Selenia Site Planning and Pre-Installation Guide

Part Number 9-600-0100


Revision 003
Site Planning and Pre-Installation Guide

1.0 Introduction
This guide outlines requirements and considerations when planning the site for installation of the
Selenia System.
There are many considerations when selecting a location for the Selenia System. Included in these
considerations are the following:
• location for patient throughput
• space for patient and medical personnel
• input power source and sufficient wall outlets
• environmental concerns
• shielding
• state and local requirements.
• Seismic requirements (see “Seismic Requirements” on page 17.)

P/N 9-600-0100 1
Site Planning and Pre-Installation Guide

2.0 Room Planning and Layout


The exam room layout should be pre-planned before the arrival of Selenia. A Typical Room Layout is
shown. Check the height and width of the room door to ensure it will accommodate the Gantry and
Acquisition Workstation.

Figure 1-1: Selenia —Typical Room Layout

Legend for Figure 1


Room: 2.75 x 3.65 m (9 x 12 ft.) Ground connection

Scale: 1 Square = 30.4 cm (1 ft.) 100/120 VAC, 3.5 A


220/230/240 VAC, 2.0 A. Hospital grade plug.
220/208/220/230/240 VAC Ethernet and phone jacks
2A (35 A max). Permanent connection.
Interconnect cables through conduit.

P/N 9-600-0100 2
Site Planning and Pre-Installation Guide

Other factors to consider when planning the room layout are:


• C-arm clearances—The C-arm requires 1.3 m (53” minimum) to accommodate rotation, and 2.1
m (84” minimum) to accommodate raising the C-arm to its upper limit.
• When planning the room layout, take into consideration extra wall and ceiling clearance for
movement and handling of C-arm controls.
• Movement clearance—Always take into consideration space allocation for patient and technolo-
gist movement. Avoid obstructions in the room that may hinder access to the unit controls or the
patient.
• Storage—Provide convenient storage for patient records and system accessories. If accessory
storage is not possible within the exam room, make arrangements for safe storage close by.
• Physical and Environmental Requirements
• Recommended Power Source Requirements.
• To ensure proper isolation, a distance of 1.5 m (59”) must be maintained between the patient and
any non-patient devices.

2.1 Access Clearances (Recommended)


Having adequate room for clinical procedures, the full range of system movement, and servicing is
another important consideration. Maintain or exceed the recommended minimum clearances listed
below:
Operator Console: 60.9 cm (24 inches) on all sides
Gantry with C-arm: 30.4 cm (12 inches) at rear, 30 inches (76.2 cm) on each side of
C-arm (for complete rotation of C-arm)
Work and Patient Area: 76.2 cm (30 inches) diameter (minimum) between Gantry, C-arm
and Operator Console

2.2 System Component Sizes


Knowing the size of the system components, the installer can adequately plan for:
• flooring type for mounting and weight considerations
• proper doorway clearance
• installation space
• future servicing
• technologist and patient movement
• equipment movement
Refer to the dimensions for the system components in the specifications section of this document
(page 4).

2.3 Softcopy Workstation (SCW) Recommendations


To achieve optimal viewing condition of images on the SCW:
• Position the SCW next to the film changer at a 45 degree angle relative to the changer. This will
minimize the amount of light reflecting from the film changer on the surface of the SCW moni-
tors.
• The ambient light or illuminance in the viewing room should conform to the ACR recommenda-
tion of 50 lux or less.
• Ensure that light emissions from other sources (i.e. PC monitors, portable lights, etc.) do not
reflect off the SCW monitors.

P/N 9-600-0100 3
Site Planning and Pre-Installation Guide

3.0 Specifications
3.1 Tubestand (Gantry with C-arm)
Height: 190 cm (75”) ± 1 cm; 213 cm (84”) at highest C-arm travel
Width: 65 cm (26“) ± 1 cm (C-arm at 0° position)
Depth: 110 cm (43”)± 1 cm
Horizontal Rotation: 138 cm (54”)
Weight: 300 kg (660 lbs) ± 50 kg (110 lbs)

3.2 Acquisition Workstation


Overall Dimensions 107 cm (W) x 76 cm (D) x 203 cm (H); (42” x 30” x 80 “)
Weight 120 kg (265 lbs)

