Sie sind auf Seite 1von 1

HDM-4

Analysis Mode: Analysis-by-Project


HIGHWAY DEVELOPMENT & MANAGEMENT
Economic Analysis Summary
Study Name: Vijayapura to Yatnal Road
Run Date: 03-05-2018

Alternative: Reconstruction vs Alternative: Base Alternative

Savings in Savings in Net


Increase in Road Agency Costs Reduction Net
Savings in MT Travel NMT Travel Economic
in Accident Exogenous
MT VOC Time Costs & Operating Benefits
Capital Recurrent Special Costs Benefits
Costs (NPV)

Undiscounted 1,374.48 -173.69 0.00 2,705.78 2,092.28 6.33 0.00 0.00 3,603.60
Discounted 1,227.21 -67.93 0.00 1,203.09 913.00 2.88 0.00 0.00 959.68

Economic Internal Rate of Return (EIRR) = 25.1% (No. of solutions = 1)

HDM-4 Version 1.3