Earthworks

ROAD EXCAVATION Rate


Roadway excavation, soil suitable for fill. 1,003.95
Road excavation soft rock 3,322.25
Road excavation, boulders 5,674.50
Road excavation, hard rock 6,668.75
Roadway excavation, unsuitable soil 960.30
Roadway excavation, sub grade replacement 1,406.50
Road pavement excavation 1,649.00
Prepare sub grade in cut areas 87.30
CHANNEL EXCAVATION
Channel excavation, soil suitable for fill 989.40
Channel excavation, soft rock 3,113.70
Channel excavation, boulders 6,746.35
Channel excavation, hard rock 6,717.25
Channel excavation, unsuitable soil 960.30
EXCAVATION AND BACKFILL OF STRUCTURES -
Excavation for structures, soil suitable for backfill. 1,818.75
Excavation for structures, soft rock 6,227.40
Excavation for structures, boulders 6,746.35
Excavation for structures, hard rock 6,790.00
Excavation for structures, unsuitable soil 1,721.75
Backfill with granular material 4,151.60

EMBANKMENT CONSTRUCTION
Embankment construction, Type 1 2,328.00
Embankment construction, Type 2 2,279.50
Embankment construction using rock fill 4,151.60
Trimming, Levelling and compaction of original
82.45
ground to standard density
Geotextile 1,018.50

Preliminaries

TRAFFIC SAFETY AND CONTROL


Traffic safety and control 1,807,265.20
CONTRACTOR'S SITE ESTABLISHMENT
Site establishment for the Contractor with
mobilisation of plant and machinery 15,617,000.00

Removal of the site establishment for the Contractor


and reinstatement of land excluding those that are 8,245,000.00
handed over to employer
MONTHLY PROGRESS REPORT
Progress photographs 25,947.50
SETTING OUT,CROSS SECTION SURVEYS AND DRAWINGS
Marking Centre Line and Topographic survey 83,032.00
Survey and preparation of Cross Sections/Structural Drawings 1,556.85
Design,Survey and other investigations 15,520,000.00
PROJECT SIGN BOARDS
Provide and maintain project signboards 114,169.00
Provide & maintain Plaques 62,274.00
INSURANCE, BONDS AND SECURITIES
Insurance of the works 9,341,100.00
Insurance of the contractor's equipment 4,171,000.00
Third party insurance 3,637,500.00
Workmen's compensation insurance 3,637,500.00
Performance security (5 Percent of Contract Sum) 14,550,000.00
Bank guarantee for advance payment 25,705,000.00
OFFICE FOR THE EMPLOYER/ENGINEER
Provide fully furnished office for the Engineer, Type 1 4,151,600.00
Provide fully furnished office for the Employer, Type
4,151,600.00
1
Maintenance of office for the Engineer, Type 1 197,201.00
Maintenance of office for the Employer, Type 1 197,201.00
HOUSING FOR THE EMPLOYER/ENGINEER
Provide fully furnished housing for the Engineer, Type
3,528,860.00
1
Provide fully furnished housing for the Employer,
3,528,860.00
Type 1
Provide fully furnished housing for Engineer staff,
2,179,590.00
Type 2
Service and maintain housing for the Engineer, Type 1 145,306.00
Service and maintain housing for the Employer, Type
145,306.00
1
Service and maintain housing for Engineer staff, Type
77,842.50
2
VEHICLE FOR THE EMPLOYER/ENGINEER -
Provide vehicle for the Engineer 6,974,688.00
Provide vehicle for the Employer 6,974,688.00
Provide motorcycles (125cc) 25,947.50
Maintenance of the vehicles - Type B (Max 3000
155,685.00
km/month)
Maintenance of the vehicles - Type B (Max 3000
155,685.00
km/month)
Maintenance of the motorcycles(125cc) 25,947.50
LAB AND LAB EQUIPMENT -
Provide a laboratory with equipments 5,820,000.00
Maintain laboratory and lab equipments 207,580.00
OPERATIVES FOR THE ENGINEER'S STAFF -
Survey Assistant 36,326.50
Administrator/Cleark 36,326.50
CAD Operator 46,705.50
Office Assistants 31,137.00
Labourer 31,137.00

