PT PLN (Persero)

UNIT INDUK PENYALURAN DAN PUSAT PENGATUR BEBAN SUMATERA


UNIT PELAKSANA TRANSMISI JAMBI

BILL OF QUANTITY (BOQ)


Pengadaan Alarm pada Rectifier dan Pengadaan MCB DC Untuk Pengg

Material
No. Uraian Satuan Volume Harga Satuan
(Rp)
1 2 3 4 5
I Material
1 KABEL NYCY 4 x 2,5 mm (50 m) roll 94
2 KABEL NYAF 1 x 2,5 mm (20 m) roll 94
3 MCB DC 100 A 10 kA 3P bh 94
4 Horn Buzzer Alarm (110 VDC) bh 94
5 Terminal Block 2,5 mm with stoper (50 pcs) bh 94
6 Skun I ukuran 2,5 mm (1 pack @100 pcs) pack 94
7 Skun O ukuran 2,5 mm (1 pack @100 pcs) pack 94
8 Skun U ukuran 2,5 mm (1 pack @100 pcs) pack 94
9 Kabel Tie Mount 20x20mm @100 pcs pack 94
10 Lampu Bolam 110 VDC bh 470

II Jasa Pengiriman
1 UPT Tanjung Karang lot 1
2 UPT Pekanbaru lot 1
3 UPT Padang lot 1
4 UPT Bengkulu lot 1
5 UPT Palembang lot 1

JUMLAH
PPN 10%
TOTAL
TERBILANG :
QUANTITY (BOQ)
an Pengadaan MCB DC Untuk Pengganti Fuse

Material Jasa Pengiriman


Jumlah Harga
Jumlah Harga Harga Satuan Jumlah Harga (Rp)
(Rp) (Rp) (Rp)
6=4X5 7 8=4X7 9=6+8
Jumlah Rectifier
yang akan KABEL NYCY 4 KABEL NYAF 1
No. UPT dipasang Alarm x 2,5 mm (50 x 2,5 mm (20
Internal Fault m) m)

1 Pekanbaru 16 6 10 10
2 Padang 32 16 16 16
3 Jambi 15 5 10 10
4 Bengkulu 35 17 18 18
5 Palembang 53 33 20 20
6 Tanjung Karang 48 28 20 20
JUMLAH 199 105 94 94
KEBUTUHAN MATERIAL
Terminal 2,5 Skun I ukuran Skun O Skun U ukuran Kabel Tie
MCB DC Horn Buzzer mm with 2,5 mm (1 ukuran 2,5 2,5 mm (1 Mount
100 A DC (110 VDC) stoper (50 pack @100 mm (1 pack pack @100 20x20mm
pcs) pcs) @100 pcs) pcs) @100 pcs
10 10 10 10 10 10 10
16 16 16 16 16 16 16
10 10 10 10 10 10 10
18 18 18 18 18 18 18
20 20 20 20 20 20 20
20 20 20 20 20 20 20
94 94 94 94 94 94 94
Lampu Bolam Lampu Bolam
110 VDC 48 VDC

50 50
80 80
50 50
90 90
100 100
100 100
470 470
BILL OF QUANTITY

No. Uraian Satuan Volume

1 2 3 4
UPT Jambi
1 KABEL NYCY 4 x 2,5 mm (50 m) roll 10
2 KABEL NYAF 1 x 2,5 mm (20 m) roll 10
3 MCB DC 100 A bh 10
4 Horn Buzzer DC (110 VDC) bh 10
5 Terminal 2,5 mm with stoper (50 pcs) bh 10
6 Skun I ukuran 2,5 mm (1 pack @100 pcs) bh 10
7 Skun O ukuran 2,5 mm (1 pack @100 pcs) bh 10
8 Skun U ukuran 2,5 mm (1 pack @100 pcs) set 10
9 Kabel Tie Mount 20x20mm @100 pcs pack 10
10 Lampu Bolam 110 VDC pack 50

