Name of Industry - Delta Teratek

Address - 85b Badore Aja Express Way

types of business - water treatment

areas of activity
� routine lab analysis (determination of porosis and permeability of rock samples)
� determination of lifespan of reserviours
� recommend kinds of seive to be used and furnish info such as formation
encountered

major products

Mostly serices - water treatment

october

week 1 (4th - 8th)


mon - Introduction to the computech department, staffs and job functions
tue - Introduction to the photography department, staffs and job functions
wed - Introduction to the rockshop department, staffs and job functions
thu - Introduction to the deanstack department, staffs and job functions
fri - Introduction to the routine lab department, staffs and job functions

PFW - none
SSB - All departments

week 2 (11th - 15th)


mon - Introduction to the freezing unit department, staffs and job functions
tue - lectures on water quality, physical and chemical parameters
wed - waste water quality measurement
thu - measurement of the extent to which light penetrates the water samples
fri - comparism of coloured water

PFW - none
SSB - computech department

week 3 (18th - 22nd)


mon - checking on taste and odour of the water samples
tue - did some filtering to take off suspended solids
wed - did checks on alkalinity and hardness
thu - studies on water quality requirements
fri - studies on water quality standards

PFW - none
SSB - Routine lab

week 4 (25th - 29th)


mon - did the complete water purification process
tue - did the complete water purification process
wed - did the complete water purification process
thu - Public Holiday (Barka de Sallah)
fri - Public Holiday (Barka de Sallah)

PFW - none
SSB - Routine lab

SMWES -

November

week 5 (1st - 5th)


mon - did checks on various kinds of rock samples
tue - checked for porosity on different rock samples
wed - checked for permeability on different rock samples
thu - i was introduced to different kinds of sieve's
fri - did checks on various kinds of rock samples

PFW - none
SSB - Rock Shop

week 6 (8th - 12th)


mon - understudied the settling tank during the settiling operation
tue - understudied the mixing and flocculation processes
wed - understudied the filtration process
thu - understudied the adsorption process
fri - understudied the disinfection process

PFW - none
SSB - Deanstack

week 7 (15th - 19th)


mon - checking on taste and odour of the water samples
tue - did some filtering to take off suspended solids
wed - did checks on alkalinity and hardness
thu - studies on water quality requirements
fri - studies on water quality standards

PFW - none
SSB - Routine Lab

week 8 (22nd - 26th)


mon - water purification process
tue - water purification process
wed - water purification process
thu - water purification process
fri - water purification process

PFW - none
SSB - Routine Lab

SMWES

December

week 9 (29th - 3rd)


mon - did checks on various kinds of rock samples
tue - checked for porosity on different rock samples
wed - checked for permeability on different rock samples
thu - i was introduced to different kinds of sieve's
fri - did checks on various kinds of rock samples

PFW - none
SSB - Rockshop

week 10 (6th - 10th)


mon - understudied the settling tank during the settiling operation
tue - understudied the mixing and flocculation processes
wed - understudied the filtration process
thu - understudied the adsorption process
fri - understudied the disinfection process

PFW - none
SSB - Deanstack

week 11 (13th - 17th)


mon - Round off with water treatment
tue - sourced for materials for report
wed - completion and filling of the log book
thu - stamping of log book by industry based supervisor
fri - IT ends

PFW - none
SSB - none