Figure 1-2: Selenia Dimensions

P/N 9-600-0100 4
Site Planning and Pre-Installation Guide

3.3 Softcopy Workstation (SCW)


Dimensions UPS (not shown):
17 cm (6.7”) W x 44 cm (17.3”) D x 22 cm (8.5”) H
Weight 24.5 kg (54.10 lbs)
Computer:
22 cm (8.7”) W x 48.8 cm (19.2”) D x 49 cm (19.3”) H
Weight 19.1 kg (42 lbs)
Monitors:
40 cm (15.7”) W x 56.1 cm (22.1”) D x 56 cm (22.0”) H
Weight 39.8 kg (87.8 lbs)
Keypad
Dimensions 28 cm (11”) W x 19 cm (7 3/8”) D x 4.45.cm (1 3/4”) H
Keyboard
Dimensions 46 cm (18”) W x 18 cm (7”) D

Figure 1-3: Softcopy Workstation Dimensions

P/N 9-600-0100 5
Site Planning and Pre-Installation Guide

3.4 Operating Environment


3.4.1 General Operating Conditions
Temperature Range 20° C to 30° C
Maximum rate of temperature change <10º C/hr.
Relative Humidity Range 10% to 80% non-condensing
ESD Susceptibility The system complies with the requirements of IEC 601-1-2
EMI Susceptibility The system is immune to levels of EMI radiation per IEC 601-1-2
EMI Generation Limits The system complies with the requirements of IEC 601-1-2
Input Line Surge, fast transient/burst per IEC 601-1-2

3.5 Electrical Input Specifications


3.5.1 Tubestand
Mains Voltage 200/208/220/230/240 VAC nominal (tap selectable at installa-
tion) ±10%, Single Phase, 50/60 Hz, permanently wired
Mains Impedance Maximum line impedance not to exceed 0.20 ohms for 220/230/
240 VAC, 0.16 ohms for 200 VAC (IEC 601-2-7, Table 101)
Maximum Power Consumption 6.5 kVA for 5 second duration
Standby Current 2.0 A Nominal over the entire mains voltage range and frequency
range
Maximum Line Current 35 Amps for 5 seconds
Circuit Breaker Rating 25 Amps—time delay curve to allow for inrush currents, 200%
overload for 7 seconds. (Requires 35 A in-house fuse for ROW
installation.)
Duty Cycle Full load 5 seconds on, 30 seconds off (1:7)

3.5.2 Acquisition Workstation


Input Line Voltage 100/120/220/230/240 VAC, ± 10%
Input Current 3.5 Amps max. @ 100/120 VAC
2.0 Amps max. @ 220/230/240 VAC
Frequency 50, 60 Hz
Method of connection to line Plug, Hospital grade
Number of Phases Single

P/N 9-600-0100 6
Site Planning and Pre-Installation Guide

Softcopy Workstation
Power Requirements UPS, Domestic:
88 to 148 VAC (120 VAC nominal)
50/60 Hz ± 3 Hz auto sensing
NEMA 5 - 15P input connection type
UPS, ROW:
175 to 295 (230 VAC nominal)
50/60 Hz + 3 Hz auto sensing
IEC-320-C14 input connection type
Computer:
90 to 135 VAC at 50/60 Hz
180 to 265 VAC at 50/60 Hz
Monitors:
90 to 264 VAC, 50/60 Hz

4.0 External Interfaces


Telephone Modem Interface Compatible local analog telephone service (RJ11)
Dedicated analog telephone line
Ethernet Connection Twisted pair Ethernet (TPE) connector, CAT5 or better as required
for SCW, printers, or other peripherals

5.0 Storage Environment


5.1 Tubestand
Temperature Range -25° C to +60° C (-13° F to 140° F)
Humidity 0 to 95% humidity— non-condensing (not packaged for outdoor
storage)

5.2 Image Receptor


Storage Temperature Range 10º C to 40º C (50° F to 104° F)
Maximum rate of temperature change <15º C/hr.
Storage Humidity Range 10% to 80% non-condensing
Storage Altitude -16 to 10,600 m (-50 to 35,000 ft)
Max Shipping Altitude 12,000 m (36,000 ft.)

