Sie sind auf Seite 1von 80

Ver.

2015

Globally has shaped the modern skylines of brilliant


high-rises by providing the most efficient and affordable
concrete formwork solutions since 1985.
With S-FORM formnology, your design truthfully comes true.

www. .co.kr
Formnology
To make
Your design come true
www. .co.kr
The First Partner 04 _ 05

has contributed to world-class standards in concrete formwork since 1985.


We are willing to share the experience of world-class standards in concrete formwork with whom
have been looking for safe, smart, speedy aluminum formwork technology.
Please take a moment to see how we have successfully provided products and services to global
customers.

Contents 12 Aluminum Formwork 74 R&D


06 About us 36 Project Reference 75 Pre-Operational Inspection
07 History 54 Gang Formwork 76 Exhibition
08 Core Value 58 Climbing System 78 Global
10 Business Area 67 Civil Formwork
www. .co.kr

About

Dear Concrete Construction Personnel,

Since 1985, , also known as SAMMOK , has contributed to world-class standards


in commercial, residential, and civil concrete formwork construction in South Korea and overseas.

The 65 percent of domestic market share demonstrates our outstanding quality in our products and
services approved throughout the past and present customers’ brilliant projects.
One of the evidences is that our manufacturing facilities have been peerless one which is not only
equipped with fabrication lines but also from melting aluminum raw materials to barcode system for
utilitarian packing including shipment and going beyond that, we have recycling system for
inoperative aluminum forms considering environmental protection.

Our fabrication facilities which mainly produce aluminum formwork currently occupy 280,993㎡
(=69.43 Acre) and produce 350,000㎡(= 7,350 tons) per month. This is the biggest aluminum formwork
fabrication facilities existing in the world and now we have operated exclusive robot welding
automation lines to enhance exportability meeting increasing demands in overseas customers as of
2013.

We have operated overseas branches in Brazil, India, Malaysia, Singapore, and Vietnam and agent
offices in Japan, Philippines, Saudi Arabia, Senegal, and United States to meet overseas customers’
on-time satisfaction and maintenance of products and services.

would like to introduce its heritage of world-class standards in concrete formwork


construction for your esteemed company which has been thinking of safer, smarter, and speedier
concrete solutions for commercial, residential, or civil projects.

With formnology, we promise to make you be fulfilled with superior, substantial, and
brilliant formwork experience with us.

We wish you all the best for your bright future with

Yours Sincerely,

Joonnyun Kim, President


The First Partner 06 _ 07

Brief History

is an aluminum formwork firm has provided innovative concrete


formwork solutions in commercial, residential, and civil construction sector
fulfilled with environment-friendly philosophy since 1985.

1985. 06. Founded company as Sammok Precision and Industrial Co., Ltd.

1985. 06. Operated Paju factory

1992. 05. Finished constructing Sihwa Factory (1270-3, Jeongwang-dong, Siheung-si, Gyeonggido, Korea)

1993. 12. Registered International trade business

1994. 11. Won “One Million US Dollar Export Tower” (Ministry of Commerce, Industry and Energy)

1994. 12. Developed small-sized tower crane (2 ton, 3 ton, 8 ton, and luffing crane)

1996. 04. Listed in KOSDAQ

1996. 06. Developed Aluminum System Form

1996. 06. Achieved ISO 9001 certificate and KSF 8006 certificate

2004. 03. Merger with Dongil Steel Co., Ltd.

2005. 09. Construction of metal structures, licensed professional window contractors

2008. 12. Established mass Aluminum Formwork production system for monthly 350,000㎡ capacity

2009. 12. Currently holding 22 patents including the Industrial property right

2010. 12. Awarded the top prize by the Korean Ministry of Land, Transport and Maritime Affairs

2012. 01. Changed corporate identity as Co., Ltd.

2013. 06. Established Jincheon Factory, an Exclusive Pressing Extrusion and Fabrication Lines for Exportation

2014. 12. Closed deals worth USD 45 Million in overseasas

Challenge based on technology Expansion of business area Leap forward


1995 Finished constructing Sihwa 2nd Factory 2004 Merged with Dongil Steel Co., Ltd. 2008 Established mass production system for monthly
toproduceAluminum Formwork in March 190,000m2 capacity (Anseong Factory)
1985 Founded Company in June 2002 KSF8006 Certificate 2006 Operated facilities to melt and extrude aluminum
1996 Listed in KOSDAQ
www. .co.kr

The Key Core Values to Meet Your Satisfaction


The five steps in core value have been motivated and upgraded to make better products and serve better
services for clients. We always think the products in clients’ perspective and invest the internal programs that
have been absolutely the essence of innovation and creation.

Core Value Customer Impression Best talent


We are proud of providing our best products and In order to meet your satisfaction, we are pleased
services to our clients and listening to the voice to have formal and informal meetings in which
of the individuals that is fundamentally essence we are willing to show you how our talented
of innovation of our products. We are willing to designers, sales representatives, and site
take you a factory tour in which you may find supervisors figure out your doubt in drawings
unique and memorable moments that motivate and production lines.
to find more efficient and smart ways for your
projects.
The First Partner 08 _ 09

Our production facilities which mainly produce aluminum formwork have


fabrication capability up to 350,000㎡(=7,350 tons) per month.
This is the biggest aluminum formwork production facilities existing in the world.

Innovation and Change Challenge-Oriented Production & Site Management


The Internal Innovation Competition Award We never stop exploring! We inspect finished goods with bar-coding
Programs (IICAP) and flexible communication We know our responsibility to find new challenge system Which allows us to manage the cargo
channels allow our employees to find the that allow competitors can taste of experience status and do inspect the cargo again in person
essence of innovation for your projects and from your projects which would be representative before shipping process.
production lines. by itself. At your construction site, you will be loved to see
how our skilled supervisors manage the shipped
cargo and provide solutions for unexpected
events occurred .
www. .co.kr

Business Area

Aluminum
Formwork

1. Characteristics and merits 7. Staircase


2. The Eight Reasons to select 8. Dismantlement
3. Production Process 9. Drop Down System
4. Total Aluminum Recycling System 10. Support
5. Components 11. Girder Beam
Gang Formwork 6. Mock up 12. Table Formwork

1. Introduction
2. Characteristics and Merits
3. Applications

Climbing System 1. S.C.S (Safety Climbing System)


2. G. C. S (Guide Rail Climbing System)
3. A. C. S (Auto Climbing System)
4. P. C. S (Portable Climbing System)

1. Characteristics and Merits


2. Applications
Civil Formwork

1. Euro Form

Euro Form
The First Partner 10 _ 11

is the firm forming new path where we can find the


essence of innovation to make your design come true.

