GC3 – The Health and Safety Practical Application

Candidate and course provider declarations:

For completion by the candidate:

I declare that the work submitted for this practical application assessment i.e. the completed
observation sheets and the report to management, is my own work. I recognise that
contravention of this statement constitutes malpractice and may result in my being subject to
the penalties set out in the NEBOSH Malpractice policy.

Name (Print) VIGNESH RAJAN BALASUBRAMANIAN

Signature

Date

For completion by a course provider representative (e.g.internal practical assessor):

I declare that the work marked is identical to that received from the candidate. I recognise
that contravention of this statement constitutes malpractice and may result in my being
subject to the penalties set out in the NEBOSH Malpractice policy.

Name (Print) _________________________________

Signature _________________________________

Date _________________________________

For completion by the course provider’s internal practical assessor:

I declare that I have marked this work and am both qualified and approved by NEBOSH to
do so. I recognise that contravention of this statement constitutes malpractice and may result
in my being subject to the penalties set out in the NEBOSH Malpractice policy.

Name (Print) _________________________________

Signature _________________________________

Date _________________________________
NB: This declaration must be completed in full submitted and retained with the
candidate’s script. If this declaration is not submitted the candidate’s result may be
declared void.

INTERNATIONAL GENERAL
CERTIFICATE Assessor’s marking sheet

GC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Date of practical application (Write the Date of GC2 Examination)Name of assessor:

Course provider Course provider


number name

Student Number 0399932 Student name VIGNESH RAJAN BALASUBRAMANIAN

Maximum Assessor’s NEBOSH


marks marks moderated
Criteria marks
available awarded

1 Completion of observation sheets

1.1 Range and outline of hazards and consequences 15

Identification of suitable control measures and


1.2 15
timescales

2 Report - Introduction and Executive Summary

Introduction providing an overview of the chosen


2.1 5
area

2.2 Executive summary 5

3 Report - Main findings of the inspection

3.1 Quality of interpretation of findings 15

Identification of possible breaches of international


3.2 5
standards

3.3 Persuasiveness / conciseness / technical content 10

4 Report - Conclusions and Recommendations


Outcome: PASS (60% or more) REFER (less than 60%)

Date assessed ____ / ____ / ____

Assessor’s signature ______________________

Date received by course provider ____ / ____ / ____

Date received by NEBOSH


(if applicable) _____ / _____ / _____
Clear and concise conclusions which are clearly
4.1 related to report findings and are effective in 15
convincing management to take action

Recommendations which present realistic actions to


4.2 15
improve health and safety in the chosen area

TOTAL MARKS 100

Grades:

Assessor’s additional comments on the practical application:

ASSESSED BY (name in block letters) ________________________________________________________

The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested.

NEBOSH USE ONLY


NEBOSH Moderator’s comments:

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet Number : 01

Student Name VIGNESH RAJAN BALASUBRAMANIAN Student Number : 0399932

Place Inspected SHAPOORJI PALLONJI Date Of Inspection :

OBSERVATION CONTROL MEASURE TIME SCALE


1.FIRE EXTINGUISHER IMMEDIATE

Found some of the extinguisher are Inform the site HSE manager and ONE DAY
not properly updated and inspected supervisor. Perform visual inpection.
at time. Separate the used extinguisher, unused
extinguisher, need to be inspected.
Extinguisher is been used after the
expiration date. Develop proper procedure to maintain ONE MONTH
Unable to use at any emergency defending agents.
purpose. Use proper checklist to do the
inspection.
Record should be maintain.
2.DRINKING WATER IMMEDIATE

Drinking water at workplace is Identify water source ONE DAY


limited and time based frame. Using proper signage for drinking
No proper maintance of drinking water placed areas.
water and supplying of water.
No proper inspection of drinking MEDIUM TERM
water quality. Check for water quality with simple ONE WEAK
Risk of dehydration due to heat and sampling.
high temperature
LONG TERM
Periodic inspection should be done.
Proper maintance and servicing. ONE MONTH
Proper filtering system at the source of
drinking water

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet Number : 02

Student Name VIGNESH RAJAN BALASUBRAMANIAN Student Number : 0399932

Place Inspected SHAPOORJI PALLONJI Date Of Inspection :

OBSERVATION CONTROL MEASURE TIME SCALE


3.TOILETS IMMEDIATE

Found toilets are in bad condition. Inform to maintance department at ONE HOUR
Cigarette buds present inside the work site.
toilets. Checking the cleaning log records.
Water pounding with potential to Isolate the toilets from the worker
breeding of mosquitos. use.
Hygiene is related to risk
Environemental causing hazard. LONG TERM

Develop and impelement cleaning 1 WEAK


procedure.
Perform regular schedule for
cleaning
Perform schedule for sweage water
disposing.
4. LACK OF REST ROOM MEDIUM TERM
FACILITY
Provide a rest area probably with
There is no proper relaxation room power supply, purified drinking
ONE MONTH
with purified drinking water and water, toilets, adequate ventilation
toilet facility. and adequate lighting.

