NYATI BUILDERS PVT. LTD.

NYATI ENGINEERS & CONSULTANTS


REF: QEHS/WI/103/REV-0

WORK INSTRUCTION’S MANUAL

REVIEWED BY: APPROVED BY:

MR ED

DATE : Date:

ISSUED TO: CONTROLLED COPY NO:

Address : Nyati Unitree, East Wing, Nagar Road, Yerwada, Pune 411006
Tele : 020-6686 3333
Email : sirsikar@nyatigroup.com
Website : www.nyatigroup.com
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/301/REV-0
Page : 1 of 3

TITLE : QEHS WORK INSTRUCTIONS FOR LINEOUT.

A) QUALITY

1.0 SCOPE:-

Applicable for all Residential /Commercial Buildings line-out activity.

2.0 EQUIPMENT:-

1) Approved Demarcation drawing (Authority of D&D)


2) Approved Layout drawing
3) 30m Steel Tapes
4) Total Station
5) Carpentry material like Bullies, Planks, Nails, etc.
6) Paint & Brush

3.0 RESPONSIBILITY:-

1) HOD D&D
2) Surveyor
3) Site Incharge

4.0 WORK INSTRUCTIONS:-

1) HOD D&D to issue approved demarcation.

2) Surveyor to superimpose the actual possessed plot on


approved demarcation to highlight variance if any.

3) HOD D&D to comply the variance & get the building setting
out layout drawing from Licenced Architect.

4) HOD D&D to verify the drawing is as per prevailing statutory


& legal requirement & issue to site.

5) Site Incharge to record the drawing in drawing register with


revision status. Retrieve the old drawing if any.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/301/REV-0
Page : 2 of 3

TITLE : QEHS WORK INSTRUCTIONS FOR LINEOUT.

6) Site Incharge to call surveyor & get setting of all buildings. Make
brick pillar or erect pegs for 4 corner points of each building &
services

7) Check & confirm all setting is OK as per drawing

8) HOD D&D to verify & certify the setting out

9) Record the details in M&M register and obtain sign of HOD D&D

10) Take minimum 4 trial pits/building for inspection of RCC


Consultant and to conclude depth of excavation & B.C. for design.

11) HOD D&D to issue approved centerline drawing of individual


building.

12) With respect to 4 pegs, fix the railing minimum 6’ to 9’ away from
building line.

13) For Railing, use wooden bullies 6’ c/c & fix the silver patti
4”x1/2” @ 3’ above the ground level or preferably @ plinth level.

14) If railing is not @ plinth level, mark the plinth level on bullies.

15) Transfer the 4 corner points on railing & check Length, Breadth &
Diagonals.

16) Measure & mark all column centerline on railing on either side of
X & Y direction.

17) Fix 1 ½” Nails on the centres marked.

18) Paint the strips of railing with white primer.

19) Numbering of columns centers to be done in red paint.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/301/REV-0
Page : 3 of 3

TITLE : QEHS WORK INSTRUCTIONS FOR LINEOUT.

20) Confirm all numbering is neat & visible from at least 50’ distance
(painting preferably to be done by professional painter).

21) D&D to verify & certify the accuracy for the centerline.

22) Site Incharge to record in M&M Register QAD/702.

B) ENVIRONMENT

1) Before the start of site cleaning, sprinkle water to reduce dust and
prevent air pollution
2) Use mask, safety shoes for site cleaning and line out.

C) HELATH AND SAFETY :

1) Use helmet and safety shoes for cleaning.


2) Before digging check underground utilities like, water, gas, electricity
etc.
3) Ensure snake bite kit is available & used whenever required.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/302/REV-0
Page : 1 of 2

TITLE : QEHS WORK INSTRUCTIONS FOR EXCAVATION.

A) QUALITY

1.0 SCOPE:-

Applicable for all such activities of Residential/Commercial Buildings


where either foundation, concealed, cushioning is criteria.

Applicable for recycling of excavated material whenever possible to


decrease the depletion of natural resources.