Output
Proportion of 2013 sales
Also known as Sammok, is the first motivator which has formed
Korean skylines in construction and engineering sectors with the creation of
aluminum formwork system and currently occupies 65 percent of market share
that represents our excellent reputation and technology among suppliers since
70% 1985. The export lines has been operated at Doonpo factory where export
orders have been exclusively and professionally managed as of 2012.

Proportion of 2013 sales


Gang form is a type of external formwork system for high-rise buildings and
23% apartments where the external surface is a row of identical walls and used for
vertical and horizontal accuracy.
It comes out with the cage which increase work efficiency which include
plastering work, installment and dismantlement of formwork.

Proportion of 2013 sales


There are four types of climbing system which are Auto Climbing System (A.C.S),
Portable Climbing System (P.C.S), Guide-rail Climbing System (G.C.S), and Safety
2%
Climbing System (S.C.S). A.C.S requires a hydraulic pump and well used for high-
rise buildings where reduction of construction period is priority. P.C.S requires
also a hydraulic pump, but it moves two stories in once, because hydraulic
cylinders are installed over the system, so it can be operated only by switching
the hydraulic pumps. G.C.S requires only 2 hours to shift up one story and S.C.S
is an assistant system to prevent unexpected accidents for main gang forms.

Proportion of 2013 sales

Specialized for civil engineering projects, Civil Formwork is valuable where the
4%
project consists of Pier, port, bridge, or dam. Our engineers have experienced
various civil engineering projects and they are Willing to share the experience
with you.

Proportion of 2013 sales

It can be applied to any type of applications with combination of standard


1% and non-standard panels and easy to solve the unexpected site problems
with connection of timber wood.
You may adjust easily the gap of forms ties caused by various levels of
concrete pressure and it is reusable after lifetime of timber wood.
www. .co.kr

Aluminum Formwork
Characteristics and Merits
The aluminum alloy, A6061-T6, is the limelight as the most suitable material for Industrial and residential construction,
improves performance efficiency, and solve the environmental problems that have been sprung from using conventional
formwork system.
The First Partner 12 _ 13

Aluminum Formwork
The Eight Reasons to select Aluminum Formwork for your project

Aluminum Formwork
We have world biggest aluminum production capacity : 350,000㎡ per month
1. Production (= 204 units of Korean typical apartment)
We dominate 65 percent of domestic markets as of 2012.

Just-in-Time With multiple production lines, we are the sole firm which can meet the client’s delivery
2.
Delivery terms.

Self-sufficient

Gang Formwork
Our own melting furnace, aluminum billet lines, and extrusion lines allows us to be self-
3. Aluminum sufficient for production materials.
Materials

One-piece in design and fabrication of pressing dies and pressed aluminum materials
4. Self-designed minimize loss or malfunction in use of construction. Our know-how in technology
Pressing dies guarantee competitive quality and life-span among other providers.

Reputation in The first inventor to introduce aluminum formwork system in Korea


5. Engineering and Develop 3D Design programs

Climbing System
Design program Various patents and property rights with regard to aluminum formwork system

Drop-Down System
Various Type of Aluminum Girder Beam
6. Items Production Aluminum Support
System Support

7. Barcode System The system allows us to chase the status of products from production to mock-up at site.
Civil Formwork

Supervision of Before the shipment arrives at the site, single or a group of skilled supervisors goes to the
8. on-site construction site to prepare mock-up the aluminum formwork system and manage
supervisor unexpected events that might occur.
www. .co.kr

Aluminum Formwork
Production Process

1. Melting 2. Casting 3. Extrusion

4. Cutting 5. Hole Processing 6. Notching

7. Welding 8. Auto Coating 9. Barcode Management


The First Partner 14 _ 15

Aluminum Formwork
Total Aluminum Recycling System Aluminum
Scrap Melting

Aluminum Formwork
The Aluminum Formwork which have been utilized to its
maximum usage are collected and sent to the factory's
cleansing, shot blasting and chemical treatment lines for
Formwork Aluminum
washing process and then segregated to reusable and Used on the site Recycling Extrusion
non-reusable formwork.

The non-reusable formwork is sent to the melting line for a


total recycling system process. Formwork
Manufacturing

Gang Formwork
Cleansing Shot Blasting Chemical Treatment

Melting Furnace Climbing System


Civil Formwork

Extrusion Lines
www. .co.kr

Aluminum Formwork
Components
Specifications
Wall Panel
Classification Contents

Material ALUMINUM - EXTRUSION : A6061 - T6

1. WALL PANEL : 600(W)×2300/2450(H)


500(W)×2300/2450(H)
450(W)×2300/2450(H)
400(W)×2300/2450(H)
Basic Panel
300(W)×23002450(H)
2. DECK PANEL : 600(W)×1200(H)
450(W)×1200(H)
3. DECK BEAM : 150(W)×900(H) ,1050(H)

1. Wedge Pin, Round Pin


2. STAIR PANEL
Accessories 3. PROP HEAD, Props
4. SLAB SOFFIT
5. Subsidiary material

Incorner Wall End Panel Beam-Panel Rocker

Connects two panels and Covers both edges of the panels Holds a wall panel and Connected to the bottom of
covers a scalloped edge Which are facing each other a wall end panel to be connected a wall panel, it is typically 50 mm
space where the two panels length, But it can be adjustable
meet by 5 mm
The First Partner 16 _ 17

Aluminum Formwork
Components

Aluminum Formwork
Wall End Panel Cap(WEP-CAP) Aluminum Support Deck Panel

Gang Formwork
Sustains the weight of concrete Connected with a prop head, it sustains Sustains the weight of concrete
while pouring and casting jobs the slab during concrete pour and casting. while pouring and casting jobs to form slab.