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet Number : 03

Student Name VIGNESH RAJAN BALASUBRAMANIAN Student Number : 0399932

Place Inspected SHAPOORJI PALLONJI Date Of Inspection :

OBSERVATION CONTROL MEASURE TIME SCALE


5.POSITION OF THE CRANE IMMEDIATE ONE DAY

The outrigger of crane rest ini Stop the work till the surface is leveled.
uneven surface. So to can occur
of causing injury to operator, SHORT TERM
unloading worker. Inspected the crane before use. ONE WEAK
Placing equipment if the soil is stable as
per specification mentioned by
manufacture.

6.CRANE OPERATOR IMMEDIATE

Manual signaling to crane driver Giving signal to operator should be visible 10 MINUTES
for lifting and moving operation from the ground.
is not properly carried out.

This may cause


miscommunication between the Training should be given to employer for
driver and crane operator which crane signaling procedure by an competent
ONE MONTH
may lead to damage of material person in workplace.
and accident may occur.

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet Number : 04

Student Name VIGNESH RAJAN BALASUBRAMANIAN Student Number : 0399932

Place Inspected SHAPOORJI PALLONJI Date Of Inspection :

OBSERVATION CONTROL MEASURE TIME SCALE


7.MOBILE CARNE LIFT IMMEDIATE

During the operation of Using barricade and warning signage. IMMEDIATE


mobile crane there is no Isolate the area where the lift operation is
barricade and warning signage taking place.
kept in the workplace for Block the routes at safe distance.
pedestrian
MEDIUM TERM
Load may fall due to failure of Provide awareness training to employee.
lifting aid and it might lead to ONE WEAK
Improvise current procedure lifting.
serious damage or physical
injury. Monitored by competent person
ON GOING

8. MOBILE IMMEDIATE
SCAFFOLDING
Place the guard rill in the scaffolding. ONE DAY
No inspected tag was Inspected the mobile scaffold before
presented. using.
No guard rill was been fit. The Prepare proper checklist for inspection
scaffolding platform is
damaged is not good to use. SHORT TERM
Wheels lock are not maintain Inspecting on regular basis.
as per standard. Prepare proper inspection checklist
Check the wheels lock and guard rill ONE WEAK
At regular intervals.

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet Number : 05

Student Name VIGNESH RAJAN BALASUBRAMANIAN Student Number : 0399932

Place Inspected SHAPOORJI PALLONJI Date Of Inspection :


OBSERVATION CONTROL MEASURE TIME SCALE

9. SCAFFOLD PLATFORM IMMEDIATE

Scaffold platform and scaffold Replace the damage platform. ONE DAY
tag is not inspected on time of Inpected the scaffold by a competent
before using it. Some working scaffold certified person.
platform are been damaged.
LONG TERM
Risk of working at height on
the damaged platform. Develop proper checklist for inspection.
ONE MONTH
Need to be inspected in regular basis and
record to be maintain properly.

10.ELECTRIC CABELS IMMEDIATE

Cables are left in the floor at Stop the work. ONE DAY
the walkways. Remove the sockets of the cable and run
Risk is trip and fall hazard. the cable.
Secure the overhead cable tie.

MEDIUM TERM

Provide temporary cable overhear tray.


Provide warning boards and signage. ONE WEAK
Supervision by competent person.

