##Cover-do-not-delete. Cover page is required at any template as the first page. ##

U2000 Health check for Fortune


Network 2019 Q3 Implementation
Solution

##Logo##

Prepared by: kaung myo htet k84047447 Date: 2019/9/12

Reviewed by: tin tun htet t00738994 Date: 2019-02-12

Approved by: Date:

2019-9-13 华为保密信息,未经授权禁止扩散 第 1 页, 共 19 页
文档名称 文档密级

Contents
1 Description of Change ............................................................ Error! Bookmark not defined.

1.1 Description of Site .......................................................... Error! Bookmark not defined.

1.2 Purpose and Requirements ............................................. Error! Bookmark not defined.

1.3 Description of Change and Change Influence ................ Error! Bookmark not defined.

2 Preparations for Change .......................................................... Error! Bookmark not defined.

2.1 Composition of Change Team and Responsibility of Team Members Error! Bookmark

not defined.

2.1.1 Change Team of XX Company ......................... Error! Bookmark not defined.

2.1.2 Huawei On-site Change Team .......................... Error! Bookmark not defined.

2.1.3 Huawei Support & Guarantee Team ................ Error! Bookmark not defined.

2.2 Remote Access+ Platform and Software Preparation..... Error! Bookmark not defined.

2.3 Check of Equipment Running ........................................ Error! Bookmark not defined.

2.4 Change Risks and Countermeasures .............................. Error! Bookmark not defined.

2.5 Check Before Change..................................................... Error! Bookmark not defined.

3 Operation Steps for Change .................................................... Error! Bookmark not defined.

3.1 Overall Description of Change Steps ............................. Error! Bookmark not defined.

3.2 Operation Steps for Change ........................................... Error! Bookmark not defined.

3.3 Test and Verification ...................................................... Error! Bookmark not defined.

3.4 Solution for Changeback In the Case of Failure............. Error! Bookmark not defined.

3.4.1 Definition of Change Failure .............................. Error! Bookmark not defined.

3.4.2 Changeback Steps .............................................. Error! Bookmark not defined.

3.4.3 Tests After Changeback ......................................... Error! Bookmark not defined.

3.4.4 Changeback Risk Analysis..................................... Error! Bookmark not defined.


2019-9-13 华为保密信息,未经授权禁止扩散 第 2 页, 共 19 页
文档名称 文档密级

3.5 Change of Spare Parts and Emergency Workstation ...... Error! Bookmark not defined.

4 Work After Change ................................................................. Error! Bookmark not defined.

4.1 Observation .................................................................... Error! Bookmark not defined.

4.2 Other work...................................................................... Error! Bookmark not defined.

1 Description of Change

1.1 Description of Site

Please refer to the: Attachment network topology;

Network topology diagram

2019-9-13 华为保密信息,未经授权禁止扩散 第 3 页, 共 19 页
文档名称 文档密级

Key features and business U2000.

Related business amount 10

1.2 Purpose and Requirements

Change purpose* U2000 Health check for Fortune Network 2019 Q3

Fortune is the ongoing ISP in Myanmar , They have U2000,LTE TDD eNodedB.

Change scope
Need to conduct quarterly Health check inspection of U2000 and share details with

customer.

Change time* 2019-9-17 13:00 PM to 2019-9-17 18:00 PM

1.3 Description of Change and Change Influence

No.* NE name* QTY* Current version* Target version*

1 U2000 1 V200R017C10SPC250 NA

No. Related NE name QTY Current version Version

1 Test eNode B 1 V100R012C10SPC210 NA

Change Influence

Impact Risk Description

2019-9-13 华为保密信息,未经授权禁止扩散 第 4 页, 共 19 页
文档名称 文档密级

Voice/Video Health check activity not impact any services

Performance Health check activity not impact any services

Alarm Health check activity not impact any services

Provisioning Health check activity not impact any services

Billing Health check activity not impact any services

2 Preparations for Change

2.1 Composition of Change Team and Responsibility of Team Members

2.1.1 Customer Change Team

Name Responsibility Telephone No.

Paing Soe
RF Engineer +95 9402660715
Tun

Ye Naung
RF Engineer +95 943736464
Htun

2.1.1 Huawei On-site Change Team

Name Responsibility Telephone No.

Kaung Myo Htet Operator +95 9768768670

2019-9-13 华为保密信息,未经授权禁止扩散 第 5 页, 共 19 页
文档名称 文档密级

2.1.2 Huawei Support & Guarantee Team

Name Responsibility Telephone No.