2.0 EQUIPMENT:-

1) Line dori, Tape (5 mtr to 30 mtr), lime powder


2) JCB, Pocklain
3) Compressors & Breakers

3.0 RESPONSIBILITY:-

1) Site Incharge/QA
2) Site Supervisor

4.0 WORK INSTRUCTIONS:-

1) Ensure approved Good for Construction drawings for setting out &
RCC drawing for column footing is available.
2) Confirm B.C. assumed in drawing is as per trial pit results.

3) Inform D&D to obtain Royalty Clearance by giving approximate


quantity to be excavated.

4) Mark the grid 5m x 5m and take original ground level with respect to
B.M. as 100.00

5) Start excavation by deploying JCB or Pocklain as per strata &


quantum of work.

6) With every change of strata take & record the levels with the same
grid to derive the excavated quantity for that particular strata.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/302/REV-0
Page : 2 of 2

TITLE : QEHS WORK INSTRUCTIONS FOR EXCAVATION.

7) Take the strata checked for first footing from RCC consultant &
obtain the certificate. Record the same in M&M Register.

8) Take final levels of each pit/mass excavation for deriving total


excavated quantity & refilling quantity.

9) Confirm that excavation pit size doesn’t exceed by 2 feet than footing
size.

10) Remove all loose material & confirm that excavated pit is fairly
leveled.

11) Clean the pit for readiness of next activity.

B) ENVIRONMENT

1) Excavated earth should be stacked properly and sprinkle light water


on surface.
2) Maintain record of excavated and reused earth

C) HELATH AND SAFETY

1) Use helmet and safety shoes for excavation.


2) Barricade all the excavation areas.

3) Keep excavated material 1 Mtr. away from pit.

4) Before digging check underground utilities like, water, gas, electricity


etc.

5) Excavate the entire pit in 45 – degree angle and shore all the area if
excavation is in loose soil, and below 2m depth.

6) While excavation by machine, keep visual controls, movement of


unauthorized persons should not be allowed.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/303/REV-0
Page : 1 of 3

TITLE : QEHS WORK INSTRUCTIONS FOR LABOUR CAMP

A) QUALITY

1.0 SCOPE:-

Applicable for all Residential/Commercial Building.

2.0 EQUIPMENT:-

1) Approved Layout
2) GI Sheets
3) 30m Tape
4) Paint

3.0 RESPONSIBILITY:-

1) Zonal CE
2) Site Incharge

4.0 WORK INSTRUCTIONS:-

1) HOD D&D issue approved demarcation

2) Surveyor to superimpose the actual procured plot on approved


demarcation to highlight variance if any.

3) HOD D&D to comply the variance & get the building setting out
layout drawing from licensed architect.

4) HOD D&D to verify the drawing is as per prevailing statutory &


legal requirement & issue to site.

5) Site inchage to record the drawing in drawing register with revision


status. Retrieve the old drawing if any.

6) Site Incharge to call surveyor & get setting of all building make brick
pillaer or erect pegs for y corner point of each building & services.

7) Check and confirm all setting is OK as per drawing.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/303/REV-0
Page : 2 of 3

TITLE : QEHS WORK INSTRUCTIONS FOR LABOUR CAMP

8) HOD D&D verify & certify the setting out.

9) Record the details in M&M Register & obtain sign of HOD D&D.

10) Identify location of hutment which rest permanent at max period.

11) Location is that free from water flooding and any temporary
retaining wall or near land slide area.

12) Make approach road at site labour camp for water tanker unloading.

13) All hutments in GI Sheets only (As per attached drawing). Make of
drawing of labour camp hutment & list of labours staying therein.

14) Give one light point in each hutment in conduit pipe only.

15) Make water arrangement in sintex tank with tap.

16) Readable numbering on all hutments.

17) Monthly checking hutment for any unauthorized person staying or


any antisocial activity taking place.

B. ENVIRONMENT

1) Check water storage tank for leaks and prevent waste of water.

