Temporary Construction Facilities
TABLE OF CONTENTS
1. INTRODUCTION ............................................................................................................... 4
2. SUMMARY .......................................................................................................................... 4
6. APPENDICES...................................................................................................................... 6
Temporary Construction Facilities
1. INTRODUCTION
This report provides a summary of the evaluation of the proposals submitted by the bidders in response to
Material Requisition for ******
2. SUMMARY
No. of vendors are invited to bid and totally * vendors responded, submitted bid documents, and the status
is as followings.
Country
N MANUFACTUR Submitt
ID Vendor NAME of Remarks
O. ER / Bidder ed BID
Origins
Damma Yes
1 Zahid Tractor 10005612 CATERPILLAR
m No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Temporary Construction Facilities
Post Bid Clarifications were sent to bidders for evaluating deviations and clarifications raised along with
their technical bid.
The bids were evaluated based on the requirements stated in the Material Requisition and Project
Specifications and bidder’s responses on Post Bid Clarifications (PBC).
The bids were evaluated based on the requirements stated in the Material Requisition and Project
Specifications and bidder’s responses on Post Bid Clarifications (PBC).
3. SCOPE OF SUPPLY
Vendors scope includes manufacturing, testing and packing of (Material) for the in the requisition for
Material.
The design / manufacturing of the Materials shall be in accordance to all specifications, drawings,
procedures, standards and other documents attached with the MR Package and with the best modern
practice and shall be such to facilitate inspection, cleaning, maintenance and repair to ensure satisfactory
operation of the Materials under all service Conditions.
4. TECHNICAL ANALYSYS
During the evaluation process, numbers of clarifications were raised regarding the technical issues related
to the bids. The post bid clarifications exchanged with the bidders and their responses are attached as
Appendix-1, 2, 3.
The bids have been evaluated based on the requirements stated in the Material Requisition and Project
Specifications and bidder’s responses to the clarifications.
5. TECHNICAL RECOMMENDATION
Bid No. 2:
Bid No. 3:
Bidder mentioned a delivery time of --- after PIM & NMR-601 approval.
6. APPENDICES