GTAC GTAC Hotline +86 2981770999

2.2 Remote Access+ Platform and Software Preparation

Type Content Owner

Remote Access through Customer LAN is working fine. U2000 is


Remote access solution
accessible

Remote access test U2000 is reachable from Customer LAN

Site permission Site Access ready

Login authorization and necessary privillege will be obtained


NE login permission
before change

" Three Approvals" Yes

2.3 Check of Equipment Running

Check Item* Check result or steps*


1. Check and analyze the network alarm, performance indicators, network KPIs, and

hardware operation status.

Health check

Clear the equipment alarms and obtain KPIs prior to the change. (KPIs prior to the

activity must be obtained,

2019-9-13 华为保密信息,未经授权禁止扩散 第 6 页, 共 19 页
文档名称 文档密级

2. Check whether there are scheduled tasks in the system (such as scheduled tasks of the

system, jobs executed by the database regularly, and scripts run periodically), and

evaluate the influences of these tasks on the normal change.

3. Confirm with the customer's maintenance department on whether there are operations

on surrounding parts at that night and whether they would affect the change. Attach

special attention to the customer's network and surrounding charging parts.

2.4 Change Risks and Countermeasures

Main Issues and Countermeas


No. Risk Category Possibility Impact
Risks Description ure

Health
Health check
check
activity not
1 Bearer network risks No risk activity not Not impact any services
impact any
impact any
services
services

Health
Health check
check
activity not
2 Service risks No risk activity not Not impact any services
impact any
impact any
services
services

3 Rollback risks No risk Health check Health Not impact any services

2019-9-13 华为保密信息,未经授权禁止扩散 第 7 页, 共 19 页
文档名称 文档密级

activity not check

impact any activity not

services impact any

services

2.5 Check Before Change

No. Preparations Before Change Owner Completion Date

Change back solution has been prepared, Kaung Myo


1
confirmed and authorized by customer * Htet

Change solution and change back solution have Kaung Myo


2
been verified* Htet

Spare parts are ready for use within x minutes; if Kaung Myo
3
no spare part, contingency plan is available * Htet

As per change scenario, collect data for recovery


Kaung Myo
4 following <XX product data collection guide>, and
Htet
upload to iCare/eTrance *

Confirm has perform main/standby switchover test Kaung Myo


5
Htet

Readiness of getting access permission to the site Kaung Myo


6
Htet

Readiness of remote log-in environment Kaung Myo


7
Htet

Confirm change risks and emergency measures Kaung Myo


8
Htet

Confirm data and configuration are backup Kaung Myo


9
Htet

2019-9-13 华为保密信息,未经授权禁止扩散 第 8 页, 共 19 页
文档名称 文档密级

Confirm network performance is tested and recorded Kaung Myo


10
Htet

Readiness of change test personnel Kaung Myo


11
Htet

Readiness of relevant equipment maintenance Kaung Myo


12
personnel Htet

Readiness of support & guarantee team Kaung Myo


13
Htet

Readiness of mobile phone test card Kaung Myo


14
Htet

Readiness of boards, tools, and instruments Kaung Myo


15
Htet

3 Operation Steps for Change

3.1 Overall Description of Change Steps

No. Main steps Start time End time

1 Preparation before Operation 15:00 15:30

2 Health check Data colletion 15:30 16:30

3 Download Result of the Environment and Location Information 16:30 17:30

4 Check Alarm 17:30 18:30

5 Rollback 17:30 18:00

6 Service verification 17:30 18:00

2019-9-13 华为保密信息,未经授权禁止扩散 第 9 页, 共 19 页
文档名称 文档密级

3.2 Operation Steps for Change

Implementation
No. * Change Step* Operation* Time*
Person*

Login to U2000

Click

"Monitor" and
1 Check current alarm at the U2000 Kaung Myo Htet 15:00 -- 15:30
Click "Browse

Current Alarm"

Enter

https://<IP

address

of the OSMU

server>:30088/

osmu

in the address
2 Logging into OSMU system Kaung Myo Htet 15:30 -- 16:30
bar of the web

browser on

your PC and

press Enter.

Log in to the

OSMU as user

admin.

Select the

"Environment
Set Task manually for environment information
3 information" Kaung Myo Htet 15:30 -- 16:30
and location information
and than click

"Next"

2019-9-13 华为保密信息,未经授权禁止扩散 第 10 页, 共 19 页
文档名称 文档密级

Select the

"Location

information"
4 Set Task manually Kaung Myo Htet 15:30 -- 16:30
and than click

"Next"

In the displayed

tab page, click

OK.

5 Created the task Kaung Myo Htet 15:30 -- 16:30

2019-9-13 华为保密信息,未经授权禁止扩散 第 11 页, 共 19 页
文档名称 文档密级

Step 1

In the Address

box of the web

browser, enter

6 Login to OSMU Web https://IP Kaung Myo Htet 15:30 -- 16:30

address of the

M2000/U2000-

M server31123.

