Engineering and Central Maintenance Group

CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382

Test results:
Testing of Generator DG5, Breaker and
Potential Transformer
August 28-29, 2019

Prepared for:

SIPGC Plant
Calapan, Mindoro

Tested by: Verified by:

Kennah Sasamoto/Nelson Abas Julius A. Pangilinan


Test Engineer / Generator Testing Senior Test Engineer
and Repair Specialist

Approved by:

Eric D. Jabiniar
Plant Director
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382

EQUIPMENT SPECIFICATION Model SERIAL NO. DESIGNATION


Generator 2100 kW, 720 rpm, 60 Hz TFW630-10-10 None DG 5
Main Stator: 13.8 kV, 110 amps
Main Field: 86 Volts, 6.3 amps
Vacuum Circuit 17.5 kV, 1250 amps VD4 1712-31M 301435/1003/02 DG 5
Breaker
Potential Transformer Nameplate cannot be read DG 5

EXECUTIVE SUMMARY:

As part of the acceptance testing, these generators and accessories are tested in accordance to standard testing
procedure in order to evaluate its present condition and to establish benchmark for future assessments.

Base on the series of test conducted, all results were found to be satisfactory aside from the significant ipf tip up
results on stator which requires thorough reconditioning on the next planned shutdown.

Comprehensive diagnostic testing is highly recommended to monitor overall condition of the generator and
accessories.

Work Done:

 Visual inspection of Main stator, main field and exciters.


 Took as found details.
 Isolation of terminal leads before testing
 Ohmic reading on heater
 Diode check
 Capacitance check on Main stator
 Conduct the following testing on the following equipment.
a. Main stator
 Winding resistance test
 Insulation resistance test
 Polarization Index test
b. Main field
 Winding resistance test
 Insulation resistance test
 Polarization index test
 Impedance test
c. Stator and Rotor Exciter
 Winding resistance test
 Insulation resistance
 Dielectric Absorption ratio test
d. RTD
 Insulation resistance test
 Ohmic check
e. Vacuum circuit breaker
 Insulation resistance test
 Contact resistance test
f. Potential transformer
 Insulation resistance test
 Check continuity of potential transformer fuse.
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382

Test Results:

I. Stator Insulation Resistance and Polarization Index Test

Injected Voltage: 5000 VDC


Winding Temperature: 36 º C

PHASE A-G PHASE B-G PHASE C-G


MΩ MΩ MΩ

>5000 >5000 >5000

Test Equipment KYURITSU

Reference IEEE 43 – 2013, IEC 60034-27-4


Remarks/Evaluation Measured 1 minute insulation resistance is within acceptable limits.

If the Insulation resistance value is greater than 5000 Megohms, the


Polarization Index would not be meaningful and the PI test need not be
performed.

Results are satisfactory


Recommendation Trending of Insulation resistance and Polarization Index test is still
recommended to monitor the health of winding condition
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382

II. Stator Winding Resistance Test

Test Current: 10 Ampere


Winding Temperature: 36 º C

PHASE A PHASE B PHASE C

1.091 mΩ 1.048 mΩ 1.100 mΩ

Test Equipment Megger DLRO 10

Reference CSA C392 standard, IEC 60034-23


Remarks/Evaluation Measured winding resistance is within acceptable limits

Both reference standards recommends a limit of 1 % from the average


resistance value for form coil windings.

Results are satisfactory


Recommendation Trending of winding resistance test is still recommended to monitor high
resistance joints per phase and lead to lead.
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382

III. Stator Insulation Power Factor and Tip-up Test

Test voltage: 8000 V


Test Specimen: CH and CL (Individual winding to ground)

PHASE TEST CAPACITANCE % POWER POWER LOSS LEAKAGE TIP -UP


VOLTAGE (nF) FACTOR (Watts) CURRENT
(kV) (mA)
2 42.32 1.532 0.977 31.9
4 42.5 1.883 3.696 55.39
A 5 42.72 2.227 8.961 80.52 1.512
7 42.95 2.591 17.31 105.2
8 43.25 3.044 31.73 130.4

2 41.80 1.449 0.912 31.51


4 41.98 1.811 3.509 55.39
B 5 42.18 2.181 8.661 79.47 1.676
7 42.43 2.612 17.64 104
8 43.77 3.125 32.22 129

2 41.51 1.442 0.902 31.3


4 41.69 1.797 3.459 55.02
C 5 41.88 2.151 8.487 78.94 1.841
7 42.18 2.649 17.79 103.4
8 42.58 3.283 33.69 128.4

Test Equipment Teldar CDF12 KV

Reference IEEE 286 – 2000, IEC 60034-27-3-2015


Remarks/Evaluation Acceptance criteria for industry practice vary, but epoxy mica insulation
system often have an acceptance criteria of 0.5% to 1.0% maximum tip-up.
However, if the unit is free from dust, dirt and other contaminants or
additional system curing can sometimes improve results when the values are
outside the acceptance criteria.