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet Number : 06

Student Name VIGNESH RAJAN BALASUBRAMANIAN Student Number : 0399932

Place Inspected SHAPOORJI PALLONJI Date Of Inspection :


OBSERVATION CONTROL MEASURE TIME SCALE

11.WELDING SPARK IMMEEDIATE

Spark was pouring from the top Provide proper fire blanket to cover ONE DAY
to ground while a welder on the the holes in platform from preventing
job on a beam and some worker spark reaching ground.
are below platform.
LONG TERM
Fire hazard and injury may be ONE WEAK
happened. Provide awareness training.
Keep more fire blankets at storages.
Keep the blanket at designated place
to easy use.
Inspected the blanket regularly. ONE MONTH
12.VEHICLE MOVEMENT IMMEDIATE

During vehicle movement at Advice driver to use horn to create 10 MINUTES


site. attention. Check the driver is
A heavy load truck almost hit a competency and having proper valid
pedestrian while reversing.
licence.
Driver never notice the
pedestrian was passing by the LONG TERM
way and pedestrian also not provide separate route for vehicle and
notice truck reversing due to pedestrian.Installing barricade and
2 MONTHS
heavy noise surrounding signage boards. Banksmen placed to
Risk of collision with monitor the traffic from outside of the
pedestrian and vehicle. vehicle.Provide spot mirrors at corner
and speed humps to control the speed.

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet Number : 07

Student Name VIGNESH RAJAN BALASUBRAMANIAN Student Number : 0399932

Place Inspected SHAPOORJI PALLONJI Date Of Inspection :


OBSERVATION CONTROL MEASURE TIME SCALE

13.PAINTER IMMEDIATE

Found painter uses solvent Stop the work. IMMEDIATE


thinner at the module of Inform the site supervisor to change.
drinking water bottles with no Remove the drinking bottles used.
labeling. Ask to the supervisor to check whether
It is warm to other on the on use anyone is using same method at work
of the chemical substance. site.
Risk drinking of thinner may be
misjudging as drinking water. MEDIUM TERM
provide proper container and labeld.
Proper labeling and identification to
bee visible clearly. ONE WEAK
Develop safe system of work.
Berif worker on tool box.

LONG TERM
Awarness training on proper thinner.
Risk present in the solvent. ONE MONTH
Supervision by competent person

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet Number : 08

Student Name VIGNESH RAJAN BALASUBRAMANIAN Student Number : 0399932

Place Inspected SHAPOORJI PALLONJI Date Of Inspection :


OBSERVATION CONTROL MEASURE TIME SCALE

14. TOOL BOX TALK

Observed supervisor involvement and


conducting daily tool box meeting for
institing the hazards and safety issue Supervisor ensure before the tool box
and matter in work site. meet whether all the worker have
10 MINUTES
Discussing the job hazard been assembled to the area on time.
Prompoting importance of PPE during
work.
Sharing safety slogan.
Safe system of work practice.

15. CARPENTER IMMEDIATE

No proper guarding equipment is been Stop the work. IMMEDIATE


used for the cutting purpose. Remove the machine connection.
Machinery connecting wire are been Isolate the machinery.
fully worst in condition where it may
cause electric shock to the employee SHORT TERM
using.
Give proper training to worker
ONE WEAK
Instruct to wear appropriate PPE.

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet Number : 09

Student Name VIGNESH RAJAN BALASUBRAMANIAN Student Number : 0399932

Place Inspected SHAPOORJI PALLONJI Date Of Inspection :


OBSERVATION CONTROL MEASURE TIME SCALE

16.STORAGE TANK AT TOP IMMEDIATE

No manhole guard provided at Safety harness arrangement should be IMMEDIATE


the top of storage tank. provided.
It cause falling of worker into Fire fighting and Recue team should be
storage tank during filling. present at spot of workplace.

SHORT TERM
Guard rill should be arranged around the
ONE WEAK
manhole for the entry.

17.WORKING AT HEIGHT Providing Safety Ladder and Personal fall IMMEDIATE


arrestor system
The load man has to climb on the
trailer to receive the material and
to remove the sling. Risk of Training to work at height and Safe
falling down will cause fracture System Of Work on how to work on 1 MONTH
or head injury. heights.

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet Number : 10

Student Name VIGNESH RAJAN BALASUBRAMANIAN Student Number : 0399932

Place Inspected SHAPOORJI PALLONJI Date Of Inspection :


OBSERVATION CONTROL MEASURE TIME SCALE

18.SPARK ARRESTOR Enforce the use of spark arrestor 10 MINUTES


It is not provided in vehicle and rules of not allowing the
entering the diesel yard. vehicle without spark arrestor.
Risk of fire due to spark
produced from silencer. Train and supervise the driver to
use the spark arrestor. REGULAR

19.NO SAFETY SIGN BOARDS

No signboards on Emergency stop Provision of signboards.


button and workers are un aware of IMMEDIATE
its usage. Providing information, instruction
It may leads to severe accident to TWO WEEKS
to workers on the usage of
workers. Emergency stop button

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet Number : 11

Student Name VIGNESH RAJAN BALASUBRAMANIAN Student Number : 0399932

Place Inspected SHAPOORJI PALLONJI Date Of Inspection :


OBSERVATION CONTROL MEASURE TIME SCALE

20.SCAFFOLD ERECTION

Whenever erection of To ensure systematic routing working


scaffolding on progress, schedule be arranged to those
ONE WEAK
employees exposed to hot employee exposed to heat continusly.
weather climate. In such
situation, employee will be Provide portable water dispenser arc
dehydrated. each portion of working site.