2) Do not allow any extra electric points than sanctioned.

3) Do not allow use of electric heaters / or any equipments which


consumes more power.

4) Do not allow any person to use open area for toilet purposes.

5) Ensure toilets used by workers do not have any leakages / emissions


or release to land. (sewer discharge through septic tank only)
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/303/REV-0
Page : 3 of 3

TITLE : QEHS WORK INSTRUCTIONS FOR LABOUR CAMP

C. HEALTH AND SAFETY :

1) Labour camp should have well defined lay out with low congestion
& more open spaces.

2) Use only G.I sheets for huts and maintain sufficient distance between
two huts.

3) Ensure there is no water stagnation near huts.

4) Implement good housekeeping and provide hygienic condition.

5) All area, walkways to labour camp should be cleared from any


obstructions.

6) Sufficient number of toilets must be provided and they must be


clean.

7) Sufficient drinking water should be available 24 hrs.

8) Ensure that the facility of waste disposal should be available to all


workers.

9) Always keep a provision of a fire extinguisher near the labour camp.

10) Check every time hut for any smoke when people leave for work.

11) Ensure labour hut floor at mini. 1’’- 0’’ above the ground level.

12) Avoid area near HT lines for installing labour huts.

13) Ensure proper drainage of rain water in labour colony.

14) Employ sweepers to maintain good sanitation for labours.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/304/REV-0
Page : 1 of 3

TITLE : WORK INSTRUCTIONS FOR ANTI TERMITE TREATMENT

A) QUALITY

1.0 SCOPE :

Applicable for all such activities of Residential/ Commercial Buildings


where either foundation, concealed, cushioning is criteria.

2.0 EQUIPMENT :

1) Anti-termite chemicals (Chloropyrifos).


2) Water
3) Hand glows, Safety shoes, Mask.
4) Spray & Pump

3.0 RESPONSIBILITY :

5) Site Incharge
6) Site Supervisor
7) Store Keeper
8) Operator.

4.0 WORK INSTRUCTIONS :

9) Ensure the activity of anti termite is ready to execute in all respect.


10) Order the approved supplier to carry out the work giving the details
of exact area to be treated.
11) Check the Anti termite material brought by the supplier, is as per
approved specification.
12) Check for the expiry date of Anti termite material.
13) Ensure the operator is utilizing all the safety equipments like Mask,
Hand glows, Shoes etc. before he mixes the material at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/304/REV-0
Page : 2 of 3

TITLE : WORK INSTRUCTIONS FOR ANTI TERMITE TREATMENT

14) Check the proportion of Anti termite chemical & water as per the
specification i.e. 1:99 (100 lit of mix contains 1 lit of chemicals & 99 lit
of water).
15) Ensure the drills in the plinth are adequate per Square Meter of the
area to be treated.
16) Pour/spread the anti termite mix (Chemical + Water) over the area
and reconcile the quantity to ensure the adequate utilization; (5 lit of
mix per Sq.m. is the decided criteria).
17) Restrict the area to other labours, to ensure they are not affected by
the emission/ smell of the said mix.
18) See that the operator cleans his hands properly before handling any
other material / food.
19) Ensure that no material is left out at the stores or working place after
work is completed.
20) Ensure that disposal of empty tins from the site is done by the same
agency immediately.
21) Display the MSDS of the chemical at site office & stores as well.

B) ENVIRONMENT :

1) Ensure that chemical containers are not kept open to prevent


spillage and evaporation.

2) Ensure that chemicals are not spread over on the ground, and they
are inserted through

3) Make sure that the hole through which chemical is inserted is


closed by soil.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/304/REV-0
Page : 3 of 3

TITLE : WORK INSTRUCTIONS FOR ANTI TERMITE TREATMENT

C) HEALTH AND SAFETY :

1) Empty containers should be kept away from drinking water


facilities.

2) Operators must put on the mask, hand gloves and goggles before
starting the work.

3) The empty container is taken away from the site after the work is
over.

