Sie sind auf Seite 1von 10

ANNEXURE- 7.

1
FORMAT F-1
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY) (See Para 7.2
SUMMARY SHEET

Unconnected Habitations
Name of the Total No. of
Code 250-499 Total Eligible
Block Habitations >1000 500-999 <250 Habitations
Total Eligible
Billawar

Type of No. of Total Length of No. of New CD Estimated Cost (Rs. Lacs) No. of Unconnected
Proposal Roads Roads (Km) Structures Habitations
connected/connected
Pavment from CD Structure From Total [(5) + (6)] habitations benefited
Format-F 6 format-F 7
1 2 3 4 5 6 7 8
New 1 6.925 -- 269.34 124.22 393.56
Connectivity

Junior Engineer Asstt. Executive Engineer Executive Engineer,


FORMAT F-2 A
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
ROAD PROPOSED IN PMGSY FOR RURAL CONNECTIVITY (PAVEMENT LAYERS)

DISTRICT : Kathua BLOCK :-Billawar

Name of New Details of Thickness & Cost for Pavement Layers (Rs. In Lacs)

Miscellanious (Maintenance
Cost, Preparation of DPR,
Habitations/ construction

Total cost for Pavement


Surfacing

Existing Surface Type

Primer & Tack Coat


K.C DR-AIN/CUT-STONES
Connected (N)/Associated

Retaining wall & Breast


Road Length(Km)

SubGrade Preparation
Dressing

Facility Accessed
Benifited Through Route

Road Furniture
Name of Block

Clearing Grubbing

EDGING/Earthen

Survey etc)
Pitched Drain,
(A)/Upgradatio

Rs. Lacs
Earth-work
S.No.

Sub-Base
n (U)

shoulder

Coat/MSS/P.C.
Details

G S.B.

WBM

WBM

Cost of DPR
B.O.E
wall
G2

G3

Seal
From To N A U
1 2 3 4 5 6A 6B 6 7 8

(mm)
Cost (Rs.) Thick
300 100 75 75
T02 Km 2nd

Korithiyal
Billawar

1 N - - 6.925 in Lacs
94.70 - - - - 172.79 - - - - - 0.10 1.75 - 269.34

Junior Engineer Asstt. Executive Engineer Executive Engineer,


FORMAT F-2 B
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
ROADS PROPOSED IN PMGSY FOR RURAL CONNECTIVITY (CROSS DRAINAGE STRUCTURES)

DISTRICT: Kathua PACKAGE No. JK07

Name of Block Name of Habitations Populatio Road Existing C D Structure by Type Details of Proposed CD Structure by Type Total cost Total cost of Total Cost
S.No

Block Code Road Connected/Be n Length of Pavement of road


nefited (Km) Proposed from Format [(18 +
Hume Pipe Box/Arch Minor Bridge of Hume Pipe Box/Arch Minor Bridge/ CD F-6 19)]
Culvert Culvert Culvert Culvert Causeway Structures

No. Dia No. Length No. Length No. Dia No. Length No. Length
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
T02 Km 2nd to 22 1mtr 3 2 mtr 2 10 mtr
1 Billawar Korithiyal 6.925 Cost (Rs.)
40.26 17.88 15.46
4 3 mtr
31.76 124.22 269.34 393.56
1 6 mtr
18.86
40.26 68.5 15.46
.

Junior Engineer Assistant Engineer Executive Engineer


FORMAT F-4
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
DETAILS OF EXISTING ROADS

BLOCK (S): Billawar PACKAGE NO. JK07-


DISTRICT: Kathua

Name of the Road Road Road Facilities Traffic per day*** Existing Road Details
S.No.

Length Connecting to accessed Total Total Land Road Embankment WBM Layer Bituminous Layer
(In Kms) * (use Motorise LCV/Truck
A/B/C/D) ** Height Width Width Thickness Type**** Width
d /Bus/Agri Width Width (m) (m) (m ) (mm) (m)
cultural/T (m) (m)
ractor/Tra
iler
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1
* Road Connecting to NH/SH/MDR/ODR/VR
**Use A = Market, B = Education Facilities, C= Health Centre and D = combination of previous
*** where actual figure is not available, Estimated figure may be included
**** Type BM/MSS/DMC

Junior Engineer Asstt. Executive Engineer Executive Engineer,


F-4

s Layer
Thickness
(mm)

16
FORMAT F-4 A
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
Association of Route

S.No Package No. Primary Network Associated PCI Age Whether Other Non- Weather Habitation
Through proposed for conformance includes in served with
No. Habitation Route upgradation (U) sub si diary to Package Y/N population
Served (with (ATR) or Renewal [R] the ATR
popn.)

