Beruflich Dokumente
Kultur Dokumente
1
2. Changes in Parts
The difference between Overseas version and Korean version lies at opening area, which is
implemented by assembly sequence of inner parts as below. In overseas arrangement
connection from Parallel Passage to U Bridge is closed, in Korean arrangement opened
through holes in AP spool.
2
(2) SP Valve
In old style SP valve throttles the flow to boom 2 spool to get higher pressure and faster swing
acceleration over boom speed. In new style SP valve is deleted and boom 2 function is
disabled while trenching mode.
3
2.2 Changes in Solenoid Valve
(1) Crawler Excavator (5 Solenoid Valve)
Solenoid valve block is changed so that they are not interchangeable each other. In New style
pilot pressures from boom raise and arm crowd are fed to upstream of solenoid valve.