DESCRIPTION SCOPE REMARKS
NO
1 SHUT DOWN OF EXISTING UNIT SADAF SEQUENTIAL ACTIVITY
2 AREA BARRICADING AL MANAR PARALLEL ACTIVITY
3 SYSTEM NORMALIZATION SADAF SEQUENTIAL ACTIVITY
17 PREPARE FOR LIFTING LUGS, LIFTING PLAN FOR HEAVY AL MANAR PARALLEL ACTIVITY
LIFT
18 CRANE POSITIONING AS PER THE REQUIREMENTS AL MANAR PARALLEL ACTIVITY
SAFE LIFTING OF TRAVEL SCREEN WITH
19 AL MANAR SEQUENTIAL ACTIVITY
MOTOR,PEDESTIAL AND ASSOSIATE PARTS
SAFE LOADING ON VEICHLE FOR SHIFTING AT
20 AL MANAR SEQUENTIAL ACTIVITY
STORE/DESIGNATED ARE.
ERECTION ACTIVITIS DURATION
day10
day11
day12
day13
day14
day15
day16
day17
day18
day19
day20
SL
day1
day2
day3
day4
day5
day6
day7
day8
day9
DESCRIPTION SCOPE REMARKS
NO
day10
day11
day12
day13
day14
day15
day16
day17
day18
day19
day20
SL
day1
day2
day3
day4
day5
day6
day7
day8
day9
DESCRIPTION SCOPE REMARKS
NO