Beruflich Dokumente
Kultur Dokumente
made:
clearly defined and explained to the subs. Within this document, all
included.
a. Years of Operation,
b. Manpower size,
c. Types of Projects?
a. Subcontractor Delays,
c. Climate Delays,
d. Client-End Delays?
supervised and manage from the design until the construction stage of
do their own role. Starting from the owner of the infrastructure until qthe
Some of the projects are being delayed because of the different reasons
The input of the study includes the profile of the different construction
manpower size, and types of projects. The input also includes the degree
The process is carefully analyzes and evaluates the profile of the different