CLIENT : Gulf Indonesia Resources Ltd.

JOB NO : 91078
PROJECT : Suban Gas Residue Compression
SUBJECT : Centrifugal Pump Technical Analysis
ITEM NUMBER : 258-P-101 A/B
SERVICE : Produced Water Charge Pumps
TECHNICAL BID TABULATION CHECKED BY :
APPROVED BY :
DATE :

VENDOR
DESCRIPTION SPECIFICATION

1 Manufacturer
2 Model
3 Type (Horiz., Vert., Inline, Sump)
4
5 OPERATING CONDITIONS
6 Capacity, Normal / Rated (gpm)
7 Suct. Press. Max / Rtd (psiG)
8 Disch. Press. (psiG)
9 Diff. Press. (psi)
10 Diff. Head (ft)
11 NPSH Available (ft)
12 Hydraulic Power (hp)
13 Service Continuous/Intermittent
14
15 LIQUID
16 Type or Name of Liquid
17 Pumping Temp. (Min/Normal/Max) (0F)
18 Specific Gravity
19 Viscosity at PT (cp)
20
21 PUMP PERFORMANCE :
22 Speed (rpm)
23 NPSHR (water) (ft)
24 Efficiency (%)
25 BHP Rated (hp)
26 Max. BHP of Rated Impeller (hp)
27 Min. Cont. Flow (gpm)
28 Cap. at BEP of Rated Imp. (gpm)
29 Shutoff Head of Rated Impeller (ft)
30 Suction Specific Speed
31
32 CONSTRUCTION
33 Main Connection
34 - Flange Suction Size/Rating/Facing/Location (in/lb/RF/FF)
35 - Flange Discharge Size/Rating/Facing/Location (in/lb/RF/FF)
36 Aux. Connection
37 - Drain No./Size/Rating/Location (in/lb/RF/FF)
38 - Vent No./Size/Rating/Location (in/lb/RF/FF)

I:/Mech/Rotating/Finaldes/439919783.xls/pump/10/01/2019/08:07:28/hr Page 1 of 8
CLIENT : Gulf Indonesia Resources Ltd.
JOB NO : 91078
PROJECT : Suban Gas Residue Compression
SUBJECT : Centrifugal Pump Technical Analysis
ITEM NUMBER : 258-P-101 A/B
SERVICE : Produced Water Charge Pumps
TECHNICAL BID TABULATION CHECKED BY :
APPROVED BY :
DATE :

VENDOR
DESCRIPTION SPECIFICATION

39
40 Casing Mount (Centerline, Foot, etc)
41 Casing Split (Axial, Radial)
42 Casing Type (Single/Double Volute, Diffuser, Barrel)
43 Casing, MAWP / Hydrotest (psig)
44
45 Impeller Dia., Min / Rated / Max (in)
46 Impeller Type (Closed, Open)
47 Impeller Suction (Single, Double)
48 Impeller Shaft Mount (Btwn Brg, Overhung)
49
50 Bearing Type Radial / Thrust
51 Lubrication (Ring Oil, Flood, Oil Mist, Flinger, Press.)
52
53 Coupling Mfr/Model
54 Coupling Rating (kW/100 rpm)
55 Coupling Lubrication
56 Coupling Spacer Length (in)
57
58 Mech. Seal Mfr/Model
59 Mech. Seal API Class, Code
60 Seal Flush Piping (Tubing, Piping, CS, SS)
61 - Seal Flush Piping Plan
62 - Piping Assembly (Threaded, Seal Welded, Socket Welded,
63 Flanged, Unions)
64 Packing Data
65 - Mfr / Type
66 - Size / No of Rings
67
68 MATERIAL
69 Pump Material, API H-1 Class
70 Case / Barrel
71 Impeller
72 Case / Impeller Wear Ring
73 Shaft / Sleeve
74 Baseplate
75 COOLING WATER PIPING
76 C.W. Pipe (CS, SS)

I:/Mech/Rotating/Finaldes/439919783.xls/pump/10/01/2019/08:07:28/hr Page 2 of 8
CLIENT : Gulf Indonesia Resources Ltd.
JOB NO : 91078
PROJECT : Suban Gas Residue Compression
SUBJECT : Centrifugal Pump Technical Analysis
ITEM NUMBER : 258-P-101 A/B
SERVICE : Produced Water Charge Pumps
TECHNICAL BID TABULATION CHECKED BY :
APPROVED BY :
DATE :