4) Ensure that the workers do not use the empty container for carrying
water.

5) Chemical barrel shall be sealed off in the presence of site engineer


only.

6) Chemical composition shall be prepared in the presence of site


engineer prior to use.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/305/REV-0
Page : 1 of 3

TITLE : QEHS WORK INSTRUCTIONS FOR P.C.C. WORKS.

A) QUALITY

1.0 SCOPE:-

Applicable for all Residential/Commercial Building’s P.C.C. Work.

2.0 EQUIPMENT:-

1) Measuring Farma (1’x1’x1.25’), Ghamella, OR Weigh Batcher.


2) Concrete Tray (7’6”x4’6”x0’9” & 6’0”x4’0”x0’8”), Mixer (for
concrete of more than 50 bags at a time)
3) Dumpy level, Panja, Rammer, Taping Rod.
4) Level Float.
5) Lubricant.

3.0 RESPONSIBILITY:-

1) Site Incharge
2) Site Supervisor
3) Q.A.

4.0 WORK INSTRUCTIONS:-

1) Ensure approved Good for Construction drawings of R.C.C. is


available with revision status.
2) Ensure strata confirms with design strata & it is duly checked QA &
recorded in M&M Register by Engineer Incharge.

3) Check the depth of pit, confirms to the requirement as per R.C.C.


drawing. If not, excavate further even if strata is met with.

4) Clean the pit & give the level data minimum 100 mm thick or as
specified in R.C.C. drawing. Make a shuttering box 100mm thk of
required dimension.

5) Clean the shuttering & apply lubricant.

6) Ensure the supports to have true line, level & plumb of shuttering.

7) Carry out anti-termite treatment on the area to be PCC.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/305/REV-0
Page : 2 of 3

TITLE : QEHS WORK INSTRUCTIONS FOR P.C.C. WORKS.

8) Incase of highwater table start PCC only after the Pit is dry. Keep
minimum one standby pump at site, so that work does not get
delayed/wrong procedures followed during casting

9) Mix the concrete by mixer/hand by taking proportion as per mix


design.

10) Maintain the W.C. ratio between 0.40 to 0.60.

11) Pour the concrete in position from a height not more than 5’0” to
avoid segregation.

12) Erect “Pour Shoot” or working platform to pour the concrete from
depth more than 5’0”.

13) Ensure the proper compaction of concrete by means of tamping/


ramming/vibrating.

14) Level the top surface w.r.t. level dots.

15) Remove the shuttering next day by taking upmost care to maintain
the edges & corners of the concrete intact.

16) Transfer the centers of column/member on P.C.C. either by nails/


paint/cement mortar.

17) Cure the concrete by sufficient water for at least 7 days.

18) S.I./Q.A. to check & approve the transfer of centers on P.C.C.

19) Record details in M&M in Process Activity Register (QAD/702) duly


signed by QA/SI.

B) ENVIRONMENT:-

1) Cut cement bag by removing stitches and charge directly in batching


/ mixing plant to prevent waste of cement.

2) Do not throw / drop cement bags to prevent air pollution by dust


generation?
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/305/REV-0
Page : 3 of 3

TITLE : QEHS WORK INSTRUCTIONS FOR P.C.C. WORKS.

3) Do not use water pipe having any leakage / damage to prevent waste
of water.

4) Water drums (storage tanks) should not leak.

5) Store empty cement bags separately for appropriate disposal or


reuse.

6) Use kiltan / Hessian cloth to cover the concrete surface to reduce


evaporation loss.

7) Spilled & waste concrete should be used for temp structures.

C) HELATH AND SAFETY:-

1) Use safety helmet, safety shoes, rubber hand gloves and safety belt at
height.

2) Ensure that placing of concrete is done in proper sequence.

3) Always use good quality ladder.

4) Use of safety net, if an opening in the slab.

5) Keep the area clean from iron bars and wooden pieces.

