COMMISSIONING OF GCS AT MAKUM, ASSAM Document Title: ELECTRICAL DESIGN BASIS Revision No.: A1 Document No.: P4007-EL-DB-001 Revision Date: 02-03-18
- As far as practicable, one rating of components shall be used for a range of
starters (e.g. one rating of contactors in all starters up to 20 HP). All device selection shall take motor starting current into consideration. - For hazardous areas, 3 phase 3 wire connection shall be used including lighting loads (through lighting transformer). However, in case 3 phase, 4 wire supply (for neutral) is required, power from the 3 pole feeder will be supplied through isolation transformer (415 V/415 V, delta/star-neutral) only. Two nos. of such feeders shall be accommodated in each panel. Such feeders will have two isolation MCCBs, i.e., one incomer for feeding the transformer, the other on the outgoing (secondary) side of the transformer. One no. 60 kVA isolation transformer (415 V/415 V, delta/star-neutral) shall be provided. 5.3.15 For PMCC, feeders for more than 630 ampere rating shall be provided with ACB. Feeders up to 630 ampere rating shall be provided with MCCB. All lighting / auxiliary / power panel main incomers will be MCCB. All lighting sub-distribution board incomers up to 63 amperes shall be MCB and beyond 63 amperes MCCB shall be provided. Bus bar and isolating devices are rated at 125% of total design load. Bus bars are generally identified as R, Y & B with phase colour as Red, Yellow, and Blue. All the switchgears are industrial grade equipment installed in freestanding sheet metal cubicles of modular design. All the switchgears are to be installed in a closed naturally ventilated room. All equipment and switchgear ratings are decided based on actual design calculations (actual requirement) and 10% spare capacity (for future growth). Cable entry to all panels of L.T. switchgear and control panels shall be from bottom. 5.3.16 Switch board components such as breakers, MCCBs, horizontal and vertical bus bars shall be designed to withstand maximum design fault current at the point of installation, whichever is higher for a minimum period of 1 sec. 5.3.17 Motor feeders shall be as follows. a) Up to 9 kW shall be started on DOL b) Above 9 kW and up to 30 kW shall be started by star-delta starter. c) Above 30 kW shall be controlled by soft starter with bypass contactor with comprehensive motor protection relay. 5.3.18 All the switchgear (PCC/MCC/ UPS/ Control panel/) interface with DCS / PLC shall be by hard wired. Interposing relay panel shall be considered in the electrical substation room, to interface the Switchgears with DCS / PLC system , since Switchgear operating