Beruflich Dokumente
Kultur Dokumente
Working Remarks
9 : Normal : No work was carried out,
condition
overhauled to be repaired or
overhauled
Part Check Point Tool & Method Standards Months Condition Result
Vacuum cleaner
Cleanliness Every
/Eye check
Lock Key Every
Machine room Light switch & illumination Illuminometer Over 100 Lux Every
environment Temperature Thermometer -10 ~ +40℃ Every
Ventilation Eye check Every
Brake lever
Eye check Every
Manual handle
-15 ~ 10%
Indication voltage Tester Every
(include start drop)
Main supply Looseness, damage Spanner, screw driver Every
switch
Vibration, heat Hands, eye Every
Fuse Eye, tester Every
Transmit, reception Ear, voice Every
Inter-phone
Indication voltage Tester Over DC 12V 1,3,5,7,9,11
Wire connections Screw driver Every
TM Motor Resistance to earth Ohmmeter Over 1 ㏁ 1
Noise, vibration, heat Eye, ear, hands Every
Noise, vibration, heat Eye, ear, hands -10 ~ 70℃ Every
Rotary encoder
Wire connections, pipe Screw driver, eye Every
Looseness, alignment Spanner, eye 6
Rubber compression Ruler 15% compression 6
TR M/C
Grease on bearings Grease gun 6, 12
Oil level, replace Gauge, eye Level mark 3,6,9,12
Wear sheave grooves Ruler 4,10
TR M/C
Noise, vibration, heat Eye, ear, hands 4,10
Compression spring Ruler Every
Wear linings Ruler Every
Brake
Stroke Ruler Every
Proper operation Eye, ear Every
Looseness, rotation
Spanner, eye 5,11
alignment
Cotton waste,
Cleanliness 5,11
Governor “-“driver
Tripping No slip 5,11
Lubrication on link Oil can, cotton waste 5,11
2. Control Panel
Part Check Point Tool & Method Standards Months Condition Result
Vacuum cleaner
Installation Cleanliness Every
brush
condition
Looseness Spanner, screw driver Every
Indication power voltage Tester ± 10% Every
MCCB
Looseness Spanner, screw driver Every
Part Check Point Tool & Method Standards Months Condition Result
Control, signal voltage Tester Every
Control signal
Resistance control, signal Ohmmeter Over 0.5 ㏁ 6
Condition Eye, hands Every
PCB
Function Tester, Ohmmeter Every
Relays Condition of relays Eye 2,5,8,11
Transformer &
Looseness, noise, heat Eye 1,7
Reactor
TKXS : 24Ω
Resistance of MB.SR TKM / TKXL : 20Ω
TKL : 18.6Ω
Ohmmeter 1,7
H422B/H438B:13.6Ω
Brake TK Type : 220Ω
Resistance of MB.PR
H422B/H438B:330Ω
Voltage(when E/L Stop)
Voltmeter DC110±10%(V) 1,7
(MC1BR-01~MR1BR-09)
When E/L running DC ammeter 1,7
Regeneration
Looseness, heat Eye Every
resistance
3. Car In
Part Check Point Tool & Method Standards Months Condition Result
Eye, cleaner
Environment Cleanliness, damage Every
Cotton waste
Operation Eye, hands Every
Fan
Noise Ear 55dB in car 2,5,8,11
Handrail Looseness, cleanliness Eye Every
Alignment of door Plumb, ruler ±2mm 4,10
Opening Eye, ruler Every
Car door
Closing Eye, ruler Every
Clearance Ruler 30±2mm 3,6,9,12
Installation condition & Lock Eye Every
Functioning of button Eye, hands Every
OPB
Looseness + Screw driver Every
Functioning of switch Eye, hands Every
Functioning of emergency
Ear, hands Every
button
Interphone Condition of reception Ear Over 55dB Every
Emergency bell sound Ear Over 85dB Every
Operation of light Eye Every
Part Check Point Tool & Method Standards Months Condition Result
Condition of lights Eye Every
Eye, cleaner
Environment House keeping Every
Cotton waste
Safety guard Spanner Every
Condition of MHS Eye, ruler 4±1mm Every
Emergency Exit
Looseness Eye, hands Every
Tension of ropes Hands, eye 2,8
Main Rope Kink Hands, eye 2,8
Wear out Calipers 10% 2,8
Kinks, rust Eye 3,9
Governor Rope
Condition of clip Eye 3,9
Condition of thimble rod Eye 4,10
Condition of babbits Eye 4,10
Hitches rope Condition of springs Hammer, ear Equality 4,10
Double nuts Spanner 4,10
Cotter pins Eye 60˚ bend round 4,10
Installation condition Spanner 2,5,8,11
Function tests of
Hands 2,4,6,8,10,12
EES, SCS
5. Car
Part Check Point Tool & Method Standards Months Condition Result
Alignment of door Plumb, ruler ±2mm 3,9
6. Hoistway
Part Check Point Tool & Method Standards Months Condition Result
Condition of hoistway wall Eye 1,4,7,9,12
Environment Condition of junction boxes Screw driver, eye 1,4,7,9,12
Tighten of branch cables Eye 1,4,7,9,12
Alignment of door Plumb, ruler ±1mm 1,4,7,9,12
7. Hall
Part Check Point Tool & Method Standards Months Condition Result
Condition of installation Hands Every
Proper Operation of buttons Hands Every
Hall button
Testing the hall buttons Hands, eye Every
Cleaning the hall button box Air blower Every
Condition of installation Screw driver, hands Every
Indicator Condition of illumination Eye Every
Functioning (all floors) Eye Every
8. Pit
Part Check Point Tool & Method Standards Months Condition Result
Condition of pit Eye, vacuum cleaner 3,6,9,12
Environment Condition of pit switch Eye 3,6,9,12
Oil pan Eye 3,6,9,12
Condition of installation Eye 3,6,9,12
Spring Buffer
(60m/min) Car:300~600
Run by Eye, ruler 3,6,9,12
CWT:300~900
Condition of installation Eye 3,6,9,12
Oil Buffer
(90,105m/min) Car: 0~600
Run by Eye, ruler 3,6,9,12
CWT: 0~900
Installation condition Spanner 4,10
Governor tension
Lubrication sheave shaft Grease gun 4,10
sheave
Condition of rotation Ear 4,10