Standard Method of Measurement

Blockwork Rate Analysis


Block Size 600*200*200
Volume 1Cum
Praportion 1:06
Material
l*b*h
Volume 5*0.2*1=1
area 5sqm
no of joint No of course
10 5
1 5

Mortor area 0.1 sqm


Mortor area 0.25 sqm
Area without mortor 4.65 sqm
Consumption in mortor of cement & aggregate of praportion 1:6

1 6 7
cement Consumpion 1.6 0.2285714286
Sand Consuption 1.6 1.3714285714

w/c=0.5
w=.5*6.5*50
162.5 Lit
13 Rs
Manpower

1:3'

Praportion 1:6' 1:6'


1:3'
Block Size 190*90*90 190*90*90
600*200*200
Volume 1 Cum

No of Joint No of Courses L
Verical 8 5 0.01
Horizontal 1 5 5

1:6' 1
1
10mm 200mm
thickness length width Total mortor
0.01 0.2 0.2 0.02
0.01 5 0.2 0.05
8.333333

Cum 0.035 6.5306122449 Bags


Cum
material Cost
Cement
Sand
Water
4.65 0.12 Block 38.75

MANPOWER
1 8
X 5
0.625
0.625

MACHINARY

Profit

Rate

1 6 7
1 3 4
mm
mm

B H Area of Mortor Volume of Mortor


0.2 0.2 0.08 0.016
0.01 0.2 0.25 0.05
Total 0.33 0.066

6 7
3 4
Praportion 1:00

1brass 2.83cum
1brass 10000rs

1959
4592.9
13
60 2325

0.625
1200 750
800 500

101.399

1024.13

11265.43