SMCC - ITD JV DHAKA MASS RAPID TRANSIT DEVELOPMENT PROJECT

CENTRAL LABORATORY MRT LINE 6 : CONTRACT CP-06

COMPRESSIVE STRENGTH TEST OF CONCRETE CYLINDERS SPECIMEN


Test Method : ASTM C 39/C 39M , AASHTO T 22

Report No. : CP06-0487/28 Date : 26-Aug-19


RIW No. : CP06/RIW/190828/CVL/SWY/02630
Type of Structure : Kicker Test Location : TSC Batching Plant Lab
Mix Proportion : Class: G35C Mix Code: 351520C Admixture : Sika Plast 204 TH(BD)
Date of Casting : 29-Jul-19 Design Strength : 35 Mpa
Date of Test : 26-Aug-19 Cement Type : OPC
Age of Specimen : 28 Days Cement Brand : Bashundhara Cement
Age of Curing : 28 Days Aggregate Type : Crushed Stone Chips (CCM Mine)
Sample Taken : 4 Nos Component of Structure : Kicker - 483
Volume of Concrete : 5.00 m3 Machine No. : TYE-2000B, Serial No.:602
Correction Factor : y = 1.0151 x +11.874
Duration of Date for use : : 05-01-20

TEST RESULTS

Speciment
Average
Size of Cross Volumn of Mass of Concrete Maximum Corrected Load Compressive
Specimen Specimen Compressive Indiv.>85
Specimen Sectional Speciment Specimen Density Load (X) (Y) Strength
No. ID.No. Strength % Spec.
Area
2 3 3
(mm) (mm ) (m ) (kg) (kg/m ) (kN) (kN) (Mpa) (Mpa)
Dia.(mm)
150
1 0005 17671.50 0.0053 12.73 2401.23 656.40 678.19 38.38 Pass
H (mm)
300
38.02
Dia. (mm)
150
2 0006 17671.50 0.0053 12.70 2395.57 643.90 665.50 37.66 Pass
H.(mm)
300

REMARKS

Tested/Prepared by :………………………...… Verified by : ……………………...…… Withnessed by : …………………..…………

Lab. Technician Quality Control Eng./Manager QA/QC Engineer


The Contractor (SMCC-ITD JV) The Contractor (SMCC-ITD JV) The Engineer (NKDM)

Form No.SMCC-ITD JV/CP06/MS/CVL 0015/06