This document lists 98 recommended practices documents published by AACE International related to project cost estimating, project scheduling, risk analysis, and earned value management. Each document provides guidance on processes and methods within those disciplines and includes a product number and option to purchase the document. The recommended practices cover a wide range of industries including construction, engineering, mining, and transportation infrastructure.
This document lists 98 recommended practices documents published by AACE International related to project cost estimating, project scheduling, risk analysis, and earned value management. Each document provides guidance on processes and methods within those disciplines and includes a product number and option to purchase the document. The recommended practices cover a wide range of industries including construction, engineering, mining, and transportation infrastructure.
This document lists 98 recommended practices documents published by AACE International related to project cost estimating, project scheduling, risk analysis, and earned value management. Each document provides guidance on processes and methods within those disciplines and includes a product number and option to purchase the document. The recommended practices cover a wide range of industries including construction, engineering, mining, and transportation infrastructure.
o 101R-19: Roles and Responsibilities of a Project Cost Estimator
Item #:101R-19 ADD TO CART o 10S-90: Cost Engineering Terminology Item #:RP10S-90 ADD TO CART o 11R-88: Required Skills and Knowledge of Cost Engineering Item #:RP11R-88 ADD TO CART o 13S-90: Recommended Method for Determining Building Area Item #:RP13S-90 ADD TO CART o 14R-90: Responsibility and Required Skills for a Project Planning and Scheduling Professional Item #:RP14R-90 ADD TO CART o 15R-81: Profitability Methods Item #:RP15R-81 ADD TO CART o 16R-90: Conducting Technical and Economic Evaluations - Process and Utility Industries Item #:RP16R-90 ADD TO CART o 17R-97: Cost Estimate Classification System Item #:RP17R-97 ADD TO CART o 18R-97: Cost Estimate Classification System - EPC for the Process Industries Item #:RP18R-97 ADD TO CART o 19R-97: Estimate Preparation Costs – As Applied for the Process Industries Item #:RP19R-97 ADD TO CART o 20R-98: Project Code of Accounts Item #:RP20R-98 ADD TO CART o 21R-98: Project Code of Accounts – EPC for the Process Industries Item #:RP21R-98 ADD TO CART o 22R-01: Direct Labor Productivity Measurement - Construction and Major Maintenance Projects Item #:RP22R-01 ADD TO CART o 23R-02: Identification of Activities Item #:RP23R-02 ADD TO CART o 24R-03: Developing Activity Logic Item #:RP24R-03 ADD TO CART o 25R-03: Estimating Lost Labor Productivity in Construction Claims Item #:RP25R-03 ADD TO CART o 27R-03: Schedule Classification System Item #:RP27R-03 ADD TO CART o 28R-03: Developing Location Factors by Factoring - Architecture, EPC Item #:RP28R-03 ADD TO CART o 29R-03: Forensic Schedule Analysis Item #:RP29R-03 ADD TO CART o 30R-03: Implementing Project Constructability Item #:RP30R-03 ADD TO CART o 31R-03: Reviewing, Validating, and Documenting the Estimate Item #:RP31R-03 ADD TO CART o 32R-04: Determining Activity Durations Item #:RP32R-04 ADD TO CART o 33R-15: Developing the Work Breakdown Structure Item #:RP33R-15 ADD TO CART o 34R-05: Basis of Estimate Item #:RP34R-05 ADD TO CART o 35R-09: Development of Cost Estimate Plans - Building and General Construction Industries Item #:RP35R-09 ADD TO CART o 36R-08: Development of Cost Estimate Plans - EPC for the Process Industries Item #:RP36R-08 ADD TO CART o 37R-06: Schedule Levels of Detail - As Applied in Engineering, Procurement, and Construction Item #:RP37R-06 ADD TO CART o 38R-06: Documenting the Schedule Basis Item #:RP38R-06 ADD TO CART o 39R-06: Project Planning - As Applied in Engineering and Construction for Capital Projects Item #:RP39R-06 ADD TO CART o 40R-08: Contingency Estimating - General Principles Item #:RP40R-08 ADD TO CART o 41R-08: Risk Analysis and Contingency Determination Using Range Estimating Item #:RP41R-08 ADD TO CART o 42R-08: Risk Analysis and Contingency Determination Using Parametric Estimating Item #:RP42R-08 ADD TO CART o 43R-08: Risk Analysis and Contingency Determination Using Parametric Estimating - Example Models Item #:RP43R-08 ADD TO CART o 44R-08: Risk Analysis and Contingency Determination Using Expected Value Item #:RP44R-08 ADD TO CART o 45R-08: Scheduling Claims Protection Methods Item #:RP45R-08 ADD TO CART o 46R-11: Required Skills and Knowledge of Project Cost Estimating Item #:RP46R-11 ADD TO CART o 47R-11: Cost Estimate Classification System - Mining and Mineral Processing Industries Item #:RP47R-11 ADD TO CART o 48R-06: Schedule Constructability