6) Use of earplug by vibrator operator.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/306/REV-0
Page : 1 of 5
QEHS WORK INSTRUCTIONS FOR RMC PLANT
TITLE :
OPERATION.

A. QUALITY

1. SCOPE:-
Applicable for concrete dispatch activities to our existing projects.

2. EQUIPMENTS:-
1) RMC Plant (CP-30)
2) Transit Mixers,
3) JCB Machine,
4) Diesel Generator,
5) Material Stock Yard,
6) U.G.Water Tank of capacity 30,000 ltr.
7) Curing Tank of concrete Cube.
8) Cement Godown of capacity 6000 bags,
9) Annual maintenance contract.
10) Weekly maintenance of transit mixer & plant,
11) Q.C. Lab Equipments:-
i. Cube moulds of size 15cm x 15cmx15cm,
ii. Ventilated Oven,
iii. I.S. Sieve set for material gradation,
iv. Sand pouring cylinder for calculating proctor density of material,
v. Compressive Testing Machine for testing of cubes,
vi. Slump cone with graduated tamping rod.

3. RESPONSIBILITY:-
Plant Incharge.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/306/REV-0
Page : 2 of 5
QEHS WORK INSTRUCTIONS FOR RMC PLANT
TITLE :
OPERATION.

4. WORK INSTRUCTIONS:-

1) INPUTS :-
Following are considered as inputs to this procedure.
1) Concrete requirements received from site,
2) Raw material received from supplier,
3) Mix design.

2) PROCESS / OPERATION :-

PLANNING :-

1) Daily production plan for RMC is prepared & displayed on display


board.

2) Before starting concreting, diesel in TM to be checked, km reading of


TM to be checked & written in a log book.

3) If a quantity of diesel is less, fill the diesel in proper quantity & record it
in a register, also the quantity of diesel in DG checked before concreting
gets starts.

4) Ensuring that, all the mix designs are properly set in a control panel of
batching plant.

COLLECTION OF RAW MATERIALS :-


1) Raw material checked with moisture content present in that & water
absorption for the correction of mix design.

2) Incoming material at stock is indentified by suitable mean, tags board /


labels, etc.

3) Material specification & QAP is available for inspection of incoming


material by inspecting authority.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/306/REV-0
Page : 3 of 5
QEHS WORK INSTRUCTIONS FOR RMC PLANT
TITLE :
OPERATION.

4) Inspected result of material is recorded in testing register.

5) Relevant documents from suppliers are kept for record in incoming


material register.

6) Only passed material is released for further processing & only kept at
stock / site/ store.

7) Delivery challan received from supplier kept in a separate register &


than forward for GRN, with security check by security staff.

ACTIVITIES / OPERATION:-
1) As per the requirement of concrete from site, particular grade of
concrete is set to deliver the concrete.

2) Plant operator sets the quality of material on control panel as per the
mix design of particular grad of concrete.

3) A pour of 0.5cum. is produced within 40-60 seconds.

4) Cement is unloaded at cement godown / silo / hopper at RMC Plant.

5) Scraper operator drags the material for mixing.

6) After completion of batch of 6 cum. then 6 nos. of cube casted for each
grade of concrete for particular day. 6 cubes are casted for every 50 cum
of each grade.

7) Slump of concrete is checked for workability. Additional quantity of


admixer & water provided with transit mixer to maintain the
workability in case of delay.

8) Cubes are tested on CTM at 7 days & 28 days of interval at RMC plant,
for compressive strength purpose.

9) Before unloading of the RMC at the site, the challan is to be signed the
store keeper and the site engineer. Clearly stating the grade and
quantity of concrete and the location of unloading.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/306/REV-0
Page : 4 of 5
QEHS WORK INSTRUCTIONS FOR RMC PLANT
TITLE :
OPERATION.

RECONCILLATION:-
1) Consumption of material is checked, whether it goes as per mix design
or not.

2) The empty cement bags are then counted & checked with the
consumption report & also checked whether all the cement bags are
stacked properly with any leakages inside.