21.WELDING WORK

When ever the welding work To ensure the Proper PPE’s are been
taking place the work place used.
To ensure the work permit before IMMEDIATE
should be clean.
Fire catching material should work starting
be removed from the place or Prepare proper inspection checklist for
cover by blankets. welding work.

22. PEDESTRIAN AREA


Pedestrain area should be Signage and marking should be placed IMMEDIATE
separate in workplace with at appropriate areas.
covered by safety net or trench
box which will safe from To ensure the pedestrian safety ONE WEAK
falling object.

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet Number : 12

Student Name VIGNESH RAJAN BALASUBRAMANIAN Student Number : 0399932

Place Inspected SHAPOORJI PALLONJI Date Of Inspection :

OBSERVATION CONTROL MEASURE TIME SCALE


23.SAFETY HOOK IN SHORT TERM
SCAFFOLDING
Placement of scaffolds body Hook body harness at correct FIVE DAYS
harness hook at wrong anchor anchor point with proper lifeline.
point, especially during conducting Observed by a competent person
work at height and safety officers.
Can cause accident, serious injury.

24.SPILLAGE IN POWER IMMEDIATE


ROOM Use temporary drip tray to collect
Found diesel spillage in the ground the fuel.
after refueling to generator for Buddy system to monitor the ONE DAY
power. refueling.

LONG TERM
Visual inspection on fuel filling.
ONE MONTH
Inspection using proper checklist.

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet Number : 13

Student Name VIGNESH RAJAN BALASUBRAMANIAN Student Number : 0399932

Place Inspected SHAPOORJI PALLONJI Date Of Inspection :

OBSERVATIONS CONTROL MEASURES TIMESCALE

1. THIRD PARTY CERTIFICATE


All the machineries, tools and tackles are
inspected and certified by Third party Good practice CONTINUOUS
agencies and the records are maintained
properly.

2.MANAGEMENT COMMITMENT
TOWARDS SAFETY
The management has given a top level
priority to safety. There exists a good Good practice CONTINUOUS
line of communication, good safety
culture and even sub-contractors were
aware of SSOW and Safety policy of the
organization.

3. SAFETY OF VISITORS
There is restricted entry for visitors and
if there is a need for any visitor to enter
the work place they are escorted safely Good practice CONTINUOUS
and are prevented from entering the
lifting area and truck and they are
provided with proper PPE.

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet Number : 14

Student Name VIGNESH RAJAN BALASUBRAMANIAN Student Number : 0399932

Place Inspected SHAPOORJI PALLONJI Date Of Inspection :

--------------------------------------------------------------------------------------------------------------------------------------
Introduction including overview of area inspected and activities taking place

Name of the Company: SHAPOORJI PALLONJI CONSTRUCTION

Nature of Business:
The Shapoorji Pallonji is an Indian business conglomerate in India construction
company. The oldest Indian construction company with legacy of 150 years. The first Indian
construction company in middle east in 1970’s. company had been participated in ISO 9001
certification across all projects.

Date and time of Inspection:

Number of employees: 60,000 (2015-16).

Inspection team:

Inspection team consists of one internal auditor, HSE officer, senior manager of site
and 2 safety stewards provided by the company.

Details of inspection:

A complete inspection was carried out at the work area to understand the nature of
work and to identify the hazards in the work place.

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number of

Student name VIGNESH RAJAN BALASUBRAMANIAN Student number 0399932

Place inspected SHAPOORJI PALLONJI Date of inspection

----------------------------------------------------------------------------------------------------------------

Visual observation:
The extraction work contains hot work process which was examined and understood and
the hazards are identified in the department by using the following internal and external
source of information.