TOTAL

No. Uraian Satuan Volume

1 2 3 4
UPT Tanjung Karang
1 KABEL NYCY 4 x 2,5 mm (50 m) roll 20
2 KABEL NYAF 1 x 2,5 mm (20 m) roll 20
3 MCB DC 100 A bh 20
4 Horn Buzzer DC (110 VDC) bh 20
5 Terminal 2,5 mm with stoper (50 pcs) bh 20
6 Skun I ukuran 2,5 mm (1 pack @100 pcs) bh 20
7 Skun O ukuran 2,5 mm (1 pack @100 pcs) bh 20
8 Skun U ukuran 2,5 mm (1 pack @100 pcs) set 20
9 Kabel Tie Mount 20x20mm @100 pcs pack 20
10 Lampu Bolam 110 VDC pack 100

TOTAL

No. Uraian Satuan Volume


No. Uraian Satuan Volume

1 2 3 4
UPT Pekanbaru
1 KABEL NYCY 4 x 2,5 mm (50 m) roll 10
2 KABEL NYAF 1 x 2,5 mm (20 m) roll 10
3 MCB DC 100 A bh 10
4 Horn Buzzer DC (110 VDC) bh 10
5 Terminal 2,5 mm with stoper (50 pcs) bh 10
6 Skun I ukuran 2,5 mm (1 pack @100 pcs) bh 10
7 Skun O ukuran 2,5 mm (1 pack @100 pcs) bh 10
8 Skun U ukuran 2,5 mm (1 pack @100 pcs) set 10
9 Kabel Tie Mount 20x20mm @100 pcs pack 10
10 Lampu Bolam 110 VDC pack 50

TOTAL
BILL OF QUANTITY

No. Uraian Satuan Volume

1 2 3 4
UPT Padang
1 KABEL NYCY 4 x 2,5 mm (50 m) roll 16
2 KABEL NYAF 1 x 2,5 mm (20 m) roll 16
3 MCB DC 100 A bh 16
4 Horn Buzzer DC (110 VDC) bh 16
5 Terminal 2,5 mm with stoper (50 pcs) bh 16
6 Skun I ukuran 2,5 mm (1 pack @100 pcs) bh 16
7 Skun O ukuran 2,5 mm (1 pack @100 pcs) bh 16
8 Skun U ukuran 2,5 mm (1 pack @100 pcs) set 16
9 Kabel Tie Mount 20x20mm @100 pcs pack 16
10 Lampu Bolam 110 VDC pack 80

TOTAL

No. Uraian Satuan Volume

1 2 3 4
UPT Bengkulu
1 KABEL NYCY 4 x 2,5 mm (50 m) roll 18
2 KABEL NYAF 1 x 2,5 mm (20 m) roll 18
3 MCB DC 100 A bh 18
4 Horn Buzzer DC (110 VDC) bh 18
5 Terminal 2,5 mm with stoper (50 pcs) bh 18
6 Skun I ukuran 2,5 mm (1 pack @100 pcs) bh 18
7 Skun O ukuran 2,5 mm (1 pack @100 pcs) bh 18
8 Skun U ukuran 2,5 mm (1 pack @100 pcs) set 18
9 Kabel Tie Mount 20x20mm @100 pcs pack 18
10 Lampu Bolam 110 VDC pack 90

TOTAL

No. Uraian Satuan Volume


No. Uraian Satuan Volume

1 2 3 4
UPT Palembang
1 KABEL NYCY 4 x 2,5 mm (50 m) roll 20
2 KABEL NYAF 1 x 2,5 mm (20 m) roll 20
3 MCB DC 100 A bh 20
4 Horn Buzzer DC (110 VDC) bh 20
5 Terminal 2,5 mm with stoper (50 pcs) bh 20
6 Skun I ukuran 2,5 mm (1 pack @100 pcs) bh 20
7 Skun O ukuran 2,5 mm (1 pack @100 pcs) bh 20
8 Skun U ukuran 2,5 mm (1 pack @100 pcs) set 20
9 Kabel Tie Mount 20x20mm @100 pcs pack 20
10 Lampu Bolam 110 VDC pack 100