1 2 3 4 5 6 7 8 9 10 11
1 JK07-

Junior Engineer Asstt. Executive Engineer Executive Engineer,


FORMAT F-6
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR ROADS CONSTRUCTION
Road From : - T02 Km 2nd to Korithiyal Package No. JK07-
Length of the Road (Km): 6.925 District: Kathua

S.No No. L B D/H Rate Amount


Description of Item (m) (m) (m) Quantity Unit (Rs) (Rs. in Lacs)
1 2 3 4 5 6 7 8 9 10
1 E/W in Cutting Ordinary 27703.38 CUM 106 29.36
Soil
2 Soft Rock 16622.03 CUM 183 30.42
3 Hard Rock 11081.35 CUM 307 34.02
4 Earthwork in Filling 1607 CUM 56 0.90
5 3.00 mtr R/Wall 690 RMT 11019 76.03
6 2.00 mtr B/Wall 1830 RMT 5287.4 96.76
Add Cost of Logo sign
7 1.75
boards
Add Cost for
8 0.10
Preparation of DPR
Total 269.34

Junior Engineer, Asstt. Executive Engineer, Executive Engineer,


FORMAT F-7
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS

Road From:T02 Km 2nd to Korithiyal Package No. JK07-


Type of cross Drainage works:______________________ District: Kathua

Block: Billawar

S.No Description of No. L B D Quantity Unit Rate Amount


Item (m) (m) (m) (Rs) (Rs)
1 2 3 4 5 6 7 8 9 10
1 mtr HP
1 22 Nos 1.83 40.26
Culvert
2 mtr Span
2 3 Nos 5.96 17.88
RCC Culvert
3 mtr Span
3 4 Nos 7.94 31.76
RCC Culvert
6 mtr Span
4 1 No 18.86 18.86
RCC Culvert
10 mtr
5 2 Nos 7.73 15.46
Causeway
Total 32 124.22

Junior Engineer Asstt. Executive Engineer Executive Engineer,


FORMAT F-8
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
RATE ANALYSIS
Road from :-T02 Km 2nd to Korithiyal
Material Source Length (In Kms)
Sand Dinga Amb 18.50
Stone Aggregate Chadwal Crusher 34.50
Stone Local Nallah 13.50
Steel Jammu 91.50
Bituminous Jammu 91.50
Cement Jammu 91.50
Hume Pipe
Any other
Analysis of Rates:
S.No as per MORD Rate
S.No SDB for Rural Description Unit Qty Amount (Rs)
(Rs)
Roads
A. Construction Activities
1 E/W in Cutting Ordinary Soil CUM 27703.38 106 29.36
2 Soft Rock CUM 16622.03 183 30.42
3 Hard Rock CUM 11081.35 307 34.02
4 Earthwork in Filling CUM 1607 56 0.90
5 Bitumenious Layer Sqm -- --
6 3.00 mtr R/Wall RMT 690 11019 76.03
7 2.00 mtr B/Wall RMT 1830 5287.4 96.76
8 1 mtr HP Culvert Nos 22 1.83 40.26
9 2 mtr Span RCC Culvert Nos 3 5.96 17.88
10 3 mtr Span RCC Culvert Nos 4 7.94 31.76
11 6 mtr Span RCC Culvert Nos 1 18.86 18.86
12 10 mtr Causeway Nos 2 7.73 15.46
13 Add Cost of Logo sign boards 1.75

14 Add Cost for Preparation of DPR 0.10

Total 393.56
B. Maintenance
Activities (Year
wise)
I
II
III
IV
V
Total
Note: G.Total 393.56
Rate Analysis shall cover all the items such as site clearance, Earthwork , Drainage, Granular Sub Base & Surface Course, CD
1 Works, Traffic Signs, PMGSY Boars & Logo & Maintenance activities

Where local material is used at site and the specification and rate analysis are not found in BOS & SDB for Rural Roads , the
analysis & nomenclature of the item can be suitably used based on other standard such as PWD Schedule or Rate or
2 Assessment based on field observation.
3 Completed items rates including lead for carriage of materials should be shown.

Junior Engineer Asstt. Executive Engineer Executive Engineer,


PROFORMA-B
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
PACKAGE SUMMARY
Name of the Road: T02 Km 2nd to Korithiyal Package No: JK07-
District: Kathua
State: J&K
S.No Name of Name of Road Type of Proposed Cost of No. of CD Cost of CD Total estimated cost Average Cost per Km
Block Proposal length Pavement works works incl
protection
works &
Misc

From To *N/U Km Rs. Nos Rs. Rs. Rs.


Const. Maint. Const. Maint.

1 Billawar T02 Km 2nd Korithiyal N 6.925 94.70 32 298.86 393.56 56.83

Total Estimated cost of the package : Rs.393.56 Lacs


*N-New Connectivity U-Upgradation

Prepared By: Signature:


Name:
Designation:

Checked By: Signature


Name:

Technical Scrutiny Signature:


done by: Name:

Co-ordinator Signature:
STA: Name:

Das könnte Ihnen auch gefallen