Name of work: Constructing a high level bridge a/c SUKHI RIVER

on Santrampur-Doli-Morva-Santroad at Km. 49.0 to


49.20.
Taluka: Santrampur. District: Panchmahal.

SALIENT FEATURES
1.0 Location of bridge : In km. 49.0 to 49.20. on
Santrampur-Doli-Morva-
Santroad near Santrampur
town.
2.0 Type of proposed bridge:
i) Square / Skew Square.
ii) Length and Type of bridge 72.80 mt.(7 x 10.4 mt.) ; High
Level Bridge.
iii) Type of Super structure R.C.C. solid slab, o/o 12.0mt.
width
iv) Type of Sub structure R.C.C. Circular Column Portal
frame Pier, R.C.C. Wall type
Abutment & R.C.C.Cantilever
Returns.
v) Type of Foundation BoredC.I.S.Piles
1200mm.dia.under piers &
abutments.Open foundation
under returns.
3.0 Existing bridge on U/s or D/s
i) Distance @ 2.0 km. U/S under
construction high level
bridge.
ii) Waterway 73.80mt. bridge length
having 3 spans of 24.60mt.
iii) Type of Foundation Open foundation.
iv) Catchment Area 43.24 Sq.Km.
v) Design Discharge 1237.66 cumecs.
4.0 Any Irrigation Scheme contemplated
/ under construction or existing on
the river on U/s or D/s
4.1 If the scheme is on U/s. ---------N.A.-------------
i) Distance from bridge
ii) C.A. at Dam site
iii) Design discharge of spill-way /
waste weir
iv) Maximum routed discharge
4.2 If the scheme is on D/s. ---------N.A.-------------
i) Distance from bridge
ii) Whether the bridge site is --
under submergence
iii) F.R.L. of the Dam.
iv) Maximum H.F.L. including --
F.R.L. at bridge site
5.0 Hydraulics & other features of proposed bridge :
i) Catchment Area 43.24 sq. k.m.
ii) Inglis' discharge (c=7000) 741 cumecs.
iii) Max observed discharge 1111 cumecs.
iv) Manning's discharge with 1111 cumecs.
N= 0.045 & Bed gradient =
1 in 550
v) Max. Observed / Reported 129.40 mt.
H.F.L.
vi) Considered H.F.L. for max. 129.40 mt.
Design Discharge
vii) Afflux : 0.26 mt.
viii) A.H.F.L. 129.66 mt.
ix) Vertical clearance: 0.6 mt.
x) Max obstructed velocity 3.58 m/sec.
xi) Obstruction (Percentage) 24.21 %
xii) Depth of Superstructure 0.975 mt
xiii) Road level R.L.131.25 mt.
6.0 Design parameters adopted in the bridge
i) Discharge 1444 cumecs.(1111x1.30)
ii) H.F.L. 129.40 mt.
iii) Silt factor 2.0
7.0 Foundations :
i) Average Bed level in 123.97 mt.
Channel:
ii) Depth of normal scour 'dsm' 8.34 mt.
iii) Max. scour level @ pier R.L.112.72 mt.
(2.00 dsm = 16.8 mt) :
iv) Max.scour level @ abutment. R1.118.81 mt.
(1.27 dsm = 10.67 mt) :
v) Design foundation level for ----------
piers & abutments based on
scour consideration with
minimum 33% grip.

vi) Availability of hard strata: Hard inerrodible strata,


Blackish Basalt Rock
available at 7.50mt. depth
from river bed level.
vii) Foundation level adopted in For Piers Pile found.
the bridge: R.L.114.00 mt.
For Abutment/Left Pile
found. R.L. 116.00 mt. &
Abutment/Right Pile
found.R.L.114.00 mt.

8.0 Approaches :
i) High level / submersible High Level
ii) Length of approaches
(a) Left Bank :
(b) Right Bank:
iii) In case of submersible
approaches
a) Formation level of
approaches:
b) Length of submergence
______Left bank____
_____Right Bank____
c) Depth of submergence
i) Maximum: ----
ii) Minimum: ----
iii) Average: ----
d) Average height of spilling ----
Bank :
iv) In case of high level
approaches:
a) Max. height of bank:
b) Average height of bank:

9.0 Cost of Bridge proper : Rs. 3,31,66,000 /-


10.0 Cost per Rmt. of Bridge: Rs. 4,55,580 / Rmt.
11.0 Any special OR noteable features: