Calculation Examples
BSW Example
Assume a fluid flow rate of 20 bbl/day, a 10% BSW, and a 0% shrinkage. The oil and water production is
calculated as follows:
file://C:\Users\s\AppData\Local\Temp\~hh56B4.htm 23/11/2014
Calcexamples Page 2 of 4
Condensate Example
Assume a HP condensate rate of 20 bbl/day and shrinkage of 8%. The LP Condensate Rate is calculated as
follows:
CGR Example
The test rates for a particular time of the test are as follows:
GOR Example
The test rates for a particular point in time during the test are as follows:
file://C:\Users\s\AppData\Local\Temp\~hh56B4.htm 23/11/2014
Calcexamples Page 3 of 4
WGR Example
The test rates for a particular time of the test are as follows:
The operator chose to exclude Water Meter #2, therefore only three meters are included in the totals. (Water
Meter #2 was not included, so its rate is not part of the WGR calculation).
WGR
= 16 bbl/day / (4.99 + 1.73) MMscf/day
= 2.38 bbl / MMscf
If Water Meter #2 had been selected to be Included in Totals:
WGR
= (16 + 6) / (4.99 + 1.73)
= 3.27 bbl/MMscf
WOR Example
The test rates for a particular point in time during the test are as follows:
file://C:\Users\s\AppData\Local\Temp\~hh56B4.htm 23/11/2014
Calcexamples Page 4 of 4
file://C:\Users\s\AppData\Local\Temp\~hh56B4.htm 23/11/2014