Shenyang Lanying Colored Steel Co.

, Ltd
No. 25, Golden Valley, North 1 Road, Tiexi District, Shenyang, China
PHONE: 0086 (24) 23302377 FAX: 0086 (24) 23302377-812
www.tianyinggroup.com

QUOTATION SHEET
Issued to: Date: 23-May-17
Contact Person:
Project name: Client:
Dimension:66*22*12.03mts, warehouse. Wind speed : 200 Km/h, snow load: 0; Delivery Term: FOB Dalian Seaport
Item Name Specification Qty Unit Unit price (USD) Amount (USD) Remarks
A Steel structure
1 Beam and post Weled H steel 80.284 T 713.39 57274.03
2 Crane H600*300*6*12 14.443 T 713.39 10303.53
3 Tie rod Dia114*3.0 1.922 T 690.63 1327.38
Q235B/Q345B, main steel frame
4 Roof support L steel: L80*5 1.213 T 690.63 837.73 and sub steel structural
5 Column support L steel: L80*5 0.381 T 690.63 263.13 components: fabricate, cut,
6 Purlin brace L steel: L50*4 0.674 T 690.63 465.48 strightening; shotblasting and
7 Tie rod 12mm steel bar 0.981 T 690.63 677.50 derust Sa 2.5 grade;auti-rust
painting
8 Support rod Dia .32*2.5 0.162 T 690.63 111.88
9 Roof purlin Z200*70*20*2.2 8.523 T 584.38 4980.63
10 Wall purlin Z160*60*20*2.0 9.623 T 584.38 5623.44
Subtoal: US$81,864.74
B Roof and wall

Subtoal: US$0.00
C Door and window

Subtoal: US$0.00
D Accessorries
1 Anchor bolt M60/M24 168 pcs 6.07 1020.00 Black
2 Standard nut M60/M24 504 pcs 0.46 229.50 Black
3 High Strength bolt M20 400 pcs 0.76 303.57 Black, 10.9S
4 Standard bolt M20 156 pcs 0.46 71.04 Black
5 Standard bolt M12 2870 pcs 0.15 435.63 Black
Subtoal: US$2,059.73
E Transportation
1 Packing, container loading, 40'HQ 5 ctns 892.86 4464.29
domestic freight, Customs
2 declaration and etc. 20'GP ctns 818.45 0.00
Subtoal: US$4,464.29
Total: US$88,388.75
Floor area: 1452m² Unit pirce: $60.87/m²
F Payment method
30% deposit: US$26,516.63
Balance to be paid US$61,872.13

PAYMENT TERM:
30% deposit before production, balance to be paid before shipment on FOB term
VALIDITY OF THE QUOTATION:
This quotation is valid within 7 days from the date of this quotation.
DELIVERY TIME:
Shipment will be made within 25 days after receipt of payment.