Location : 15th Avenue Socorro Quezon City
Subject : Statement of Work Accomplishment Photos
Item Works : Civil and Electrical
Date : As of September 8, 2017
B Scope of Works
Installation of welded wiremesh with frame at Parking area left side
1
2 CHB Wall making good at parking NOT DONE
Painting of covered court walls, columns, parking columns, walls, slabs ceiling & beams, brgy
hall interior walls, ceiling at ground
4 Painting of steel truss and frames, purlins
Polycarbonate roof canopy with steel frame fabrication, installation and painting at covered
court perimeter
6 Casement window glass only at brgy hall ground floor
Page 1 of 2
New steel casement window at CR
8 Repair of metal louver, additional louver installation welding works at 2nd floor
Additional floor slab at parking entrance
9 NOT DONE
10 Painting of steel stair
Electrical works labor cost (2nd floor court lightings
11
12 Application of skimcoat and sanding to covered court
Installation of door and jamb at CR
13 NOT DONE
Submitted by
JERRY MIRAFLORES
Page 2 of 2