P/N 9-600-0100 7
Site Planning and Pre-Installation Guide

5.3 Softcopy Workstation


UPS:
Storage Temperature -15º C to 45º C (5º to 113º F)
Storage Relative Humidity 0 to 95-%
Storage Elevation 0 m to 15,240 m (0 ft to 50,000 ft)
Computer:
Storage Temperature -40º C to 65º C (-40º to 149º F)
Storage Maximum Vibration 0.5 G at 3 Hz to 200 Hz at 1 octave/minute
Storage Maximum Shock Non-operating (half-sine pulse) 105 G, 2 milliseconds
Non-operating (faired-square wave) 27 G with a change in veloc-
ity of 200”/second
Storage Altitude: -16 m to 10,600 m (-50 ft to 35,000 ft)
Monitors:
Storage Altitude: 7,620 m (25,000 ft)

6.0 Hardcopy Film Printing Devices


Refer to the printer manufacturer's installation specifications.

6.1 Power Specifications


Power requirements AC Single Phase, 90 to 250 VAC, 47-63 MHz
Nominal operating current 2 A @ 115 VAC, 1.25 A @ 220 VAC

P/N 9-600-0100 8
Site Planning and Pre-Installation Guide

7.0 Interconnect Cables


Optional cable sizes other than the ones mentioned below are available.
• Verify that the distance between the Gantry and the Operators Console will accommodate the
two 20-foot multi conductor cables and the ground wire.
• Verify that the distance between the Gantry and the Mains is less than 4.55 meters (15 feet) to
accommodate the input line cord.

Caution: Provide strain relief for the Mains cable: shall not flex, move, etc. The system is considered
permanently connected according to its safety classification.

7.1 Conduit, Wireway, and Threshold Runs


• Verify that in wall wiring, external wall wiring, or external floor wiring meets the criteria detailed
in the system specifications.
• If the wiring does not meet the specifications, determine the necessary changes and make
arrangements for these changes.
• Make a note of any important details of these arrangements in the Checklist.
• When using conduit runs between the Gantry and the Operator Console, observe the following
recommendations:
• Use 90° elbows with access covers for cables needing routing around elbows or corners.
• Use a 2 inch (5.08 cm) conduit down the walls (for rooms with a sub-ceiling)
• Use 2 x 2 inch (5.08 x 5.08 cm) wire way runs across the sub-ceiling.
The 2 x 2 inch (5.08 x 5.08 cm) wire way method removes the requirement for elbows, and makes
the cable installation process more efficient.

8.0 Structural Shielding


The walls of the site in which the Selenia is used must meet local and state guidelines for radiation
shielding and should be reviewed by a qualified Medical Physicist.

8.1 The Operator Console Shield


All Selenia systems are equipped with an operator radiation shield. This shield, which is attached to
the Operator Console, is designed to meet or exceed all state and local shielding requirements for
operator shielding only. The radiation shield shall provide a minimum of 0.5 mm of lead equivalent
attentuation.

P/N 9-600-0100 9
Site Planning and Pre-Installation Guide

9.0 Separation of Patient and Non-Patient Areas


Non-patient system components must not be installed in the Patient Area.

WARNING! Maintain a 1.5 meter distance between the


patient and any non-patient equipment.
1.5m

10.0 Selenia Specification and Room Planning Checklist


The Selenia Specification and Room Planning Checklist (Appendix A), provides a checklist of all site
preparation steps which should be completed prior to receiving the Selenia System.

11.0 Room Layout Work Sheet


The Room Layout Work Sheet (Appendix A), is a template which can be used to facilitate establishing
a viable room layout. The steps that follow provide guidance when using this work sheet for site
planning.
1. Make copies of the grid and the Selenia System component cutouts. Cut out the grid and place it
on a suitable working surface. Note that each grid square is equal to 30 cm (1 ft).
2. Cut out the system components from the work sheet.
3. Outline the designated room size (to scale) on the grid.
4. Position the component cutouts to layout the desired work space.