Culvert and Structures

CULVERTS Rate
Aggregate backfill 4,462.00
Filter medium 4,656.00
Impervious layer 363.75
Weep hole, PVC pipe (Type600)-75mm diameter 873.00
Granular aggregate bedding 4,656.00
Concrete for encasement of pipes (Grade20) 19,720.10
Laying & Jointing concrete pipes 900mm diameter ((Single Row)
13,647.90
Laying & Jointing concrete pipes 900mm diameter(Double Rows)
26,966.00
Laying & Jointing concrete pipes 1200mm diameter ((Single Row)
26,432.50
Concrete: Grade C 15 16,490.00
Concrete: Grade C25 19,545.50
Concrete: Grade C30 23,037.50
Tor steel reinforcement (460N/mm2) 218,250.00
Random rubble masonry 10,864.00
Plastering, 1:3 cement sand mix, 16mm thick 1,086.40
Formwork smooth finish 1,964.25
Formwork rough finish 1,867.25
25mm Steel dowels at 500mm c/c 873.00
STRUCTURES -
Aggregate backfill 4,151.60
Filter medium 4,355.30
Impervious layer 358.90
Weep hole, PVC pipe (Type600)-75mm diameter 824.50
Gabion wall construction
Concrete: Grade C 15 16,490.00
Concrete: Grade C 25 19,545.50
Tor steel reinforcement 218,250.00
Random rubble masonry 10,864.00
Plastering,1:3cement sand mix,16mm thick 1,154.30
Formwork smooth finish 1,940.00
Formwork rough finish 1,843.00

Incidental Works

TOP SOILING AND GRASSING


Furnish, spread and compact top soil 203.70
Grass sodding as approved by the Engineer 329.80
Dumped Rip rap 5,548.40
PAVED SIDE WALKS AND PRECAST CONCRETE KERBS
Precast concrete slab (450x450x50mm) paving 2,696.60
Road kerbs (standerd) 3,322.25
GUARD RAILS, GUARD WALLS, GUARD STONES
Guard Rails
Guard stone 3,734.50
ROAD MARKINGS
Center line : Continuous(3mm thickness) 2,231.00
Center line : Intermittent(3mm thickness) 2,231.00
Edge line : Continuous(3mm thickness) 2,231.00
Pedestrian crossing 2,279.50
Reflecting road studs 2,075.80
TRAFFIC SIGNS
Single pole, sign area up to 0.5m2 12,454.80
Double pole, sign area up to 2.0m2 111,550.00
Chevron warning sign
KILOMETRE POSTS AND BOUNDARY MARKERS
Provide, install and paint new kilometre post 10,912.50

MAINTENANCE OF CARRIAGEWAY
Filling pot holes and patch repairs with Asphalt
1,241.60
concrete cold mix (MC30), 20mm and less in depth
Filling pot holes and patch repairs with Asphalt
1,251.30
concrete cold mix (MC30) 75mm and less in depth
Filling pot holes and patch repairs with Asphalt
2,609.30
concrete cold mix (MC30) deeper than 75mm

Provisonal Sum
Provisions and maintenance of temporary by pass
2,000,000.00
roads for culverts, bridges and other structures, if any
Provide adequate environmental protection and
precautions during construction and implement the 3,000,000.00
Environment Management Plan,
Provide Standards and Documents 650,000.00
Repairs to damages of existing servises 800,000.00
Demolition/Rebuilding of property 2,000,000.00
Diversion,protection or removal of electrical servises 15,000,000.00
Diversion,protection or removal of water servises 5,000,000.00
Diversion,protection or removal of telecommunication
5,000,000.00
servises
Provide & maintain Survey equipment 5,000,000.00
Special testes ordered by the Engineer 500,000.00
Grade adjustment of existing manholes 1,000,000.00
Bus Bays/Parking Bays 2,000,000.00
Chemical Blasting 1,000,000.00