TOP SOIL TO BE STORED SEPARATELY 2. THE TRENCH WIDTH W FOR THE PIPELINE IS DEFINED IN THE PROJECT
PA
C A EN
YM AT
TIO INE
SPECIFICATION.
EX
0.15m
FERTILE SOIL TO BE STORED SEPARATELY
VA T L
PA CAV
N
TOP SOIL TO BE STORED SEPARATELY
TIO INE
EX
FERTILE SOIL TO BE STORED SEPARATELY 3. REFER TO LONG SECTION DRAWINGS FOR DEPTH OF COVER OVER THE PIPE.
N
EXCAVATION
SOFT/LOOSE
0.65m
0.65m
EXCAVATED AND STORED SEPARATELY AND REINSTATED IN THE SAME POSITION
UPON BACKFILLING OF THE PIPE TRENCH.
SOFT/LOOSE EXCAVATION
5. SOFT EXCAVATION BETWEEN 150mm AND 800mm DEPTH IS REGARDED AS FERTILE
SOIL AND SHALL BE EXCAVATED AND STORED SEPARATELY AND REINSTATED IN THE
EXCAVATION
SAFE EXCAVATION
SAME POSITION UPON BACKFILLING OF THE PIPE TRENCH.
SAFE
6. REFER TO PROJECT SPECIFICATIONS FOR THE CLASSIFICATION OF SOFT AND HARD
EXCAVATION.
7. SOFT EXCAVATION TO BE REUSED MAY BE STORED ALONG THE TRENCH INSIDE THE
CONSTRUCTION SERVITUDE WHERE THERE IS SUFFICIENT SPACE AVAILABLE. REFER
TO PROPOSED TYPICAL SERVITUDE DRAWINGS.
15. THE THICKNESSES OF THE TOP SOIL AND FERTILE SOIL ARE NOMINALLY AS
INDICATED ON THIS DRAWING, BUT VARIES ALONG THE PIPELINE.
LEGEND:
(*2) NOTE REFERENCE
EXCAVATION PAYMENT LINE
SAFE SLOPE EXCAVATION LINE
Ɵ Ɵ
PAYMENT LINE
PAYMENT LINE
ø ø
EXCAVATION
EXCAVATION
TL N
INE
EX YM
EN IO
PA
CA EN
YM AT
TL N
INE
EX YM
EN IO
0.15m
VA T L
PA CAV
PA
TOP SOIL TO BE STORED SEPARATELY
CA EN
YM AT
TIO INE
0.15m
VA T L
PA CAV
EX
TIO INE
EX
FERTILE SOIL TO BE STORED SEPARATELY
N
0.65m
EXCAVATION
SOFT/LOOSE
0.65m
SOFT/LOOSE EXCAVATION5.24m
SAFE EXCAVATION
ADDITIONAL EXCAVATION TO SUIT MIN. 600mm MIN. 600mm ADDITIONAL EXCAVATION TO SUIT
CONTRACTORS EXCAVATION PLANT CONTRACTORS EXCAVATION PLANT
SAFE EXCAVATION