 Checking of Permit to Work system


 Checking of tool box talk records.
 Checking of Safe system of work
 Near miss report
 Incident report
 Checking of maintenance reports
 Checking equipment records.
 Previous Audit reports.
 Interviews with contract workers, trailer drivers, helpers, crane operators, pedestrian.
etc.,
 Inspection of tools and tackles and equipments in the site.
 Safety committee meeting report.
 Complaints from workers.
 Questions to employees.

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number of _____

Student name VIGNESH RAJAN BALASUBRAMANIAN Student number 0399932

Place inspected SHAPOORJI PALLONJI Date of inspection

----------------------------------------------------------------------------------------------------------------

EXECUTIVE SUMMARY
This organization the management decided to have zero incident /near miss/accident
at the site. We formed a team to visited all critical operations in work place and the system of
working methods. The specified area as a process to have zero incident rate /near miss and
accident in the work site. The following studies were made to identify the hazards in the site,
Risk assessment to be taken, to formulate risk controls and to give an estimate for controlling
the risk. During our visit to site, there where good practice and positive aspects maintained at
the working place.

 The safety policy was displayed properly in the entire place.


 Presence of Positive safety culture in the organization.
 Everyone knows their roles and responsibilities.
 The Employees are aware of the safe system of work and practice.
 The contract workers were also aware of the method statement and safety policy of
the organization.
 There is a proper line of communication.
 public was not allowed at the risk areas.

Apart from the above there were also some of the critical observation found during this
studies, the same has been brought to the notice to the management as if that is not controlled
then it will end up to accident by which the entire Fabrication process may stop due to which
organization may leads to prosecution notices, increase of insurance premiums, financial loss
business loss and will face the legal problems etc.,

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number of _____

Student name VIGNESH RAJAN BALASUBRAMANIAN Student number 0399932

Place inspected SHAPOORJI PALLONJI Date of inspection

----------------------------------------------------------------------------------------------------------------
 Evacuation procedure and fire mock drill, Trainings on safety.

 Periodic inspection and maintenance of Cranes and equipments like tools and tackles.

 Training on crane signaling to be provided for unloading team persons.

 Leveled and good ground surface on the location where the crane placed for
unloading.

 Pedestrian walkway pavement.


These activities have to be considered on high level of priorities. Necessary control
measures have to be taken at earlier to avoid any major accidents at work site.

MAIN FINDINGS WHILE AT INSPECTION :

1. Signaling to crane: During lifting and lowering operation of the crane, proper signaling to
crane operator was made by the banksman at the ground level.
Problem Occured
 Visibility of the signal is not clear,
 Miss Communication may leads to injury and even fatality

Immediate Control Measure


 Stop the work.

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number of

Student name VIGNESH RAJAN BALASUBRAMANIAN Student number 0399932

Place inspected SHAPOORJI PALLONJI Date of inspection

----------------------------------------------------------------------------------------------------------------
Recommendations:

There are some common precautions to be taken to avoid wrong signal


communication. And they are as follows:
 High visibility clothing to signal man.
 Training on crane signals.
 Competent person for crane operation
 Proper communication arrangements to operator and banks man.

Justify :

If the signal is not given correctly or the operator misunderstood the signal
then there must be a serious accident, damage of raw materials, injury to head, hand
and fatality which results in legal process, loss to property, delay in work, financial
loss, and poor corporate image.
This is against the law of “LIFTING OPERATION & LIFTING EQUIPMENT
REGULATION (LOLER) 1998, ISBN 978 07176 2464 V5. APPROVED CODE OF
PRACTICE & GUIDANCE L113 (LOLER ACOP)”

2. Provision for scaffolding: There exist more chance for entrapment of people on
scaffolding therefore it is essential to have guarding arrangements especially on platform of
scaffolding.
Consequences:
 Entrapment of workers.
 Severe injury to the workers
 Fatality

Immediate Control measures:


 Restricting the workers movements in height work take place in scaffold.

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number of

Student name VIGNESH RAJAN BALASUBRAMANIAN Student number 0399932

Place inspected SHAPOORJI PALLONJI Date of inspection

----------------------------------------------------------------------------------------------------------------

Recommendations:
 Provisions of suitable guarding system.
 Regular maintenance and follow up.
Justification:
If the guarding systems are not installed properly on the scaffolding, then there
might be a more chance for workers entrapment on to fall from height which may
result severe bodily injury and even fatal. And finally results in production loss,
public issues, financial loss, and loss of reputation and legal compliances.