Climbing System
End Beam(EB) Beam Slab Soffit Length(BSL)

Civil Formwork

Connected with a prop head and a slab corner, Connected with a wall end panel and a beam panel, and a wall panel,
it sustains the deck panels It is used to form a door or a window.
www. .co.kr

Aluminum Formwork
Components
Middle Beam Prop Head(PH)

Connected between two prop heads, it sustains slab panels to form Placed between two middle beams or a middle beam
ceiling and an end beam, it is a main component that hold beams and
a support for concrete pour and casting

Joint Bar Slab Length(SL)

Joints the prop head and a middle beam or an end beam Joints a wall panel and a slab panel

Slab Incorner(SI) Slab Outcorner(SO)

Connects a wall panel and an internal slab panel Connects a wall panel and an external slab panel
The First Partner 18 _ 19

Aluminum Formwork
Components

Aluminum Formwork
Bracket
Elevator-Bracket Slab-Bracket Wall-Bracket

In order to install a working platform on scaffolding system, these brackets are fixed on the concrete wall after taking off the wall panels and ties

Gang Formwork
Accessories
Round Pin & Wedge Pin Long-Pin & Wedge Pin Flat-Tie

Climbing System
Used to joint the double-faced panels, it is
This is a main accessory which is mainly used adjustable to increase or decrease the size of the
to joint panels and we provide 10%-20% Locked in the hole of a joint bar, width of the double-faced panels as the length of
extra to prevent shortage Holds middle beam and prop head together panel varies

PVC-Sleeve Bracket Bolt & Nut Hook Kicker Bolt, Nut & Washer
Civil Formwork

In order to protect the flat tie As an embedded anchor, it fixes Installed on the bottom of wall As an embedded anchor, it fixes
stuck in the middle of concrete The bracket on the concrete panel surface, it holds a steel bar The bracket on the concrete
after casting, inserts the flat-tie surface while installing sustaining the pressure of surface while installing
inside of the PVC-Sleeve concrete to prevent leakage
www. .co.kr

Aluminum Formwork
Working Process
01 02 03 04

Marking ink-line Setting Wall re-bar

05 06 07 08

Setting Wall Panel

09 10 11 12

Setting Wall Panel Check

13 14 15 16

Setting Slab Soffit Length Setting Beam Panel Setting Slab Soffit Inconer

17 18 19 20

Setting Inconer Setting Slab Beam


The First Partner 20 _21

21 22 23 24

Aluminum Formwork
Setting Stair Panel Setting Slab Panel

25 26 27 28

Gang Formwork
Setting Slab Panel Fixing Setting Slab Panel

29 30 31 32

Climbing System
Fixing Slab Panel Setting re-bar on the Slab

33 34 35 36

Pouring Concrete Dismantlement of formwork

37 38 39 40
Civil Formwork

Moving Formwork Finished stair section Finished wall & slab section
www. .co.kr

Aluminum Formwork
Application
Aluminum Formwork Gang Formwork Climbing System Civil Formwork
22 _ 23
The First Partner

Aluminum Formwork
Application
www. .co.kr

Aluminum Formwork
Mock Up
SL & SI Beam

Wall & Deck Panel Staircase


Aluminum Formwork Gang Formwork Climbing System Civil Formwork
24 _ 25
The First Partner

Aluminum Formwork
Staircase
www. .co.kr

1 4

Aluminum Formwork 2 3

Dismantlement

Joint bar & Pin SL

Beam Deck Panel


The First Partner 26 _ 27

Aluminum Formwork
Drop Down System

Aluminum Formwork
Characteristics and Merits Drop Down Aluminum Support
Consisting of beam, drop head, support, and end drop down piec- Max.
es, the drop down system physically allows workers to improve 15 Allowed
Classification Supported Weight
Height
percent in work speed, because the system provides more space in Weight
wider gaps among installed supports, compared to conventional
AP-80 Below 2.9M 11640kgf 13kg
System.
It is basically convenient to use the system in the center of a metro-
AP-100 Below 5.1M 8560kgf 24kg
politan city areas without noise problems.
In a control of the drop head unit, you may take off whole slab pan-
• I n case that the allowed weight is used as the single supporting
els from the ceiling at once, but you do not worry about the safety
method, it means the weight applying the safety rate 3.
problems. The beam connected with the drop head unit holds all
• In case that it is used over the allowed height, separate structure is
the slab panels so you have enough time to take off individual
calculated.
panel.

Gang Formwork
Climbing System
Civil Formwork
www. .co.kr

Aluminum Formwork
Drop Down System
Components
The First Partner 28 _ 29

Aluminum Formwork
Drop Down System - Applications
Drop head system for dismantling

Aluminum Formwork
Front side
Flank

Drop installation Pin removal Drop head down Drop installation Pin removal Drop head down

Dismantling process(in site) JOIN AT LONG PIN


JOIN AT LONG PIN

Gang Formwork
JOIN AT LONG PIN

1. Pin removal 2. Drophead Down 3. Panel removal preperation 4. Panel removal

DISMANTLING LONG PIN

Climbing System
8. Concrete hardening 7. Beam removal(EB) 6. Beam removal(MB) 5. Panel removal
HAMMER AT PIN

Step 1 Setting JOIN AT LONG PIN


JOIN AT LONG PIN

JOIN AT LONG PIN

Step 2 Dismantlement
Civil Formwork

DISMANTLING LONG PIN


END DROP DOWN
DROP HAED DOWN

HAMMER AT PIN
www. .co.kr

Aluminum Formwork
Aluminum Support
Characteristics and Merits
The aluminum support is lighter than steel support and it withstands more weights.

The aluminum support is adjustable to each individual construction site conditions and it is available in different lengths
from 1.8 meters to 5.5 meters.
We have three types available in SAS 70, 80, and 100 and it can be used for a wide range of heights with single or couple
of support frames.

Specifications

Allowed Max.
Classification Supported Weight
Height
Weight
SAS - 70 Below 3.0M 5,090kgf 5.5 kg

SAS - 80 Below 3.5M 12,502kgf 8.5 kg

SAS - 100 Below 4.0M 14,949kgf 16.5 kg

• In case that the allowed weight is used as the single


supporting method, it means the weight applying
the safety rate 3.

• I n case that it is used over the allowed height,


separate structure is calculated.
The First Partner 30 _ 31

Aluminum Formwork
Aluminum Support - Applications

Aluminum Formwork
Gang Formwork
Climbing System
Civil Formwork
www. .co.kr

Aluminum Formwork
Aluminum Girder Beam
High tech aluminum girder beam is specially heat-treated as 6061-T6 material, which is light and strong. Because it
is structurally combined with veneer board, it can be used for various applications such as wall formwork, scaffold,
slab girder, etc.

Light Formwork Simple and Easy Environmental Problem


System Method to use Improvement
The First Partner 32 _ 33

Aluminum Formwork
Aluminum Girder Beam - Applications

Aluminum Formwork
Gang Formwork
Climbing System
Civil Formwork
www. .co.kr

Aluminum Formwork
Table Formwork
Characteristics and Merits
Light weight realization because of treating underfloor support beam, yoke, accouplement and support with aluminum
(6061-T6 type).
Reduced erection time due to simple and convenient connection method using special bolt and connector.
Safe system form designed for various floor height and slab thickness.
Environmentally friendly system with recycling capability.
Basic module 2150*4000 / 2150*5000 / 2650*4000 / 2650*5000 of 1 span.

