Sie sind auf Seite 1von 11

PROPOSED ICOMC & BMC Building Complex

STRUCTURAL R0 O

DBR

DESIGN BRIEF REPORT-STRUCTURAL

Project Name: ICOMC & BMC Building Complex

Architect: Architects Studio,

Location: BHUBHANESWAR

FOR STRUCTURAL WORKS

(DATED. 14/09/2017 REV: R0)

Page 1
PROPOSED ICOMC & BMC Building Complex

STRUCTURAL R0 O

DBR

INDEX

SN Contents Remarks

1 PROJECT BRIEF

2 CODES, STANDARDS AND REGULATIONS

3 STRUCTURAL SYSTEM

4 LOADS

5 STRUCTURAL MATERIALS

6 ANALYSIS

7 LOAD COMBINATIONS

8 DESIGN OF ELEMENTS

9 WATER PROOFING

10 MISCELLANEOUS

Page 2
PROPOSED ICOMC & BMC Building Complex

STRUCTURAL R0 O

DBR

1.0 PROJECT BRIEF

The BSM/Govt OFFICE building coming up at Bhuvaneshwar consisting


Basement , Ground Floor+9 upper floors + Terrace (12 structural slabs) .

FACILITIES:

Basement ,Ground floor to 9th floor : Office space, Room location, Toilet,
Electrical room, Store room

Terrace floor : HVAC Chillers platform , OHT and Solar


system

External : UG Sump, STP, Other services.

Common : Staircase & Lobby (Basement to Terrace


Floor)
:

The structure for proposed office facility is designed as per the above
configuration

Page 3
PROPOSED ICOMC & BMC Building Complex

STRUCTURAL R0 O

DBR

2.0 CODES, STANDARDS AND REGULATIONS


A. The design of the above structure is in accordance with the following latest
design codes:

1 IS : 875 Part 1 – Unit weight of materials

2 IS : 875 Part 2 – Live loads

3 IS : 875 Part 3 – Wind Loads

4 IS : 1893 – Seismic loads

5 IS 13920: 1993 - Ductile detailing of RCC Structures Subjected to Seismic


forces – Code of Practice ( amended version 2017)

6 IS: 456 – Code of practice for plain and reinforced concrete.

7 IS : 800 – Code of practice for Steel Design

8 IS : 1080 - Code of practice for Design and construction of shallow


foundations

9 IS: 1904 - Code of practice for structural safety of building foundations.

10 SP: 16 - Design aid for reinforced concrete to IS 456.

11 SP :23 – Hand book on concrete mixes

12 IS : 226 – Structural steel (standard Quality)

13 IS : 2062 – Structural steel (fusion welding quality)

Page 4
PROPOSED ICOMC & BMC Building Complex

STRUCTURAL R0 O

DBR

3.0 STRUCTURAL SYSTEM

The Office space has primarily Flat slab system with drop beams &
columns suitably placed as per the design intent. The shear walls are
provided at lift /wherever required will increase the stability. The foundation
system is as per the soil consultants report & recommendations.

Note: The above structural configuration gives overall view of the structural
system for the building. However, for detailed column sizes, slab thickness, and
other structural details to be detailed further.

4.0 LOADS

Following live loads are considered while designing the structural elements
apart from the dead loads as per codal norms.

Dead Loads

1 Floor finish : 160kg/sqm. (75mm thick)


2 False ceiling + Ducting : 50 kg/sqm.
3 Partition : 100 kg/sqm (As per IS: 875 part-1)
4 Self weight of RCC : 2500kg/cum (As per IS: 875 part-1)
5 Masonry and plastering : 2000 kg/cum (As per IS: 875 part-1)
6 Filling for sunken portion : 1800 kg/cum(Wherever filling is
required)
7 Waterproofing : 15 kg/sqm (membrane)
2000 kg /cum (Brick Bat Coba)
8 External finishes : 175 kg / Rmt
9 Façade cleaning
system : 1000 Kg Point load (Architectural Details shall be furni

Page 5
PROPOSED ICOMC & BMC Building Complex

STRUCTURAL R0 O

DBR

10 Soil - Dry : 1800 kg/Cum (As per IS: 875 part-1)


11 Soil - Moist : 2000 kg/Cum (As per IS: 875 part-1)
12 Façade wall load as per Façade and Arch layouts: 200 kg/sqm (Maximum
200 mm thick Façade has been considered).

Live loads:

Floor Loading as per IS-875 part II Live Load in Kg/sqm.

1 Office 400
2 Toilets 200
3 Corridor, 400
4 Electrical room 750 or Actual
5 Condenser As per actual
5 Store room , 500/As per actual
6 Server Room 1000
8 Terrace floor 400( considering
9 Lift machine room As per actual
10 Others 300
11 Lift lobby / Stair case lobby 400
12 Stairs 400
13 Waiting 400

Gardening / Landscape Loads


Terrace floor - As per the Architects/Landscape Consultants.

Note: Landscape consultants shall be aware of the filling provisions


considered for structural design as per above table.

Equipment loads:

Pls. refer architectural drawing.