 According to ILO R164 Occupational Safety and Health


Recommendation,1981
 Article 10(a) it is the responsibility of the employer to provide the safe work
equipment.
 According to ILO R164 Occupational Safety and Health Recommendation,
1981 Article 10(b) it is the responsibility of the employer to provide the proper
training.

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number of

Student name VIGNESH RAJAN BALASUBRAMANIAN Student number 0399932

Place inspected SHAPOORJI PALLONJI Date of inspection

----------------------------------------------------------------------------------------------------------------

3. Welfare: Provision of adequate welfare facilities for the outdoor workers and a relaxing
room at a suitable distance from the working site.
Consequences:
 Stress at work, work tension and psychological disorders
 Negative safety culture
 Health related problems
 Morality loss of the workers
 Workers tend to behave abnormally.
Recommendations:
 Relaxation room with proper ventilation and sitting arrangements.
 Provision of pantry for refreshment.
 Purified water and toilet facilities
 Proper Communication systems
Justification:
The employees should be provided with necessary basic welfare facilities in
the workplace by the employers otherwise it will results in slow down of work
process ,stress of people ,health issues , physical abuse, violence, misbehaviors,
slowdown of business, financial loss, and loss of reputation.
“THE HEALTH AND SAFETY WORK ACT – 1974, HSWA, MANGEMENT
OF HEALTH AND SAFETY OF WORK REGULATION MHSW, COSHH, NAWR,
IR, CAW, and CLAW”.

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number of

Student name VIGNESH RAJAN BALASUBRAMANIAN Student number 0399932

Place inspected SHAPOORJI PALLONJI Date of inspection

----------------------------------------------------------------------------------------------------------------
5. Number of Fire Extinguishers: Sufficient Number of fire extinguishers must be provided
in work place with good working condition.
Consequences:
 Incapable to mitigate the small fire in the work place.
 Injuries and Fatality to workers.
 Building Damage.
Immediate Control Measure
 Replace the damaged fire extinguishers to the work place.
Recommendations:
 Install sufficient number of fire extinguishers.
 Proper extinguishers types in proper place.
 Sign boards and periodic inspection.
 Proper training has to be given on how to use the fire extinguisher.
Justification:
The employer should be compulsory provided the sufficient number of fire
extinguishers with suitable classes of extinguishers according to the work place. If it
is not followed properly this may lead to incapability in mitigating a small fires,
equipment damage, and fatality resulting in public issues, financial loss, loss of
reputation and legal compliances.
THIS IS AGINST THE “ FIRE EXTINGUISHERS –BS5306 PROVISIONS”
( REGULATION – 3 )AND FROM “ THE FIRE PRECAUTIONS ACT 1971”

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number of

Student name VIGNESH RAJAN BALASUBRAMANIAN Student number 0399932

Place inspected SHAPOORJI PALLONJI Date of inspection

----------------------------------------------------------------------------------------------------------------
4. Fire:
There is open fire seen due to accumulation of diesel stained rags and the static spark may
cause the fire to spread to the chemical storage room which may cause damages to vehicles
and serious injuries to workers
Consequences:
 Fire explosion
 Servere injuries to the workers
 Burning to worker
 Damage to moving vehicle
Recommendation :
 Proper disposal of diesel stained rags and following good housekeeping
 Providing good earthing system
 Adequate number of extinguisher according to work nature
 Providing proper fire fighting equipment
 Putting signage and warning boards clearly in work site
Justification:
Fire is the most serious hazards that causes chain of accident that may lead to injury to
worker, damage to equipment, increased insurance premium, delay in work, man
power replacement, training cost, financial loss and loss of business reputation.

APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet Number of

Student name VIGNESH RAJAN BALASUBRAMANIAN Student Number 0399932

Place inspected SHAPOORJI PALLONJI Date of Inspection

----------------------------------------------------------------------------------------------------------------

CONCULSION :

The inspection was been carried out at shapoorji pallonji construction site it was been
identified various proper good and usage condition. The unsafe observation and risk, hazard
are been documented. Based on the priority and hazard mentioned various corrective action
have been taken and suggested to the organisation to be followed.
To avoid legal action by the enforcement authority or agency, financial loss due to
direct loss and indirect loss, fuhter more motivating the worker and employer to give
importance to the health and safety to be safe system of work.
Finally the report will be keep aware of management of wheatstone project on
potential arises of any concern at site. All concern have been rectified and improved for long
term solution by reference the recommendation are been provided.

SIGNED Dated
( VIGNESH RAJAN BALASUBRAMANIAN )