Sie sind auf Seite 1von 8

SCHOOL OF COMPUTER SCIENCE & ENGINEERING

COMPUTER ENGINEERING
BACHELOR OF TECHNOLOGY
IV YEAR
SESSION 2019-19

PROJECT REPORT
ON
PLACEMENT MANAGEMENT SYSTEM

Amit Pal
2015PUSETBCEX03802
Kuldeep Kumar Vimal
2015PUSETBCEX03514

Mr. Devendra Prasad Mr. Ravi Kumar

Guide HOD

POORNIMA UNIVERSITY
IS 2027-31, Ramchandrapura, PO Vidhani Vatika
Sitapura Extension, Jaipur – 303905, Rajasthan (India)
www.poornima.edu.in
CERTIFICATE

This is to certify that the project work report entitled “Placement


Management System” is submitted by Amit Pal
(2015PUSETBCEX03802), students of final year VIII semester in partial
fulfillment of the degree of Bachelor of Technology in Computer
Engineering of Poornima University, Jaipur during the academic year
2018-2019. The work has been found satisfactory and is approved for
submission.

Mr. Devendra Prasad


Guide

Mr. Devendra Prasad Dr. Rattan Rana


Project Coordinator (Dean, SCE)
CE

Mr. Ravi Kumar Dr. Manoj Gupta


(HOD, Dept. of CE) (DEAN, SET)

(ii)
ACKNOWLEDGEMENT

It is our privilege to express our sincerest regards to our project


coordinator, Mr. Devendra Prasad for his valuable inputs, able
guidance, encouragement, whole-hearted cooperation and
constructive criticism throughout the duration of our project. Many
thanks to our project guide, Mr. Devendra Prasad, who has given his
full effort in guiding the team for achieving the goal as well as his
encouragement to maintain our progress in track.

We are thankful to Dr. Manoj Gupta, Provost, Poornima University &


Dean, SET for providing me a platform to carry out the project work.

We deeply express our sincere thanks to our Head of Department, Mr.


Ravi Kumar for encouraging and allowing us to make the project on the
topic “Placement Management System” at our department
premises.

We would like to express our hearts felt appreciation to all faculty


members whose direct or indirect suggestions helped us to develop this
project. We pay our respect and love to our parents and all other family
members and friends for their love and encouragement throughout our
career.

Amit Pal(2015PUSETBCEX03802)

(iii)
Table of Content

Title Page -
Certificate ii
Acknowledgement iii
Table of Content iv
List of Figures vi

Chapter 1 Introduction 1
1.1 Project Overview 1
1.2 Purpose 1
1.3 Document Convention 1
1.4 Project Scope 1-2
Chapter 2 Framework Study & Analysis 3-5
2.1 Project Information
2.1.1 Project Perspective
2.1.2 Project Features
2.2 Project Analysis 5
2.2.1 Functional Requirements 5
2.2.2 Non-Functional Requirements 6
2.2.3 Performance Requirements 7
2.2.4 Hardware Requirements 7

Chapter 3 Attainablity Study 8


3.1 Technical Study 8
3.2 Economic Study 8
3.3 Operational Study 9

(iv)
Chapter 4 Framework Design 10
4.1 Definition 10
4.2 ER Modeling 10
4.3 Elements & Attributes 10
4.4 Connections between Entities 11-12
Chapter 5 Description of Front-end 13
Hyper Text Markup Language 13
For What Motivations used to use HTML 13-15
Chapter 6 Description of Server Language 16
History 16
Authorizing 16
Use 17
Syntax 18
Information Types 19
Capacities 20
Articles 21-22
Speed Enhancement 23
XAMPP 24
Pre-requisite & Highlights 24
Parts 24
Data Tuples 25-27
Chapter 7 Testing 28
7.1 Overview 28
7.2 Definition 29
7.3 Testing Methodologies 30
2.2.1 Black Box Testing 30
2.2.2 White Box Testing 30
2.2.3 Gray Box Testing 30
2.2.4 Typed of Testing 30-32

(v)
Chapter 8 Previews of T&P Cell 33-44
Chapter 9 Conclusion 45
Bibliography 46

(vi)
List of Figures

Entity Diagram 12

Homepage 33

Student Login 34

Student Registration 35

HOD Login 36

Placement Login 37

Principal Login 38

About us 39

Recent Drive Focus Box 40

What we offered and what we promote 41

Ongoing and upcoming drives 42

Meet our team 43

Contact Us 44

(vii)

Das könnte Ihnen auch gefallen