VENDOR
DESCRIPTION SPECIFICATION

77 C.W. Flow Rate


78 Sight Flow Indicators
79
80 INSTRUMENTATION
81 - Vibration
82 Noncontacting (API 670)
83 Provision for Mounting Only
84 Accelerometer
85 - Temperature and Pressure
86 Radial Brg Metal Temp
87 Thrust Brg Metal Temp
88 Provision for Instrument Only
89 Temperature Gauges
90 Thermowells
91 Pressure Gauge Type
92 Pressure Switch Type
93
94 MOTOR
95 Manufacturer / Mounted (Horiz./Vert)
96 Nameplate Rating / Frame / RPM (hp/RPM)
97 Volt / Phase / Hz (V/P/Hz)
98 Area Classification
99 Enclosure Type / S.F.
100 Insulation Class / Temperature Rise Class
101 Bearing / Lube
102 Space Heater (kW)
103 Space Heater 230 V / 3 Ph / 60 Hz operating @ 230 V / 3 Ph / 60 Hz
104
105 INSPECTION TEST
106 Performance
107 NPSH
108 Hydrotest
109 Complete Unit Test
110 Dismantle After Test
111 Sound Level Test
112 SPARE PARTS
113 Construction and Commissioning
114 2 Years Operating

I:/Mech/Rotating/Finaldes/439919783.xls/pump/10/01/2019/08:07:28/hr Page 3 of 8
CLIENT : Gulf Indonesia Resources Ltd.
JOB NO : 91078
PROJECT : Suban Gas Residue Compression
SUBJECT : Centrifugal Pump Technical Analysis
ITEM NUMBER : 258-P-101 A/B
SERVICE : Produced Water Charge Pumps
TECHNICAL BID TABULATION CHECKED BY :
APPROVED BY :
DATE :

VENDOR
DESCRIPTION SPECIFICATION

115
116 WEIGHT & DIMENSION
117 Pump Weight (lb)
118 Motor Weight (lb)
119 Motor Weight (lb)
120 Total Weight (lb)
121 Length (L) x Width (W) x Height (H) (in)
122
123 Remark :
124
125
126
127
128
129
130
131
132
133

I:/Mech/Rotating/Finaldes/439919783.xls/pump/10/01/2019/08:07:28/hr Page 4 of 8
CLIENT : Gulf Indonesia Resources Ltd.
JOB NO : 91078
PROJECT : Suban Gas Residue Compression
SUBJECT : Recip. Pump Technical Analysis
ITEM NUMBER : 258-P-102 A/B
SERVICE : Produced Water Injection Pumps
TECHNICAL BID CHECKED BY
APPROVED BY
:
:
TABULATION DATE :

VENDOR
DESCRIPTION SPECIFICATION
ASCROFINDO DAICHI BCU GUNA PERTIWI

1 Manufacturer Ingersoll Dresser Sakura Seisakusho Dawson Downie Wheatley Gaso


2 Model 2.75 4HS3 3R - 809 SP.903 VILF T - 365M
3 Type (Horiz., Vert., Inline, Sump) Horizontal Horizontal Horizontal Hor. triplex ramp Horizontal
4
5 OPERATING CONDITIONS
6 Capacity, Normal / Rated (gpm) 70 YES YES YES YES
7 Suct. Press. Max / Rtd (psiG) 25.4 YES YES YES YES
8 Disch. Press. (psiG) 950 YES YES YES YES
9 Diff. Press. (psi) 924.5 YES YES YES YES
10 Diff. Head (ft)
11 NPSH Available (ft) 89.6 YES YES YES YES
12 Hydraulic Power (hp)
13 Service Continuous/Intermittent
14
15 LIQUID
16 Type or Name of Liquid Produced Water YES YES YES YES
17 Pumping Temp. (Min/Normal/Max) (0F) 120 YES YES YES YES
18 Specific Gravity 0.99 YES YES YES YES
19 Viscosity at PT (cp) 0.555 YES YES YES YES
20
21 PUMP PERFORMANCE :
22 Speed (rpm) 302.4 235 287 347
23 NPSHR (water) (ft) TBA 10 m 20 TBA
24 Efficiency (%) 97 90 85 TBA
25 BHP Rated (hp) 55 TBA 46.23 43.65

I:/Mech/Rotating/Finaldes/439919783.xls/Form/10/01/2019/08:07:28/hr Page 5 of 8
CLIENT : Gulf Indonesia Resources Ltd.
JOB NO : 91078
PROJECT : Suban Gas Residue Compression
SUBJECT : Recip. Pump Technical Analysis
ITEM NUMBER : 258-P-102 A/B
SERVICE : Produced Water Injection Pumps
TECHNICAL BID CHECKED BY
APPROVED BY
:
:
TABULATION DATE :