Results are satisfactory


Recommendation Trending of winding ipf and tip-up test is still recommended to monitor the
health of the winding insulation condition.

Unit requires thorough reconditioning on the next planned shutdown.


Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382

IV. Main Rotor Field Insulation Resistance and Polarization Index Test

Injected Voltage: 500 VDC


Winding Temperature: 36 º C
Lead to Ground
(MΩ)

>5000

Test Equipment KYURITSU

Reference IEEE 43 – 2013, IEC 60034-27-4


Remarks/Evaluation Measured 1 minute insulation resistance is within acceptable limits.

If the Insulation resistance value is greater than 5000 Megohms, the


Polarization Index would not be meaningful and the PI test need not be
performed.

Results are satisfactory


Recommendation Trending of Insulation resistance and Polarization Index test is still
recommended to monitor the health of winding condition

V. Main Rotor Field Winding Resistance Test

Test Current: 10 Ampere


Winding Temperature: 36 º C

Lead 1 to Lead 2
(Ω)

3.63

Test Equipment Megger DLRO 10

Reference CSA C392 standard, IEC 60034-23


Remarks/Evaluation Compare value to OEM, This result also will be the benchmark for future
reference.

Results are satisfactory


Recommendation Trending of winding resistance test is still recommended to monitor high
resistance joints lead to lead.
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382

VI. Main Rotor Impedance Test

Injected Voltage: 120 V AC


Winding Temperature: 36 º C

TEST VOLTAGE ACTUAL VOLTAGE CURRENT IMPEDANCE


10 10.12 0.1 101.2
20 20.11 0.3 67.03
30 30.11 0.4 75.28
40 40.46 0.5 80.92
50 50.46 0.6 84.1
60 60.81 0.7 86.87
70 70.2 0.8 87.75
80 80.7 0.9 89.67
90 90.4 0.9 100.44
100 100.2 1.0 100.2
110 110.8 1.1 100.73
120 120.8 1.2 100.67

Test Equipment VARIABLE AC Source, Fluke DMM, Fluke Clamp Meter

Reference IEEE Std 62.2, EASA Std.


Remarks/Evaluation There was no presence of shorted turns appeared as the voltage is raised.

Very low impedance and high current indicates shorted turns is present

Results are satisfactory


Recommendation Trending of Impedance test is still recommended to monitor presence of
shorted turns in the field windings
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382

VII. Rotor Exciter Insulation Resistance and Dielectric AbsorptionTest

Injected Voltage: 500 VDC


Winding Temperature: 36 º C

Particular Line to Ground Test


30 sec (MΩ) >1000 MΩ
1 minute (MΩ) >1000 MΩ
Dielectric Absorption >1

Test Equipment KYURITSU

Reference IEEE 43 – 2013, IEC 60034-27-4


Remarks/Evaluation Measured 1 minute insulation resistance is within acceptable limits.

If the Insulation resistance value is greater than 5000 Megohms, the


Polarization Index would not be meaningful and the PI test need not be
performed.

Results are satisfactory


Recommendation Trending of Insulation resistance and Polarization Index test is still
recommended to monitor the health of winding condition

VIII. Exciter Rotor Winding Resistance Test

Test Current: 10 milli-Ampere


Winding Temperature: 36 º C

PHASE A PHASE B PHASE C

11.958 mΩ 11.571 mΩ 11.907 mΩ

Test Equipment Megger DLRO 10

Reference CSA C392 standard, IEC 60034-23


Remarks/Evaluation Measured winding resistance is within acceptable limits

Both reference standards recommends a limit of 1 % from the average


resistance value for form coil windings.

