HTSS & Utility-02 Jindal Steel & Power Limited

(Occupational Health & Safety Department)


Rev. 00
Job Safety Analysis
December 2018

Attachment

Format: Job Safety Analysis (JSA)


JSA Ref No: HTSS & utility- 02 Rev No: 00 Date:

Unit:SMS Plant: SMS Section: HTSS & UTILITY

Description of Activity: Cable Joint & Termination Work

S.No. Job Activity Step Hazards/Risk Safety Control Measures


1 Take General safety work General safety Skilled person should be on side & correct manual
permit handling techniques. Use PPES & work should be
safe trained on safe work practices
2 Take isolation permit Electrical Isolation permit prevent from any hazardous
electrical accident due to energizetion
3 Opening of Feeder Panel Electrical Test cables with approved test equipment o ensure
door that cables are electrically dead .implement he lock
out procedure to be implement only by authorized
persons and singed off in the sub-station permit
book.
4 Work on the VCU Electrical Before starting of the work the voltage of the VCU
should be properly isolated.
5 Work at height Fall from height. Lift Ensure 100% tie off tools .cable management to be
failure. Personnel places properly .Authorized person is allowed. Use
injury full body harness.

Prepared By:

Name: ___________________ Designation: _________________ Signature: ___________ Date: ___________

Reviewed By:

Name: ___________________ Designation: _________________ Signature: ___________ Date: ___________

Approved By:

Name: ___________________ Designation: _________________ Signature: ___________ Date: _________

OHSM-02.03 Rev 00 / December 2018 Page 1 of 2


OHSM-02.00 Rev 00 / December 2018 Page 2 of 2