P/N 9-600-0100 10
Site Planning and Pre-Installation Guide

12.0 Mounting Footprint

Figure 1-4: Gantry and Acquisition Workstation Mounting Footprints

13.0 Recommended Mounting Hardware (typical installation)


Gantry Minimum 1/2” x 3” long (M14 x 7.5 cm)
Acquisition Workstation Minimum 3/8” x 3” Long (M10 x 7.5 cm)

P/N 9-600-0100 11
Site Planning and Pre-Installation Guide

Appendix A

1.0 Selenia Room Planning Checklist


The Specification and Room Planning Checklist, provides a checklist of the important site preparation steps
which should be completed prior to receiving the Selenia.

Table 1: Selenia Specification and Room Planning Checklist


Room Size Required Actual Comments
Length 365 cm (12’)
Width 275 cm (9’)
Ceiling 228 cm (90”)
203 x 76 cm
Door
(80” x 30”)

Clearance Required Actual Comments


Acquisition Workstation 61 cm (2’) ea. side
Tubestand Rear 30 cm (1’)
Tubestand Front 76 cm (30”)
Work Area 76 cm (30”) dia.

Selenia System
Operating Required Actual Comments
Environment
Avg. Temp. 20° C to 30°C(68° F to 86° F)
Avg. Humidity 10% to 80%

Shielding Provided Required Comments


Operator Yes
Patient No
Room No

Cables Minimum Maximum Comments


Input Power
Acquisition Workstation
Power
Acquisition Workstation
Data
Ground Wire
Interlock

P/N 9-600-0100 12
Site Planning and Pre-Installation Guide

Mounting Room Requirements

Operator

Patient

Room

Interconnects Quantity Lengths Comments


Conduits
Wireways
Thresholds

Tubestand Required Actual Comments


Mains Voltage 200-240 VAC
<0.20 @ 208-240 V
Mains Impedance
<0.16 @ 200 V
Max. Line Current 35 Amps For 5 sec.

Acquisition
Required Actual Comments
Workstation
Input Line Voltage 100-240 VAC
3.5 Amps max. @ 100/120 VAC
Input Current
2.0 Amps max @ 220-240 VAC

Hardcopy Film
Required Actual Comments
Printing Devices
Power 90-250 VAC, 47-63 MHz
2.0 Amps @ 115 VAC
Operating Current
1.5 Amps @ 220 VAC

P/N 9-600-0100 13
Site Planning and Pre-Installation Guide

Table 2: Softcopy Workstation Specification and Room Planning checklist


SCW-Operating Environment Required Actual Comments
Operating Temperature 10° C to 35° C (50° F to 95°F)
Operating Relative Humidity 20 to 80% non condensing
Operating Elevation 0 ft to 10,000 ft

SCW—UPS, Domestic Required Actual Comments


88 to 148 VAC
Power (120 VAC nominal)
50/60 Hz ± 3 Hz (auto-sensing)

SCW—UPS, International Required Actual Comments


175 to 295 (230 VAC nominal)
Power
50/60 Hz + 3 Hz auto sensing

SCW—Computer Required Actual Comments


90 to 135 VAC at 50/60 Hz
Power
180 to 265 VAC at 50/60 Hz
10° C to 35° C (50° F to 95°F)(at
Operating Temperature 95°F the max operating altitude is
3,000 ft)
Operating Maximum 0.25 G at 3 Hz to 200 Hz at 0.5
Vibration octave/minute
Bottom half-sine pulse with a
Operating Maximum Shock
change in velocity of 20”/sec

SCW—Monitor Required Actual Comments


Power 100 to 240 VAC at 50/60 Hz
Operating Within Specifications 15° C to 30° C (59° F to 86°F)
On (180 watts) = 614 BTU
Thermal Dissipation Stand By (104 watts) = 355 BTU
Auto Power Off (6 watts) = 20 BTU

P/N 9-600-0100 14
Site Planning and Pre-Installation Guide

2.0 Cut Outs & Grid


Photocopy as needed. Cut out and place on grid (See next page.)

P/N 9-600-0100 15
Site Planning and Pre-Installation Guide

P/N 9-600-0100 16
Site Planning and Pre-Installation Guide

3.0 Seismic Requirements


3.1 Seismic Information for the Acquisition Workstation

P/N 9-600-0100 17
Site Planning and Pre-Installation Guide

3.2 Seismic Information for the Gantry

P/N 9-600-0100 18