Results are satisfactory


Recommendation Trending of winding resistance test is still recommended to monitor high
resistance joints per phase and lead to lead.
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382

IX. Stator Exciter Insulation Resistance and Dielectric AbsorptionTest

Injected Voltage: 500 VDC


Winding Temperature: 36 º C

Particular Line to Ground Test


30 sec (MΩ) >1000 MΩ
1 minute (MΩ) >1000 MΩ
Dielectric Absorption >1

Test Equipment KYURITSU

Reference IEEE 43 – 2013, IEC 60034-27-4


Remarks/Evaluation Measured 1 minute insulation resistance is within acceptable limits.

If the Insulation resistance value is greater than 5000 Megohms, the


Polarization Index would not be meaningful and the PI test need not be
performed.

Results are satisfactory


Recommendation Trending of Insulation resistance and Polarization Index test is still
recommended to monitor the health of winding condition

X. Stator Exciter Winding Resistance Test

Test Current: 10 Ampere


Winding Temperature: 36 º C

Lead 1 to Lead 2
(Ω)

9.829

Test Equipment Megger DLRO 10

Reference CSA C392 standard, IEC 60034-23


Remarks/Evaluation Compare value to OEM, This result also will be the benchmark for future
reference.

Results are satisfactory


Recommendation Trending of winding resistance test is still recommended to monitor high
resistance joints lead to lead.
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382
XI. RTD Test

Particular Reading (Ω) Insulation Resistance (MΩ)


@ 500 VDC
RTD 1 113.9 > 100
RTD 2 114.2 > 100
RTD 3 113.8 > 100
RTD 4 114.0 > 100
RTD 5 113.5 > 100
RTD 6 113.2 > 100

Remarks/Evaluation Measured resistance and calculated equivalent temperatures are within


acceptable range.

All RTD’s are in Good Condition


Recommendation Trending of resistance test value is still recommended to monitor condition of
winding temperature detectors

XII. Diode Test

Particular Forward Bias Reverse Bias


(VDC) (VDC)
Diode 1 0.382
Diode 2 0.382
Diode 3 0.382
Diode 4 0.382
Diode 5 0.382
Diode 6 0.382
Diode 7 0.382
Diode 8 0.382
Diode 9 0.382
Diode 10 0.382
Diode 11 0.382
Diode 12 0.382

Remarks/Evaluation The forward voltage obtain on each diodes are within acceptable range.

All Diodes are in Good Condition


Recommendation Diodes shall be tested every time the unit is scheduled for shutdown
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382

XIII. Vacuum Circuit Breaker Test

Contact Resistance Test

L1-L1’ L2-L2’ L3-L3’


(µΩ) (µΩ) (µΩ)
128.1 153.5 138.6

Test Equipment Megger DLRO 10

Reference ANSI/NETA-MTS
Remarks/Evaluation Does not exceed high level of normal range as indicated in the
manufacturer’s data or the values does not deviate 50% of the lowest values

Results are satisfactory


Recommendation Trending of resistance test and comprehensive test is still recommended to
monitor health condition of the breaker.

Insulation Resistance Test

Breaker Status Test Mode


L1-L2 L2-L3 L3-L1
Close >1 T Ω >1 T Ω >1 T Ω
L1-G L2-G L3-G
>1 T Ω >1 T Ω >1 T Ω
L1-L1’ L2-L2’ L3-L3’
Open >1 T Ω >1 T Ω >1 T Ω

Test Equipment KYURITSU

Reference ANSI/NETA-MTS
Remarks/Evaluation Table 100.1 from the reference standard shows that the results are within
acceptable tolerance

Results are satisfactory


Recommendation Trending of insulation resistance test and comprehensive test is still
recommended to monitor health condition of the breaker.
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382

XIV. Potential Transformer Insulation Resistance Test

Particular HV-LV HV-G LV-G

Core1/Core2 >100 MΩ

Core1 >100 MΩ >100 MΩ

Core2 >100 MΩ >100 MΩ

Test Equipment KYURITSU

Reference ANSI/NETA-MTS
Remarks/Evaluation Table 100.1 from the reference standard shows that the results are within
acceptable tolerance

Results are satisfactory


Recommendation Trending of insulation resistance test and comprehensive test is still
recommended to monitor health condition of the breaker.
Engineering and Central Maintenance Group
CENPRI Plant Site: Prk. San Jose, Brgy. Calumangan Bago city, Negros Occ.
Tel No.: 476-7382