Page 6
PROPOSED ICOMC & BMC Building Complex

STRUCTURAL R0 O

DBR

Wind load:

Basic wind speed: 50m/sec. , However we will consider the


wind speed of 203 KMPH as per the last cyclone hit data in Bhuvaneshwar .

K1 – as per IS: 875, 1987, Part 3.


K2 – as per IS: 875, 1987, Part 3.
K3 – as per IS: 875, 1987, Part 3.

Seismic Load:
Considered As per Code

Zone : III
Zone factor : 0.16
Importance factor : 1.0
Response reduction Factor : 5.0

Footings:

The building is designed with independent isolated/combined footings.

Columns , Drop panels , slabs sizes :

 Basement to 3rd floor 900x900 size with M45 Grade concrete for columns
&drop panels /capital slab and slabs with M30 grade
 4th floor to 6th floor 750x750mm size with M40 Grade concrete for columns
&drop panels /capital slab and slabs with M30 grade

 5th floor to 9th floor 600x600mm size with M30 Grade concrete for columns
&drop panels /capital slab and slabs with M30 grade

 Terrace slab: all structural elements with M30 garde concrete with Integral
waterproofing system

 Core walls – considered with M30 Grade concrete - 300mm thick

Page 7
PROPOSED ICOMC & BMC Building Complex

STRUCTURAL R0 O

DBR

Terrace slab

OHT as per the requirement is considered. Cooling Towers or RO system


and pumps load are considered as per the service drawing received at the
time of design stage.

Landscape Loads if any

Landscape load is considered actual as per the final pre-defined architectural


locations.

5.0 STRUCTURAL MATERIAL


Concrete

All structural concrete shall have cube crushing strength varying from M25 to M45
N/sq.mm. At 28 days as detailed below considering standard deviation.
25 + 4 = 29 N/mm2 for M25 grade concrete
30 + 4 = 34 N/mm2 for M30 grade concrete
35 + 4 = 39 N/mm2 for M35 grade concrete
40 + 4 = 44 N/mm2 for M40 grade concrete
45 + 4 = 49 N/mm2 for M45 grade concrete

Plain cement concrete shall have cube crushing strength of 10N.sq.mm. (M10)
at 28 days. Fly ash blended cement is used in view of green building concept for
Non-structural and Structural elements. No mixing should be allowed at site or at
batching plant due to apprehensions about maintaining the quality during the mixing
process.

Page 8
PROPOSED ICOMC & BMC Building Complex

STRUCTURAL R0 O

DBR

Reinforcement steel

All reinforcement shall confirm to IS 1786 – 1985 having minimum yield


strength of 500 N/sq.mm.

Structural steel
All structural steel shall confirm to IS: 226-1975 with minimum yield strength
requirements of 250 N/sq.mm.

6.0 ANALYSIS

The structural analysis will be carried out by finite element method using the
commercially available software ETABS for the load combinations as per
standards. The designs of the RCC elements are made using the limit state
method with appropriate load factors as per IS: 456-2002.

7.0 LOAD COMBINATIONS

As per IS 456:2000 the following load combinations are used for design of RCC
elements

Sl No Loads Details
1 Dead Load + Live load 1.5 ( DL + LL )
2 Dead Load + Live load + Earth quake/ Wind 1.2 ( DL + LL +/- EL/WL )
3 Dead Load + Earth quake/ Wind load 1.5 DL + /- 1.5 EL/WL
4 Dead Load + Earth quake/ Wind load 0.9 DL + / - 1.5 EL/WL

For sizing of foundations, the critical combination with un-factored loads is used as
tabulated below. As per IS: 1893 (Part I) 2002, the increase in the permissible bearing
capacities will be considered when earthquake combination governs the designs.
The designs are done for all the load combinations
listed above

Page 9
PROPOSED ICOMC & BMC Building Complex

STRUCTURAL R0 O

DBR

Sl no Details Details
a) Dead Load DL
b) Dead Load + Live Load DL + LL
c) Dead Load + Wind Load/ Earthquake Load DL +/- WL/EL
d) Dead Load + Live Load + Wind Load/ Earthquake DL + 0.8 LL +/- 0.8
Load WL/EL

8.0 DESIGN OF ELEMENTS


Designs of structural steel members are made using elastic method as per IS:
800 with relevant allowable stresses.
9.0 WATER PROOFING

The waterproofing for basement, retaining wall, Ramp, over head tanks
Sumps, Lift Pits, Gutters, drains, catch basins & Trenches are by using as per
Technical Specifications in tender document.

The waterproofing for Toilets & terrace is as per technical specification in


tender documents.

10.0 MISCELLANEOUS

The Safe Bearing Capacity (SBC) of the soil considered as per the soil test reports
provided to us .

11. Expansion Joint :

25mm wide expansion joint is provided in the Basement foot print area because of
the larger dimensions on X & Y –
axis . Direction of the expansion joint is

Page 10
PROPOSED ICOMC & BMC Building Complex

STRUCTURAL R0 O

DBR

arrived based on the upper levels footprint .

Page 11