Environmentally
Light Weight Reduced Erection Safe System Basic Module
Friendly
Realization Time Form Design
System
The First Partner 34 _35

Aluminum Formwork

Aluminum Formwork
Main

Gang Formwork
Support Support Beam

Climbing System
Girder Detail Detail
Civil Formwork
www. .co.kr

Project Reference
Global
has devoted itself to supply aluminum formwork by participating in various projects in architecture and civil
work field. From domestic to global, up to 300 companies have been satisfied by the quality of construction with
’s formwork system while it performs 800 projects annually.
The First Partner 36 _37

Project Reference
Country Garden Danga Bay Setia Pinnacle

Aluminum Formwork
PROJECT NAME : Country Garden Danga Bay Country: Malaysia PROJECT NAME : Setia Pinnacle Country : Malaysia
01 CONSTRUCTION TYPE : Aluminum Formwork 02 CONSTRUCTION TYPE : Aluminum Formwork

Gang Formwork
Sandilands Taman Pulasan 5

Climbing System
PROJECT NAME : Sandilands Country : Malaysia PROJECT NAME : Taman Pulasan 5 housing Country : Malaysia
03 CONSTRUCTION TYPE : Aluminum Formwork 04 CONSTRUCTION TYPE : Aluminum Formwork

The Establishment Tree Sparina


Civil Formwork

PROJECT NAME : The Establishment Country: Malaysia PROJECT NAME : Tree Sparina Country: Malaysia
05 CONSTRUCTION TYPE : Aluminum Formwork 06 CONSTRUCTION TYPE : Aluminum Formwork
www. .co.kr

Project Reference
EPIC Johor Bahru M Condominium

PROJECT NAME : EPIC Johor Bahru Country: Malaysia PROJECT NAME : M Condominium Country : Malaysia
07 CONSTRUCTION TYPE: Aluminum Formwork 08 CONSTRUCTION TYPE: Aluminum Formwork

Serai Bukit Bandaraya Encorp Marina

PROJECT NAME : Serai Bukit Bandaraya Country : Malaysia PROJECT NAME : Encorp Marina Country : Malaysia
09 CONSTRUCTION TYPE: Aluminum Formwork 10 CONSTRUCTION TYPE: Aluminum Formwork

Pandan Residence II Sunway Montana

PROJECT NAME : Pandan Residence II Country: Malaysia PROJECT NAME : Sunway Montana Country: Malaysia
11 CONSTRUCTION TYPE: Aluminum Formwork 12 CONSTRUCTION TYPE: Aluminum Formwork
The First Partner 38 _ 39

Project Reference
PR1MA Alam Damai KoUMS

Aluminum Formwork
PROJECT NAME : PR1MA Alam Damai Country: Malaysia PROJECT NAME : KoUMS Country : Malaysia
13 CONSTRUCTION TYPE : Aluminum Formwork 14 CONSTRUCTION TYPE : Aluminum Formwork

Gang Formwork
1 Medini Residences You Residences

Climbing System
PROJECT NAME : 1 Medini Residence Country : Malaysia PROJECT NAME : You Residences Country : Malaysia
15 CONSTRUCTION TYPE : Aluminum Formwork 16 CONSTRUCTION TYPE : Aluminum Formwork

Ion D'Elemen @ Genting SummerScape


Civil Formwork

PROJECT NAME : Ion D'Elemen @ Genting Country: Malaysia PROJECT NAME : SummerScape Country: Malaysia
17 CONSTRUCTION TYPE : Aluminum Formwork 18 CONSTRUCTION TYPE : Aluminum Formwork
www. .co.kr

Project Reference
Ameera Residences One Imperial Residences

PROJECT NAME : Ameera Residences Country: Malaysia PROJECT NAME : One Imperial Residences Country : Malaysia
19 CONSTRUCTION TYPE : Aluminum Formwork 20 CONSTRUCTION TYPE : Aluminum Formwork

Nusa Heights Sky Suites @ Meldrum Hills

PROJECT NAME : Nusa Heights Country : Malaysia PROJECT NAME : Sky Suites @ Meldrum Hills Country : Malaysia
21 CONSTRUCTION TYPE : Aluminum Formwork 22 CONSTRUCTION TYPE : Aluminum Formwork

Ivory Residences Damansara Foresta

PROJECT NAME : Ivory Residences Country: Malaysia PROJECT NAME : Damansara Foresta Country: Malaysia
23 CONSTRUCTION TYPE : Aluminum Formwork 24 CONSTRUCTION TYPE : Aluminum Formwork
The First Partner 40 _ 41

Project Reference
Mirage by The Lake Condominium Telupid Jaya Commercial Centre

Aluminum Formwork
PROJECT NAME : Mirage by The Lake Condominium Country: Malaysia PROJECT NAME : Telupid Jaya Commercial Centre Country : Malaysia
25 CONSTRUCTION TYPE: Aluminum Formwork 26 CONSTRUCTION TYPE: Aluminum Formwork

Gang Formwork
Anak Bukit Housing Development Horizon Residences

Climbing System
PROJECT NAME : Anak Bukit Housing Development Country : Malaysia PROJECT NAME : Horizon Residences Country : Malaysia
27 CONSTRUCTION TYPE: Aluminum Formwork 28 CONSTRUCTION TYPE: Aluminum Formwork

Palma Laguna Water Park Condominium Laman Ceylon Serviced Residences


Civil Formwork

PROJECT NAME : Palma Laguna Water Park Condominium Country: Malaysia PROJECT NAME : Laman Ceylon Serviced Residences Country: Malaysia
29 CONSTRUCTION TYPE: Aluminum Formwork 30 CONSTRUCTION TYPE: Aluminum Formwork
www. .co.kr

Project Reference
Fraser Residences Menara Kembar Bank Kerjasama Rakyat

PROJECT NAME : Fraser Residences Country: Malaysia PROJECT NAME : Menara Kembar Bank Keriasama Rakyat Country : Malaysia
31 CONSTRUCTION TYPE: Aluminum Formwork 32 CONSTRUCTION TYPE: Aluminum Formwork

The Royal Regent Condominium Bay 21 Condominium

PROJECT NAME : The Royal Regent Condominium Country : Malaysia PROJECT NAME : Bay 21 Condominium Country : Malaysia
33 CONSTRUCTION TYPE: Aluminum Formwork 34 CONSTRUCTION TYPE: Aluminum Formwork

Sri Utama Condominium Anak Bukit Housing Development

PROJECT NAME : Sri Utama Condominium Country: Malaysia PROJECT NAME : Anak Bukit Housing Development Country: Malaysia
35 CONSTRUCTION TYPE: Aluminum Formwork 36 CONSTRUCTION TYPE: Aluminum Formwork
The First Partner 42 _ 43

