Sie sind auf Seite 1von 1

Rigging & Crane Practices – Part 3.

0 Cargo Handling Tables – Safe Working Loads of:


Table of Contents - Supply Base Checks – Receipt & ______ 13.0 - Wire Rope Slings_________________Table 1
Part 1.0 General
Inspection of Cargo_________________ - Alloy Chain Slings (onshore use)____Table 2
- Introduction_______________________ 01.0
- Cargo Transport Units (CTUs) & Slings_ 14.0 - Alloy Chain Slings (offshore use)____Table 3
- Scope of Application & Purpose_______ 02.0
- Loading & Securing Contents_________ 15.0 - BOP Transport System____________Table 4
- Legislation________________________ 03.0
- Slinging Guidelines_________________ 16.0
- Accident/Incident Reporting___________ 04.0
- Loads Requiring Special Action________ 17.0
- Positioning of Loads on Vessels_______ 18.0 Appendix
- Sea Fastening_____________________ 19.0 - Standard Crane Hand Signals_______Appx 1
Part 2.0 Crane Operations
- Adverse Weather Conditions__________ 20.0 - Service Improvement Request (SIR)__Appx 2
- Crane Types, Basic Function & _______ 05.0
- Communications___________________ 21.0 - Summary of Legal Responsibilities___Appx 3
Safety Features
- Back Loading Cargo________________ 22.0 - Packer’s Pocket Card_____________Appx 4
- Duties of a Crane Operator___________ 06.0
- Forklift Operations__________________ 23.0 - Driver’s Pocket Card______________Appx 5
- Duties of a Slinger/Signaller __________ 07.0
- Security & Safety of Loads___________ 24.0
During Lifts
for Road Transport
- General Safety____________________ 08.0
- Planning The Lifting Operation________ 09.0
- Stability of Load____________________ 10.0
- Specialised Lifting Operations_________ 11.0
- Restrictions to Crane Operations______ 12.0

The Oil Rig Online International Drilling Systems Academy


Training Specialists Rigging & Crane Practices – Table of Contents Page 1

Das könnte Ihnen auch gefallen