Step 2 - log in

to the system as

user ossuser.

collect on the
7 Create Task for OSSCAT file Kaung Myo Htet 15:30 -- 16:30
U2000 OSMU:

2019-9-13 华为保密信息,未经授权禁止扩散 第 12 页, 共 19 页
文档名称 文档密级

1,OSS health

check Health

Check > OSS

Health Check >

OSS Health

Check.

2.OSSCAT

OSSCAT >

Task

Management

and click start

nbsp;

Download the

latest report.
8 Download OSSCAT file Kaung Myo Htet 15:30 -- 16:30

Confirm the collection for Environment


9 Kaung Myo Htet 16:30 -- 17:30
information and Location Information log

2019-9-13 华为保密信息,未经授权禁止扩散 第 13 页, 共 19 页
文档名称 文档密级

In the task

displayed

dialog box,

confirm the

collection.

In the

navigation tree

in the left pane,

choose
Downloading Environment information and
10 "Routine Kaung Myo Htet 16:30 -- 17:30
Location Information Task Results
Maintenance"

Click "Collect

and Check

System Info"

2019-9-13 华为保密信息,未经授权禁止扩散 第 14 页, 共 19 页
文档名称 文档密级

and click

"collect"collect

ion

information. In

the displayed

dialog to down

the health

check

information.

Login to U2000

Click

"Monitor" and
11 Check Alarm Kaung Myo Htet 17:30 -- 18:30
Click "Browse

Current Alarm"

2019-9-13 华为保密信息,未经授权禁止扩散 第 15 页, 共 19 页
文档名称 文档密级

##For more information please refer to the attachment::operation.xlsx

3.3 Test and Verification

Change Validation

No. * Test Item* Operation Method* Owner* Time*

1 Service test. Check U2000 Alarm and KPI Kaung Myo Htet 05:00 PM -- 6:00 PM

3.4 Solution for Changeback In the Case of Failure

3.4.1 Definition of Change Failure

Time:The roll back decision is going to made by 18:00 PM

Changeback time*/ Decision-maker:Customer- Paing Soe Tun

Changeback decision maker* (09- 09402660715) and Huawei-Fantao (09254155437/09977010463) confirm the

rollback procedure.

Rollback condition

Changeback condition

3.4.2 Changeback Steps

No.* Changeback Steps* Operation content* Onwer* Time*

This is monthly checking This is monthly checking


1 Kaung Myo Htet 17:30 -- 18:00
operation, no need to operation, no need to rollback

2019-9-13 华为保密信息,未经授权禁止扩散 第 16 页, 共 19 页
文档名称 文档密级

rollback

Login to U2000 Click "Monitor"

and Click "Browse Current

2 Check Alarm Alarm" Kaung Myo Htet 17:30 -- 18:00

Please refer to the:Alarm

3.4.3 Tests After Changeback

Rollback Validation

No. * Test Item* Operation Method* Owner* Time*

1 This is monthly checking operation, This is monthly checking operation, Kaung Myo Htet 05:00

no need to rollback no need to rollback

3.4.4 Changeback Risk Analysis

Main Issues and Risks


No.* Possibility* Impact* Countermeasure*
Description*

Health check

activity not Health check activity


1 No Risk Not impact any services
impact any not impact any services

services

2019-9-13 华为保密信息,未经授权禁止扩散 第 17 页, 共 19 页
文档名称 文档密级

3.5 Change of Spare Parts and Emergency Workstation

Type Content Planned Time

Spare parts Not required

4 Work After Change

4.1 Observation

Observation
No. Observation Item* Observation time* Owner*
method*

1 Alarm Whether there is new 2019-2-21 08:00 – Customer NOC or Kaung Myo

generated alarm 2019-2-21 06:00 Htet

2 KPI U2000 Performance 2019-2-21 08:00 – Customer NOC or Kaung Myo

Monitoring and RAN 2019-2-21 06:00 Htet

KPI report

Monitored Before Change After Change


NE Bias Accept Bias
KPI (Fill in) (Fill in)

RRC Setup

Success 98 %<

Rate

U2000 PS Setup 98 %<


98 %<
Success rate

eRAB Setup
98 %<
Success rate

2019-9-13 华为保密信息,未经授权禁止扩散 第 18 页, 共 19 页
文档名称 文档密级

##KPI_OBSERVATION_ATTACHMENT:

4.2 Other work

No. Work content Owner


1 Provide material

2 Provide software

3 Training

4 Notify customers of modifying the used account and password

5 Returning SIM cards and related tools

… …