Project Reference
San Francisco Villa Utama South Condominium

Aluminum Formwork
PROJECT NAME : San Francisco Villa Country: Malaysia PROJECT NAME : Utama South Condominium Country : Malaysia
37 CONSTRUCTION TYPE: Aluminum Formwork 38 CONSTRUCTION TYPE: Aluminum Formwork

Gang Formwork
Twin Peaks @ Leonie Hill South Beach

Climbing System
PROJECT NAME : Twin Peaks @ Leonie Hill Country : Singapore PROJECT NAME : South Beach Country : Singapore
39 CONSTRUCTION TYPE: Aluminum Formwork 40 CONSTRUCTION TYPE: Aluminum Formwork

The Colors Townhouses An Phu


Civil Formwork

PROJECT NAME : The Colors Townhouses Country: Thailand PROJECT NAME : An Phu Country : Vietnam
41 CONSTRUCTION TYPE: Aluminum Formwork 42 CONSTRUCTION TYPE: Aluminum Formwork
www. .co.kr

Project Reference
Mariana One Parcel - 5

PROJECT NAME : Marina One Country: Singapore PROJECT NAME : Parcel - 5 Country: Singapore
43 CONSTRUCTION TYPE: Aluminum Formwork
44 CONSTRUCTION TYPE: Aluminum Formwork

Lucky Tower Cosmopolis

PROJECT NAME : Lucky Tower Country : Singapore PROJECT NAME : Cosmopolis Country : India
45 CONSTRUCTION TYPE: Aluminum Formwork 46 CONSTRUCTION TYPE: Aluminum Formwork

Centerio Wisteria

PROJECT NAME : Centerio Country: India PROJECT NAME : Wisteria Country : India
47 CONSTRUCTION TYPE: Aluminum Formwork 48 CONSTRUCTION TYPE: Aluminum Formwork
The First Partner 44 _ 45

Project Reference
GC 14 Sportswood

Aluminum Formwork
PROJECT NAME : GC 14 Country: India PROJECT NAME : Sportswood Country : India
49 CONSTRUCTION TYPE: Aluminum Formwork 50 CONSTRUCTION TYPE: Aluminum Formwork

Gang Formwork
Gaur City 2 Gaur Yamuna City

Climbing System
PROJECT NAME : Gaur City 2 Country : India PROJECT NAME : Gaur Yamuna City Country: India
51 CONSTRUCTION TYPE: Aluminum Formwork 52 CONSTRUCTION TYPE: Aluminum Formwork

Lakefront Time City


Civil Formwork

PROJECT NAME : Lakefront Country : India PROJECT NAME : Time city Country : Vietnam
53 CONSTRUCTION TYPE: Aluminum Formwork 54 CONSTRUCTION TYPE: Aluminum Formwork
www. .co.kr

Project Reference
Ireo Hills GCVL Ghansol I

PROJECT NAME : Ireo Hills Country: India PROJECT NAME : GCVL Ghansol I Country : India
55 CONSTRUCTION TYPE: Aluminum Formwork 56 CONSTRUCTION TYPE : Aluminum Formwork

L&T Omkar Malad River Garden

PROJECT NAME : L&T Omkar Malad Country: India PROJECT NAME : River Garden Country: Mongolia
57 CONSTRUCTION TYPE: Aluminum Formwork 58 CONSTRUCTION TYPE: Aluminum Formwork

Experion Palava

PROJECT NAME : Experion Country: India PROJECT NAME : Palava Country : India
59 CONSTRUCTION TYPE: Aluminum Formwork 60 CONSTRUCTION TYPE: Aluminum Formwork
The First Partner 46 _ 47

Project Reference
Venezia MyCity

Aluminum Formwork
PROJECT NAME : Venezia Country : India PROJECT NAME : MyCity Country : India
61 CONSTRUCTION TYPE: Aluminum Formwork 62 CONSTRUCTION TYPE: Aluminum Formwork

Gang Formwork
Petal DLF Ultima

Climbing System
PROJECT NAME : Petal Country: India PROJECT NAME : DLF Ultima Country: India
63 CONSTRUCTION TYPE: Aluminum Formwork 64 CONSTRUCTION TYPE: Aluminum Formwork

Dosti Imperia Tata Housing


Civil Formwork

PROJECT NAME : Dosti Imperia Country: India PROJECT NAME : Tata Housing Country : India
65 CONSTRUCTION TYPE: Aluminum Formwork 66 CONSTRUCTION TYPE: Aluminum Formwork
www. .co.kr

Project Reference
Arena Silicon Oasis

PROJECT NAME : Arena Country : India PROJECT NAME : Silicon Oasis Country : India
67 CONSTRUCTION TYPE: Aluminum Formwork 68 CONSTRUCTION TYPE: Aluminum Formwork

Indraprasta Ireo The Corridors

PROJECT NAME : Indraprasta Country: India PROJECT NAME : Ireo The Corridors Country: India
69 CONSTRUCTION TYPE: Aluminum Formwork 70 CONSTRUCTION TYPE: Aluminum Formwork

Cidade Jardim Villa Matao

PROJECT NAME : Cidade Jardim Country: Brazil PROJECT NAME : Villa Matao Country: Brazil
71 CONSTRUCTION TYPE: Aluminum Formwork 72 CONSTRUCTION TYPE: Aluminum Formwork
The First Partner 48 _ 49

Project Reference
Juliano Moreira Rio Cangulo

Aluminum Formwork
PROJECT NAME : Juliano Moreira Country : Brazil PROJECT NAME : Rio Cangule Country : Brazil
73 CONSTRUCTION TYPE: Aluminum Formwork 74 CONSTRUCTION TYPE: Aluminum Formwork

Gang Formwork
Curral Novo Candeia Village

Climbing System
PROJECT NAME : Curral Novo Country : Brazil PROJECT NAME : Candeia Village Country: Brazil
75 CONSTRUCTION TYPE: Aluminum Formwork 76 CONSTRUCTION TYPE: Aluminum Formwork

Monte Ville Palm Village


Civil Formwork

PROJECT NAME : Monte Ville Country: Brazil PROJECT NAME : Palm Village Country: Brazil
77 CONSTRUCTION TYPE: Aluminum Formwork 78 CONSTRUCTION TYPE: Aluminum Formwork
www. .co.kr

Project Reference
Gajaewool District 4 E-Pyeonhan Sesang Mapo

PROJECT NAME : Gajaewool District 4 Client : SK Construction PROJECT NAME : E-Pyeonhan Sesang Mapo Client : Daelim
79 CONSTRUCTION TYPE: Aluminum Formwork 80 CONSTRUCTION TYPE: Aluminum Formwork

Songdo Okay Center Acrotel Daelim

PROJECT NAME : Songdo Okay Center Client : Daewoo Construction PROJECT NAME : Acrotel Daelim Client : Daelim Construction
81 CONSTRUCTION TYPE: Aluminum Formwork 82 CONSTRUCTION TYPE: Aluminum Formwork