VENDOR
DESCRIPTION SPECIFICATION
ASCROFINDO DAICHI BCU GUNA PERTIWI

31
32 CONSTRUCTION
33 Main Connection
34 - Flange Suction Size/Rating/Facing/Location (in/lb/RF/FF) - / 600# / RF / - 6"/125/RF/SIDE 3"/600/RF/SIDE 2.5"/160/RF/SIDE - / 300 / RF / -
35 - Flange Discharge Size/Rating/Facing/Location (in/lb/RF/FF) - / 600# / RF / - 3"/600/RF/SIDE 2"/600/RF/SIDE 1.5"/160/RF/SIDE - / 600 / RF / -
36 Aux. Connection
37 - Drain No./Size/Rating/Location (in/lb/RF/FF) N/A N/A N/A N/A
38 - Vent No./Size/Rating/Location (in/lb/RF/FF) N/A N/A N/A N/A
39
40 Liquid End (Simplex, Duplex, Multiplex Cyl.) TBA 3 Cylinder 3 Cylinder 3 Cylinder
41 Liners (Removable, Replaceable) TBA TBA None TBA
42 Valves (Disc, Wing, Double Ported) TBA Wing Disc Disc
43 Casing, MAWP / Hydrotest (psig) TBA TBA TBA TBA
44
50 Bearing Type Radial / Thrust
51 Lubrication (Ring Oil, Flood, Oil Mist, Flinger, Press.) splash oil lubricated TBA Splash oil lubricated Splash oil lubricated
52
53 Coupling Mfr/Model TBA TBA TBA Belt drive
54 Coupling Rating (kW/100 rpm)
55 Coupling Lubrication
56 Coupling Spacer Length (in)
57
68 MATERIAL
69 Pump Material, API 674, S1
70 Cylinder Cast Iron ASTM A48 - CL.30 S25C ASTM A743 CF8M 9D Nickel Al. Bronze

I:/Mech/Rotating/Finaldes/439919783.xls/Form/10/01/2019/08:07:28/hr Page 6 of 8
CLIENT : Gulf Indonesia Resources Ltd.
JOB NO : 91078
PROJECT : Suban Gas Residue Compression
SUBJECT : Recip. Pump Technical Analysis
ITEM NUMBER : 258-P-102 A/B
SERVICE : Produced Water Injection Pumps
TECHNICAL BID CHECKED BY
APPROVED BY
:
:
TABULATION DATE :

VENDOR
DESCRIPTION SPECIFICATION
ASCROFINDO DAICHI BCU GUNA PERTIWI

71 Liner 316 SS TBA N/A N/A TBA


72 Piston or Plunger Ductile iron SUS 420 J2 Alumunium Ceramic
73 Piston rings / gland packing AISI 4140 / - TBA V 7137 TBA TBA
74 Piston rod Ductile iron N/A Alumunium TBA
75 Valve service 316 SS SUS 420 J2 316 SS Celcon / SS
94
95 MOTOR
96 Manufacturer / Mounted (Horiz./Vert) Horizontal Reliance / Siemens TBA QE or equal Maraton or Siemen
97 Nameplate Rating / Frame / RPM (hp/RPM) 75 / 1500 55 kW / 1700 rpm 45 kW / 1460 rpm 50 / 1500
98 Volt / Phase / Hz (V/P/Hz) 400 / 3 / 50 400 / 3 / 50 TBA 400 / 3 / 50 400 / 3 / 50
99 Area Classification Cl. 1 / Gr. D / Div. 2 YES YES YES YES
100 Enclosure Type / S.F. TEFC / 1.0 TEFC TEFC TEFC TEFC
101 Insulation Class / Temperature Rise Class Cl.F / Cl. B YES TBA YES YES
102 Bearing / Lube TBA TBA TBA TBA
103 Space Heater (kW) Required > 10 HP TBA TBA TBA TBA
104 Space Heater 230 V / 3 Ph / 60 Hz operating @ 230 V / 3 Ph / 60 Hz Required > 10 HP TBA TBA TBA 120 / 1 / 50
105
106 INSPECTION TEST
107 Performance Required - Wit. YES YES YES YES
108 NPSH Not Required
109 Hydrotest Required - Non Wit. YES YES YES YES
110 Complete Unit Test Not Required
111 Dismantle After Test Not Required
112 Sound Level Test Not Required
113

I:/Mech/Rotating/Finaldes/439919783.xls/Form/10/01/2019/08:07:28/hr Page 7 of 8
CLIENT : Gulf Indonesia Resources Ltd.
JOB NO : 91078
PROJECT : Suban Gas Residue Compression
SUBJECT : Recip. Pump Technical Analysis
ITEM NUMBER : 258-P-102 A/B
SERVICE : Produced Water Injection Pumps
TECHNICAL BID CHECKED BY
APPROVED BY
:
:
TABULATION DATE :

VENDOR
DESCRIPTION SPECIFICATION
ASCROFINDO DAICHI BCU GUNA PERTIWI

114 SPARE PARTS


115 Construction and Commissioning Included
116 2 Years Operating Not Required
117
118 WEIGHT & DIMENSION
119 Pump Weight (lb) TBA TBA TBA TBA
120 Motor Weight (lb) TBA TBA TBA TBA
121 Motor Weight (lb) TBA TBA TBA TBA
122 Total Weight (lb) TBA TBA 1680 kg TBA
123 Length (L) x Width (W) x Height (H) (in) TBA TBA (2.3 x 1.2 x 1.2) m TBA
124
125 Remark :
126
127
128
129
130
131
132
133
134
135
136

I:/Mech/Rotating/Finaldes/439919783.xls/Form/10/01/2019/08:07:28/hr Page 8 of 8