MAINTENANCE ACTIVITY SCHEDULE LAST DONE 12 1 2 3 4 5 6 7 8 9 10 11 12
1 TUBE LOADER AIR CLEANING DAILY
2 TOP ROLLS CHECKING DAILY
3 TOP APRON CHECKING DAILY
4 BOTTOM APRON CHECKING DAILY
5 THREAD GIUDES CHECKING DAILY
6 SPACERS CHECKING DAILY
7 SPINDLE TAPE CHECKING DAILY
8 SPINDLE BRAKES CHECKING DAILY
9 TRAVELLER CHECKING DAILY
10 CLEARER ROLL CLEANING DAILY
11 DRAFTING ZONE CLEANING DAILY
12 COMPACT APRON CHECKING DAILY
13 ELECTRICAL PANEL / INVERTER CLEANING 3 DAYS
14 ZUW CLUTCH CLEANING (DEPENDS ON COUNT) 5-10 DAYS
Page 1 of 5
LRJ9 RINGFRAME MAINTENANCE SCHEDULE RF NO.
2017 2018
MAINTENANCE ACTIVITY SCHEDULE LAST DONE 12 1 2 3 4 5 6 7 8 9 10 11 12
18 PEG TRAY PISTON GREASING(KLUBER 10 DAYS
CENTOPLEX GLP202BH/ SERVO GEM 2)
Page 2 of 5
LRJ9 RINGFRAME MAINTENANCE SCHEDULE RF NO.
2017 2018
MAINTENANCE ACTIVITY SCHEDULE LAST DONE 12 1 2 3 4 5 6 7 8 9 10 11 12
28 AIR LUBRICATOR 15 DAYS
Page 3 of 5
LRJ9 RINGFRAME MAINTENANCE SCHEDULE RF NO.
2017 2018
MAINTENANCE ACTIVITY SCHEDULE LAST DONE 12 1 2 3 4 5 6 7 8 9 10 11 12
49 TRAVELLER CLEARER SETTING 6 MONTH
50 BOTTOM APRON WAHING-FINE DETERGENT 6 MONTH
51 SUCTION TUBE WASHING 6 MONTH
52 ALL SEPARATOR CLEANING 6 MONTH
53 JOCKEY PULLEY GREASING 6 MONTH
54 SPINDHANGLE OIL CHANGE 6 MONTH
55 FRONT BOTTOM FLUTTED ROLLER RUN OUT 1 YEAR
CHECK+ FLUTES CLEANING(COPPER BRUSH)&
NEEDLE BEARING CLEANING
56 MIDDLE BOTTOM FLUTTED ROLLER RUN OUT 1 YEAR
CHECK+ FLUTES CLEANING(COPPER BRUSH)&
NEEDLE BEARING CLEANING
57 BACK BOTTOM FLUTTED ROLLER RUN OUT 1 YEAR
CHECK+ FLUTES CLEANING(COPPER BRUSH)&
NEEDLE BEARING CLEANING
58 GEAR PLAY CHECKING ( HEADSTOCK & DUOFLEX 1 YEAR
AND NECESSARY GEARS)
59 GEAR END & DUOFLEX SERVICING 1 YEAR
60 REGULATING FILTER & OIL MISTER SERVICING 1 YEAR
61 OVER ALL MACHINE AIR LEAK CHECKING 1 YEAR
62 BOBBIN HOLDER SERVICING 1.5 YEAR
63 SPINDLE TAPE CHANGING 1.5 YEAR
64 MACHINE RELEVELLING 3 YEARS
65 DRAFTING PRESSURE HOSE CHANGING 3 YEARS
66 TOP ROLL GREASING 3 YEARS
Page 4 of 5
LRJ9 RINGFRAME MAINTENANCE SCHEDULE RF NO.
2017 2018
MAINTENANCE ACTIVITY SCHEDULE LAST DONE 12 1 2 3 4 5 6 7 8 9 10 11 12
ELECTRICAL MAINTENANCE
ENSURE ALL SAFETY SWITCHES & SENSOR POSITION
& TIGHTNESS ; CONDITION: KEEP DOFF
1 SEQUENCE AT " AUTO CHECK MODE" 15 DAYS
2 EMITTER & RECEIVER SIGNAL SETTING 15 DAYS
3 PULL CHORD EMERGENCY SETTING 15 DAYS
GRIPPER PRESSURE SWITCH SETTING
CONDITION: KEEP GRIPPER PRESSURE AS 3 BAR AND
4 SET. THEN REVERT TO 4 BAR MONTHLY
ENSURE AUTODOFFER ELECTRO VALVE POSITION &
5 NUT TIGHTNESS MONTHLY
6 CONDITIONS OF MOTOR DRIVES 3 MONTH
7 MAIN MOTOR GREASE 3 MONTH
8 FAN MOTOR GREASE 3 MONTH
LUBRICATIONS
BOTTOM FLUTED ROLLERS BEARING GREASE
ALL GREASE NIPPLES GREASING
MAIN DIVE SHAFT BEARING GREASE SERVO GEM EP2 / KLUBER CENTOPLEX GLP 202BH
JOCKEY PULLEY GREASE
GEAR END & OFF END GREASE NIPPLE GREASE
LINEAR ROLLER BEARING GREASE
BIJUR PUMP
SERVO WAY 220 OIL
HEADSTOCK ENCODER CHAIN
FOG OIL LUBRICATOR OIL ISO VG 32
SPINDLE OIL CHANGE SERVO SPIN EE10
SHELL ALBIDA EP2 / MOBIL XHP222 / ACRONEX EP2 / PETAMO GHY133N / BECHEM
MAIN & FAN MOTOR GREASE RARE MAX SUPER N
TOP ROLL GREASE SKF TG5 / STABURAGS NBU 12/300 KP
RINGS KLUBER TEX 1-46N OIL
DRAFTING MOTOR OIL-ONCE IN 6 MONTH KLUBER GEM 1-220N