Mijin EasyVia Wide Myeonggok Incheon Guweol Asiad Sports Town

PROJECT NAME : Mijin EasyVia Wide Myeonggok Client : Mijin Construction PROJECT NAME : Guweol Asiad Sports Town Client : Hyundai E&C
83 CONSTRUCTION TYPE: Aluminum Formwork 84 CONSTRUCTION TYPE: Aluminum Formwork
The First Partner 50 _ 51

Project Reference
Kwangju National Rental Apt. Yongdu Lotte Castle Rich

Aluminum Formwork
PROJECT NAME : Kwangju National Rental Apt. Client : Namhae Development PROJECT NAME : Yongdu Lotte Castle Rich Client : Lotte Construction
85 CONSTRUCTION TYPE: Aluminum Formwork 86 CONSTRUCTION TYPE: Aluminum Formwork

Gang Formwork
Jungja Emco Herits Ilsan Yojin Y-City

Climbing System
PROJECT NAME : Jungja Emco Herits Client : Hyundai E&C PROJECT NAME : Ilsan Yojin Y-City Client : Yojin Construction
87 CONSTRUCTION TYPE: Aluminum Formwork 88 CONSTRUCTION TYPE: Aluminum Formwork

Dongtan Hoban Berdium New Dongtan View Park


Civil Formwork

PROJECT NAME : Dongtan Hoban Berdium Client : Hoban Construction PROJECT NAME : New Dongtan View Park Client : Daewoo Construction
89 CONSTRUCTION TYPE: Aluminum Formwork 90 CONSTRUCTION TYPE: Aluminum Formwork
www. .co.kr

Project Reference
Suwon Hill State City Raemian Bamseom Revenue

PROJECT NAME : Suwon Hill State City Client : Hyunday E&C PROJECT NAME : Raemian Bamseom Revenue Client : Samsung CNT
91 CONSTRUCTION TYPE: Aluminum Formwork 92 CONSTRUCTION TYPE: Aluminum Formwork

Busan Jisadong Kyeongbuk Andong

PROJECT NAME : Busan Jisadong Client : Dongbu E&C PROJECT NAME : Kyeongbuk Andong Client : GS Construction
93 CONSTRUCTION TYPE: Aluminum Formwork 94 CONSTRUCTION TYPE: Aluminum Formwork

Kimcheon Hyeokshin City II Mapo Gongdeok Xii

PROJECT NAME : Kimcheon Hyeokshin City II Client : YoungMu E&C PROJECT NAME : Mapo Gongdeok Xii Client : GS E&C
95 CONSTRUCTION TYPE: Aluminum Formwork 96 CONSTRUCTION TYPE: Aluminum Formwork
The First Partner 52 _ 53

Project Reference
Gangnam Bogeumjari Jeongjin

Aluminum Formwork
PROJECT NAME : Gangnam Bogeumjari Client : Halla Construction PROJECT NAME : Jeongjin Client : Shinsaegae Construction
97 CONSTRUCTION TYPE: Aluminum Formwork 98 CONSTRUCTION TYPE: Aluminum Formwork

Gang Formwork
Gunsan Ulsan Bluma

Climbing System
PROJECT NAME : Gunsan Client : Hyundai Industry & Development PROJECT NAME : Ulsan Bluma Client : Daewoo E&C
99 CONSTRUCTION TYPE: Aluminum Formwork 100 CONSTRUCTION TYPE: Aluminum Formwork

Dangsandong High Tech City


Civil Formwork

PROJECT NAME : Dangsandong Client : SK Construction PROJECT NAME : High Tech City Client : Ace E&C
101 CONSTRUCTION TYPE: Aluminum Formwork 102 CONSTRUCTION TYPE: Aluminum Formwork
www. .co.kr

Gang Formwork
Gang Formwork means large-sized formwork used on the Gang Formwork
structure of the same up and down surface, Characteristics and Merits
manufacturing scaffold cage for installing and Setting Images & Layout
disassembling external wall formwork, plastering and
decorating as an integrated system.
The First Partner 54 _ 55

Gang Formwork
Gang Formwork is taken to prevent thoroughly outer wall's frame quality of apartment and general building

Aluminum Formwork
from arising and consecutively construct framework and following finishing work of high-rise building with
equal quality.

Environmental
Improved Frame Reduced
What is Cage? Problem
Quality Construction Costs
Improvement

Characteristics and Merits


What is Cage?

Gang Formwork
As the part except for outer wall formwork, it means the part to be connected
with gang formwork, being composed of scaffold, safety rail and etc. necessary
to perform safe formwork installation & disassembly, following plastering &
decoration and etc.

Improved Frame Quality and Structure Performance


Gang formwork can guarantee vertical and horizontal accuracy of frame,
superior connection quality between panel and panel with reduced decorating
work and improve construction quality and structure performance of frame,
holding temporary construction of worker.

Climbing System
Reduced Construction Costs
Because it is simple and easy way to use, non-experienced worker’s
participation ratio to work is high, which it reduces labor costs. Post process
costs like chipping are also saved due to superior concrete construction.

Environmental Problem Improvement


Construction waste occurring in the conventional construction type can be
suppressed minimizing the use of the limited resources like veneer board and
timber. Aluminum panel is environment-friendly product possible to reuse.
Civil Formwork
www. .co.kr

Gang Formwork
Aluminum Formwork Gang Formwork Climbing System Civil Formwork
56 _ 57
The First Partner

Gang Formwork
www. .co.kr

Climbing System
S.C.S (Safety Climbing System)
G.C.S (Guide Rail Climbing System)
A.C.S (Auto Climbing System)
P.C.S (Portable Climbing System)
The First Partner 58 _ 59

Climbing System
There are four types of climbing system which are Auto Climbing System (A.C.S), Portable Climbing System

Aluminum Formwork
(P.C.S), Guide-rail Climbing System (G.C.S), and Safety Climbing System (S.C.S). A.C.S requires a hydraulic
pump and well used for high-rise buildings where reduction of construction period is priority.

A.C.S(Auto Climbing System) P.C.S(Portable Climbing System)

Gang Formwork
Without a tower crane, the form system can be easily It is an automatic system to pull up two forms at once while
controllable with a hydraulic pump. It is an economical moving portable hydraulic pump on scaffold or slab. It is more
solution for high-rise buildings. competitive than A.C.S system.

