.
The former although demanding a higher payment can accomplish work with
a better quality in a short time than the latter whose work risk repair and
delay not to mention the extra cost involved. Finally, it is universally agreed
that the efficiency of the work in building construction could be augmented
by 25 percent or more with the use of the right kind of tools aside from the
improved quality of that work performed.
Upon receipt of the Notice to Proceed, the undersigned shall direct his
Construction Foreman to prepare all the construction equipment necessary
for the prosecution of the work and keep his men/workers in for contact to be
mobilized in the following day. Upon arrival at the jobsite, our camp including
quarter for our manpower personnel, offset bodega for construction material
machine and repair shop shall be constructed, and provid such related
facilities that deem very necessary for us. The areas that maybe used by us
shall of course be designated by the Inspector/Engineer, and with his/her
immediate approval temporary connection of water and power supply shall
at all times be observed, maintain, and operated by the firm under
component direction
Excavation
Backfilling Works
All spaces to be backfilled or filled shall be cleared from all rubbish and
other object and matter. The excavation pit to be backfilled shall be
dewatered and loose materials shall be removed before backfilling. The filling
materials, with proper moisture content determined by the Engineer, shall be
deposited loose and by layers not exceeding 20 centimeters and then
thoroughly compacted by the ramming, rolling or by means of mechanical
tampers or portable vibratory compactors to obtain at least the minimum
compaction or as determined by the Engineer
Formworks
Concrete works
Demobilization
Submitted by:
SALAMAN D. MANGCA
Proprietor/Gen. Manager