Beruflich Dokumente
Kultur Dokumente
①
Opening on
Monterrace Lake MAIN
AUG 2018
ENTRANCE
Start of Construction : NOV 2017
Completion Date : MAR 2019
②
SHOPPING
MALL
③
⑥ HILTON
⑦ PRIVATE HOTEL
GOLF VILLA MONTERRACE LAKE
COURSE(36H) ④
WATER
PARK
⑤
SINGAPORE
SCHOOL
Opening on
MAR 2019
MONTERRACE HEIGHTS
TOWER L2 TOWER L1
① ⑦ ① ⑦
② ③ ⑤ ⑥ ② ③ ⑤ ⑥
■ 2BR 60 86 6,448,000
STUDIO PLAN OF MONTERRACE LAKE
MONTERRACE LAKE
STUDIO
UNIT SIZE 40 ㎡
MONTERRACE LAKE
2 BR UNIT
UNIT SIZE 86 ㎡
OPTION
Without Discount 10% 90% payable in 15 months
B
NOTE
ː For Option A, no extension for the remaining balance of 90% within 0-30 days.
ː For Option B, remaining balance should be paid within 15 months or before the turn over date.
ː Monthly equal payments through post dated checks are required and should be made payable to
DONGGWANG CLARK CORPORATION.
REFFERENCE IMAGES
DONGGWANG CLARK SALES & MARKETING
2017.11.07
* NOTE: NO REPRESENTATION IS BEING MADE HEREIN. THE IMAGES, DETAILS AND VISUALS SHOWN HEREIN ARE ONLY INTENDED TO GIVE A GENERAL IDEA OF THE PROJECT AND AS SUCH ARE NOT TO BE RELIED UPON AS STATEMENTS OF FACT.