Climbing System
G.C.S(Guide rail Climbing system) S.C.S(Safety Climbing System)

Civil Formwork

It is a climbing system which is extremely efficient and It is pull-up auxiliary system by attaching rail and shoe to
economic, so that you may quickly take a process on gang form existing gang formwork for safe pull-up, which prevents gang
with a tower crane. It can be controlled by using only 2.4m- formwork fall with cheap expense.
width gear tool!
www. .co.kr

Climbing System
A.C.S(Auto Climbing System)

By using hydraulic pump without tower’s help, the Auto Climbing System pulls up other system consisting of mold and
scaffold, which reduces construction period when applied to extra high-story building construction.

Characteristics and merits

Because two floors support weight, it can quickly process construction without be influenced in
Safe winter season.

Easy Because hydraulic cylinder is attached to the whole system, you can quickly perform pull-up work.

By making system lighter, it has less weight limitation and because anchor guide is light, work
Light performance is improved.

In the case of performing core pre-construction, steel rod construction is possible without halfen
Comfortable box.

Guarantee safety of extra high building construction through structure design considering form
High build weight.

When assembling ACS system, because you can stand it up after finishing assembling it, you have
Wide space less limitation on assembling space.
The First Partner 60_ 61

Climbing System

Aluminum Formwork
Gang Formwork
Typical cylinder working steps

Climbing System
Civil Formwork
www. .co.kr

Climbing System
P.C.S(Portable Climbing System)

It is automatic pulling-up system to pull up 2 molds at a time while moving through scaffolds or slabs together with portable
hydraulic pump, which is more economic than existing ACS system.

Characteristics and merits

Safe Anchor Because two floors support weight, it can quickly process construction without influence
system in winter season.

System Because hydraulic cylinder is attached to the whole system, you can promptly use it by moving
configuration is hydraulic pump and connecting hydraulic hose. Therefore, you can safely and quickly work
easily used with it

System is lighter
By making system lighter, it has less weight limitation and because anchor guide shoe is light,
through optimized working performance is improved.
structure design

It can be quickly
When assembling ACS system, because you can stand it up after finishing assembling it,
assembled in you have less limitation on assembling space.
narrow space
The First Partner 62_ 63

Climbing System

Aluminum Formwork
P.C.S - A
A-Type P.C.S is suitable for high-rise floored building, only hydraulic pump will be moved on while
the cylinder is fixed.

Gang Formwork
P.C.S - M
M-Type P.C.S is suitable for law or middle-rise floored building, hydraulic pump and cylinder will be
move on at the same time.

Climbing System
P.C.S - P
Portable Climbing System Protection is used to lift only slab panels.
Civil Formwork
www. .co.kr

Climbing System
G.C.S (Guide Rail Climbing System)

It is an extremely efficient and econocim system, so that you way quickly takea process on gang form with a tower crane it can
be controlled by using only 2.4m-width gear tool.

Characteristics and merits

Quick Working time to pullup first floor is possible to be done within 2~3hours, which reduces
working speed construction period because of prompt pulling-up work.guration is easily used

Economic
The safe anchor system that supports weight on 2 concrete casting floors enables prompt
Rail system to
construction process to be carried out in winter season, too.
prevent accident

Light weight
Weight is less limited by the light system and improved working is guaranteed because of light
realization with guide shoe for anchor.
Aluminum materials

Simple structure, Possible rebar construction without Halfen box in case of the core construction type.
Quick assembling

Fall prevention
Guarantee safety for high building construction through structure calculation
through structural considered formwork weight.
design
The First Partner 64 _ 65

Climbing System

Aluminum Formwork
Safe outside working space

Gang Formwork
2hr ~ 3hr for climbing 1 building by crane

Typical Sequence of G.C.S Bracket

Climbing System
6F

SAMMOK SAMMOK

SAMMOK
Yun-Young Jun
안전 SAMMOK
Yun-Young Jun
안전
제일 제일

5F

SAMMOK SAMMOK SAMMOK

SAMMOK
Yun-Young Jun
안전 SAMMOK
Yun-Young Jun
안전 SAMMOK
Yun-Young Jun
안전
제일 제일 제일

4F

3F
Civil Formwork

SAMMOK

안전
SAMMOK
Yun-Young Jun 제일

2F

1F
1 STEP 2 STEP 3 STEP 4 STEP 5 STEP 6 STEP 7 STEP 8 STEP 9 STEP
www. .co.kr

Climbing System
S.C.S (Safety Climbing System)

Gang Form

Gang Form Cage

Characteristics and merits

Economic
It is pull-up auxiliary system by attaching rail and shoe to existing gang formwork for safe pull-
Rail system to
up, which prevents gang formwork fall with cheap expenses
prevent accident

Light weight
Because hydraulic cylinder is attached to the whole system, you can quickly perform pull-up
realization with work.
Aluminum materials

Simple structure, It can be attached to gang formwork without any special tools, which reduces initial assembling
Quick assembling expenses.

Fall prevention
It is automatic locking system to basically block falling gang formwork, which is safe
through structural system designed to prevent guide shoe’s breakdown by impact weight.
design
The First Partner 66 _ 67

Civil Formwork
Civil Formwork is suitable for any type of civil engineering projects which have big scale of size and require advanced

Aluminum Formwork
technology such as Pier Cap, Slip, Caisson, Special Block, and Auto Climbing System Formwork to ensure safety of project.

Gang Formwork
Climbing System
Civil Formwork
www. .co.kr

Civil Formwork
With the area of 358,113㎡ since 2008, we have accomplished various types of representative civil engineering projects in
Korea.
It is designed to guarantee the safety of workers with providing more efficient construction environment .
The Four key points mentioned as below are the most common advantage found in the construction process.

Safety and Easy Structural Safety and


Efficient and Economic Tailor-made System
Design
Operation Conditions
Completeness

Applications
Bridges and Civil engineering Formwork (Pier Formwork, Pier Cap Formwork, Box Formwork)
Aluminum Formwork Gang Formwork Climbing System Civil Formwork
68_ 69
The First Partner

Civil Formwork
Applications
www. .co.kr

Civil Formwork

ALUMINUM FORMWORK
Can be large and lightweight, and excellent
workability and usability

WOOD FORMWORK
Formwork that able the form lining process
right away

STEEL FORMWORK
Excellent rigidity and durability Suitable for a
constructions of geometric form
The First Partner 70 _ 71

Civil Formwork

Aluminum Formwork
A.C.S (AUTO CLIMBING SYSTEM)
FORM SYSTEM that utilizes hydraulic pressure
without tower crane
Economic construction is possible for high
altitude work

Gang Formwork
N.C.S (NORMAL CLIMBING SYSTEM)
Rapid rise using the tower crane is possible, it is
suitable for PYLON, LNG TANK, such PIER.