TOTAL
ILL OF QUANTITY

Material Jasa Pengiriman


Harga Satuan (Rp) Jumlah Harga (Rp) Harga Satuan (Rp) Jumlah Harga (Rp)

5 6=4x5 7 8=4x7

Material Jasa Pengiriman


Harga Satuan (Rp) Jumlah Harga (Rp) Harga Satuan (Rp) Jumlah Harga (Rp)

5 6=4x5 7 8=4x7

Material Jasa Pengiriman


Harga Satuan (Rp) Jumlah Harga (Rp) Harga Satuan (Rp) Jumlah Harga (Rp)

5 6=4x5 7 8=4x7
ILL OF QUANTITY

Material Jasa Pengiriman


Harga Satuan (Rp) Jumlah Harga (Rp) Harga Satuan (Rp) Jumlah Harga (Rp)

5 6=4x5 7 8=4x7

Material Jasa Pengiriman


Harga Satuan (Rp) Jumlah Harga (Rp) Harga Satuan (Rp) Jumlah Harga (Rp)

5 6=4x5 7 8=4x7

Material Jasa Pengiriman


Harga Satuan (Rp) Jumlah Harga (Rp) Harga Satuan (Rp) Jumlah Harga (Rp)

5 6=4x5 7 8=4x7
PT. PLN (Persero)
UNIT INDUK PENYALURAN DAN PUSAT PENGATUR BEBAN SUMATERA
UNIT PELAKSANA TRANSMISI JAMBI

RENCANA PENGADAAN BARANG / JASA


Nomor : /REN.01.06/MRENEV/2019
='R
EK 1. Pengusulan Rencana Pengadaan Barang / Jasa untuk pekerjaan :
AP
LO Pengadaan Alarm pada Rectifier dan Pengadaan MCB DC Untuk Pengganti Fuse
KA dengan nilai :
SI'!
B2 Rp - :
4:O 0
24

Anggaran Tersedia : Rp 539,780,000


HPE : Rp -
Sisa Anggaran : Rp 539,780,000

2. Kebutuhan ini merupakan kegiatan : Rutin


Investasi
Non Rutin * )

3. Kategori Kebutuhan : Terencana


Tidak Terencana *** )

4. Kategori riset pasar : * )


A. Sudah PK dan DD B. Belum PK dan DD
DPT Shortlist Tidak perlu / Tidak ada DPT
C. Riset pasar memuaskan D. Riset pasar tidak memuaskan

5. Diusulkan pekerjaan ini menggunakan Metode Pemilihan : **** )


Pelelangan Terbatas Pelelangan terbuka
Penunjukan langsung Pengadaan langsung

6. Kegiatan tersebut anggarannya tersedia pada Pos Anggaran : * )


Rencana Kegiatan No. ........................................
Surat Kuasa Kerja (SKK) No. 3222.2019.1.100.GI.007
Surat Kuasa Investasi (SKI) No. ........................................
Surat Kuasa Khusus No. ........................................

7. Dibebankan pada Kode Perkiraan : ............................................. ** )

8. Batas waktu pelaksanaan * ) 90 (Sembilan puluh) Hari kalender yang akan ditagihkan
sesuai Kontrak

EVALUASI / USULAN EVALUASI / ANGGARAN KEPUTUSAN


MANAGER BAGIAN RENEV PLT. MANAGER BAGIAN KEU DAN ADM SETUJU / TIDAK SET
MANAGER
CANDRA SOLINAR RISKA HANDANI WEGIG AGUS TRIYO

Keterangan :
- *) Diisi Manager Perencanaan & Evaluasi
- ** ) Diisi Manager Admum
- *** ) Diisi Pengguna & Wakil Pengguna
- **** ) Diisi Pejabat Pelaksana Pengadaan
PENGADAAN BARANG / JASA
/REN.01.06/MRENEV/2019

daan MCB DC Untuk Pengganti Fuse

Tidak perlu / Tidak ada DPT

0 (Sembilan puluh) Hari kalender yang akan ditagihkan

KEPUTUSAN
SETUJU / TIDAK SETUJU
MANAGER
WEGIG AGUS TRIYOGO