Review Item #:RP48R-06 ADD TO CART o 49R-06: Identifying the Critical Path Item #:RP49R-06 ADD TO CART o 50R-16: Trending and Forecasting of CPM Schedules Item #:RP50R-16 ADD TO CART o 52R-06: Prospective Time Impact Analysis - As Applied in Construction Item #:RP52R-06 ADD TO CART o 53R-06: Schedule Update Review - As Applied In Engineering, Procurement and Construction Item #:RP53R-06 ADD TO CART o 54R-07: Recovery Scheduling - As Applied in Engineering, Procurement, and Construction Item #:RP54R-07 ADD TO CART o 55R-09: Analyzing S-Curves Item #:RP55R-09 ADD TO CART o 56R-08: Cost Estimate Classification System - Building and General Construction Industries Item #:RP56R-08 ADD TO CART o 57R-09: Integrated Cost and Schedule Risk Analysis Using Monte Carlo Simulation of a CPM Model Item #:RP57R-09 ADD TO CART o 58R-10: Escalation Estimating Principles and Methods Using Indices Item #:RP58R-10 ADD TO CART o 59R-10: Development of Factored Cost Estimates - EPC for the Process Industries Item #:RP59R-10 ADD TO CART o 60R-10: Developing the Project Controls Plan Item #:RP60R-10 ADD TO CART o 61R-10: Schedule Design - As Applied in Engineering, Procurement, and Construction Item #:RP61R-10 ADD TO CART o 62R-11: Risk Assessment: Identification and Qualitative Analysis Item #:RP62R-11 ADD TO CART o 63R-11: Risk Treatment Item #:RP63R-11 ADD TO CART o 64R-11: CPM Schedule Risk Modeling and Analysis: Special Considerations Item #:RP64R-11 ADD TO CART o 65R-11: Integrated Cost & Schedule Risk Analysis and Contingency Determination Using Expected Value Item #:RP65R-11 ADD TO CART o 66R-11: Selecting Probability Distribution Functions for Cost and Schedule Risk Simulation Models Item #:RP66R-11 ADD TO CART o 67R-11: Contract Risk Allocation - As Applied in Engineering, Procurement, and Construction Item #:RP67R-11 ADD TO CART o 68R-11: Escalation Estimating Using Indices and Monte Carlo Simulation Item #:RP68R-11 ADD TO CART o 69R-12: Cost Estimate Classification System - EPC for the Hydropower Industry Item #:RP69R-12 ADD TO CART o 70R-12: Principles of Schedule Contingency Management - Engineering, Procurement and Construction Item #:RP70R-12 ADD TO CART o 71R-12: Required Skills and Knowledge of Decision and Risk Management Item #:RP71R-12 ADD TO CART o 72R-12: Developing a Project Risk Management Plan Item #:RP72R-12 ADD TO CART o 73R-13: Establishing Labor Productivity Norms Item #:RP73R-13 ADD TO CART o 74R-13: Basis of Estimate - As Applied for the Software Services Industries Item #:RP74R-13 ADD TO CART o 75R-13: Schedule and Cost Reserves within the Framework of ANSI EIA-748 Item #:RP75R-13 ADD TO CART o 77R-15: Quality Control/Quality Assurance for Risk Management Item #:RP77R-15 ADD TO CART o 78R-13: Original Baseline Schedule Review - As Applied in Engineering, Procurement, and Construction Item #:RP78R-13 ADD TO CART o 79R-13: Level of Effort Planning and Execution on Earned Value Projects - Within ANSI EIA-748 Item #:RP79R-13 ADD TO CART o 80R-13: Estimate at Completion (EAC) Item #:RP80R-13 ADD TO CART o 81R-13: Required Skills and Knowledge of Earned Value Management Item #:RP81R-13 ADD TO CART o 82R-13: Earned Value Management Overview and Recommended Practices Consistent with EIA-748-C Item #:RP82R-13 ADD TO CART o 83R-13: Organizational Breakdown Structure and Responsibility Assignment Matrix Item #:RP83R-13 ADD TO CART o 84R-13: Planning and Accounting for Adverse Weather Item #:RP84R-13 ADD TO CART o 85R-14: Use of Decision Trees in Decision Making Item #:RP85R-14 ADD TO CART o 86R-14: Variance Analysis and Reporting Item #:RP86R-14 ADD TO CART o 87R-14: Cost Estimate Classification System - Petroleum Exploration and Production Industry Item #:RP87R-14 ADD TO CART o 88R-15: Tracking the Procurement Process using a CPM Schedule – As Applied in Construction Item #:RP88R-15 ADD TO CART o 89R-16: Management Summary Schedule Item #:RP89R-16 ADD TO CART o 90R-17: Statusing the CPM Schedule – As Applied in Construction Item #:RP90R-17 ADD TO CART o 91R-16: Schedule Development Item #:RP91R-16 ADD TO CART o 92R-17: Analyzing Near-Critical Paths Item #:RP92R-17 ADD TO CART o 93R-17: Schedule Logs Item #:RP93R-17 ADD TO CART o 94R-18: Cost Control Software Requirements Item #:RP94R-18 ADD TO CART o 95R-18: Construction Photography to Document Project Status Item #:RP95R-18 ADD TO CART o 96R-18: Cost Estimate Classification System – As Applied in Power Transmission Line Infrastructure Projects Item #:RP96R-18 ADD TO CART o 97R-18: Cost Estimate Classification System – As Applied in Pipeline Transportation Infrastructure Projects Item #:RP97R-18 ADD TO CART o 98R-18: Cost Estimate Classification System – As Applied in Engineering, Procurement, and Construction for the Road and Rail Transportation Infrastructure Industries Item #:RP98R-18 ADD TO CART