Climbing System
SLIP FORM SYSTEM
There is no construction joints, shortening of the
construction period is possible.
Civil Formwork
www. .co.kr

Civil Formwork

MOVING SYSTEM
Apply BOX FORM OR FSM FORM to projects where
cross-section change is small.

STEEL SUPPORT (BENT)


A support system that uses steel beams and vertical
steel members.

SYSTEM SUPPORT
Install by using the human resources in combination
vertical, horizontal, such as bracing

ALUMINUM SUPPORT
Lighter than steel system support, Enables to support
more load
The First Partner 72 _ 73

Civil Formwork

Aluminum Formwork
We , provide
a differentiated System Solution.

Convenience of installation and dismantling

Frame structure without additional reinforcement member

Safe working environment through the integration of the Form and work

Gang Formwork
facilities

Reduction of the construction period

Cost reduction through reusing nearly all materials, except for a one-time
consumables

Improve proficiency of workers through repetitive work

Convenience of Safe Reduction Effect Climbing System


installation and working of the construction of the cost
dismantlement environment period reduction
Civil Formwork

Customer satisfaction is top priority for S-FORM


www. .co.kr

Research & Development


In order to meet the client’s requirement and satisfaction, we have focused on developing more efficient and smart solutions
combining with innovative internal programs.

For example, we have invested on 3D architecture programs and internal employee programs in which our personnel set
individual goals to challenge themselves and the firm manage the goals with BSC (Balanced Scorecard) to monitor the
process.

Every week, we have quality control and production meeting in which each representative reports and discusses about
positive and negative results to find potential synergy effect.

Furthermore, we have formed the future with world largest production capability, just it time delivery, self-sufficient material
supply system, 3D architecture design programs, durability management, barcode system to chase the shipment and stock
management, and site supervisor service to monitor the mock up process for your project.
74 _ 75
The First Partner

Pre-Operational Inspection
The Pre-operational inspection before shipment is a mandatory procedure to make our clients be satisfied,
and guarantee the best quality on job site. During the pre-operational inspection, we inspect every single part
of the entire formwork to correct potential defects and to make sure that the formwork be fabricated properly
upon client’s request.
www. .co.kr

Exhibition
At least twice a year, we have met global customers via World of Concrete in Las Vegas, Concrete Show in Brazil, and other
exhibitions in India and Malaysia for making relationship stronger and promote world-class standards in aluminum
formwork to whom have been looking for safe, smart, and speedy technology in concrete construction business.

For more details about upcoming participation, please visit our website at www. s-form.co.kr or www.s-form.com.br
The First Partner 76 _ 77

Exhibition
www. .co.kr

Global
Distribution Network

Mongolia Office

Japan Office

Saudi Arabia Office


India Office Vietnam Office
Senegal Office Philippines Office
Malaysia Office
Singapore Office
Indonesia Office

Overseas
Brazil Av. Marquês de São Vicente 446, SL 1416 e 1418, Barra Funda, São Paulo, SP. CEP. 01139-000 TEL. +55 11 3392-6358 / 6364
India Unit No. 323, 3rd floor, Spazeitech park, Sector-49, Sohna Road, Gurgaon, Haryana – 122101 TEL. +91-11-4953-7777
Indonesia GD, Istora Unit III Senayan Lt. 2 Sayap Barat Pintu A 5-A 6, Jakarta Pusat TEL. +62-812-9347-2221
Japan 6-4-3, 4F Koujimachi Chiyoda-Ku Tokyo 102-0083 Japan TEL.+81 90 1856 0570
Malaysia L-3-9, Plaza Damas, No. 60, Jalan Sri Hartamas 1, Sri Hartamas, 50480 Kuala Lumpur, Malaysia TEL. +60-3-6201-2212
Malaysia factory Lot 5792, Kawasan Perindustrian Nilai,Nilai, Daerah Seremban, Negeri Seremban, Negeri Semnilan, Malaysia. TEL. +60-12-262-8599
Mongolia #57-8, Enkhtaivan Avenue, 2nd khoroo, Bayangol District, Ulaanbaatar city, Mongolia TEL. +976-9999-5467 / 3074
Philippines
Saudi Arabia P. O. Box 2404 Riyadh 11451 Saudi Arabia TEL. +966 1 4024865 / 4051227
Senegal 326 Route des Almadies Yoff senegal Africa TEL. +211-77-459-2778
Singapore No 12 Aljunied Road KH Plaze #06-02 Singapore 389801 TEL. +65-6744-8014
U.S.A 3500 Lenox Rd suite 1500 Atlanta Ga 30326 USA TEL. +1-678-283-8521
Vietnam Plot 4, group 41, trung hoa ward, cau giay district hanoi, Vietnam TEL. +84-4-3555-8423
The First Partner 78 _ 79

U.S.A Office

KOREA

Headquarters
/ Seoul office
Sihwa Factory
Anseong Factory
Jincheon Factory

Brazil Office
Daegu office

Busan office
Gwangju office

Domestic
Headquarters Sammok Bldg., 826-10, Yeoksam-dong, Gangnam-gu, Seoul, Korea TEL. +82-2-561-0941 FAX. +82-2-554-9389

Seoul Office 3F Seoul Bldg., 338, Gangnam-daero, Gangnam-gu, Seoul, Korea TEL. +82-2-561-0941 FAX. +82-2-561-1121

Busan Office #701, 19, World cup-daero, 243beon-gil, Yeonje-gu, Busan, Korea TEL. +82-51-506-8591 FAX. +82-51-506-8594

Gwangju Office #903, 339, Cheonbyeonu-ro, Dong-gu, Gwangju, Korea TEL. +82-62-222-2370 FAX. +82-62-228-0966

Daegu Office #207, 201dong, 863, Gukchaebosang-ro, Dong-gu, Daegu, Korea TEL. +82-53-743-8591 FAX. +82-53-743-8590

Anseong Factory 474-40, Anseongmatchum-daero, Miyang-myeon, Anseong-si, Gyeonggi Province, Korea TEL.+82-31-677-1234 FAX. +82-31-677-0320

Jincheon Factory 539, Joongmi-ro, Iwol-myeon, Jincheon-Gun, Chungcheongbuk-do, Korea FAX. +82-43-715-5889

Sihwa Factory 52, 206beon-gil, Gongdan 1-daero, Siheung-si, Gyeonggi Province, Korea TEL. +82-31-498-2511 FAX. +82-31-498-2515
CopyrightⓒS-FORM CO., LTD.

Sammok Bldg., 826-10, Yeoksam-dong, Gangnam-gu, Seoul, Korea


TEL. +82-2-561-0941 FAX. +82-2-554-9389 www.s-form.co.kr E-mail : ask@s-form.co.kr

Das könnte Ihnen auch gefallen