3) Before closing the plant, seal must be there for diesel tank of every TM,
Q.C. Lab, Computer cabin, Cement godown etc.

4) Monitoring & measurement of material with updated data &


consumption is considered as output.

MATERIAL STACKING:-

1) Cement:-

Cement is unloaded at cement godown at site/ RMC Plant / Silo /


Store.

2) Admixer:-

Admixer is kept in a drum with a motor fixing on it for the purpose of


mixing in the concrete.

3) Materials:-

All the materials regarding concreting like 10mm metal, 20mm metal,
Crused sand should be stacked separately with maintaining & updating
records of every lot.

4) Calibration of RMC Plant to be done after 40,000 cum/1year whichever


is earlier.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/306/REV-0
Page : 5 of 5
QEHS WORK INSTRUCTIONS FOR RMC PLANT
TITLE :
OPERATION.

B) ENVIRONMENT:-
1) Cut Cement bag by removing stitches & change directly in beaching /
mixing plant to prevent west of cement.

2) Do not throw/drop cement bags to prevent air pollution by dust


generation.

3) P.U.C. Checked of all vehicle enter in premises.

4) Do not use Water pipe having any leakage / damage & prevent waste of
water.

5) Water drain should not leak.

6) Store empty cement bags separately for appropriate disposal of reuse.

7) Use Hessian cloth to cover the concrete surface to reduce evaporation loss.

8) Spilled & waste concrete should be used for temporary structure.

9) Use sign board for awareness for environment.

C) HEALTH & SAFTY:-


1) Use Helmet, safety shoes, Rubber Hand Gloves & safety Belt at height.

2) Always use good quality ladder.

3) Proper sanitation provided.

4) Use industrial plug for temporary electric connection.

5) Use sign Board for awareness for safety. .

6) Mask is provided for labour & Operator.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/307/REV-0
Page : 1 of 3

TITLE : QEHS WORK INSTRUCTIONS FOR MAKING OF C.M.


COVER BLOCK FOR REINFORCEMENT.

A) QUALITY:

1. SCOPE :-
Applicable for all residential / Commercial Buildings for Reinforcement Cover

2. EQUIPMENTS :-
1) Tray (6’X4’X8”), Ghamela, Spade, Trowel, Bucket.
2) PVC Farma of Size :
3) For footing (LXH) Ø 60mmX 50mm
4) For Column (LXH) Ø 90mmX25mm & Central Hole of Ø 10mm.
5) For Beam (LXH) Ø 30mm X 20mm
6) For Slab (LXH) Ø 30mm X20mm
7) Piece of Binding wire of length 150mm.

3. RESPONSIBILITY :-
1) Sr. Engineer

4. WORK INSTRUCTIONS :-
1) PVC Farma of above mention size issued from store after checking by Senior Engineer.

2) PVC Farma is cleaned.

3) Mix the Cement & Crush Sand in Ratio of 1:2 in the tray. Water is added till get hand
paste. Cement, Crush Sand & water is mixed with spade properly. Now Cement, Crush
Sand paste is ready. We should ensure that prepared paste should consumed within 1
Hours. This is the normal method of mixing of normal grade of Concrete.

1
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/307/REV-0
Page : 2 of 3

TITLE : QEHS WORK INSTRUCTIONS FOR MAKING OF C.M.


COVER BLOCK FOR REINFORCEMENT.

4) For Higher grade of concrete, we mention the water cement ratio while mixing with
crush sand of required grade of concrete cover.

5) Pastes is poured in farma over plane M.S. Hard surface & compacted with trowel &
maintain the top surface equal with PVC Farma .Now remove the farma by keeping
molded mortar on the same position. Same process continues on another adjacent
surface area.

6) Binding wire piece is embedded in centre of cover Block if required.

7) For Slab cover Block, Round notch of Ø 10mm & 2mm depth is provided in 20mm
depth cover Block.

8) For round cover of column : Round mould paste is placed over hard surface & than hole
of Ø 10mm is done with the help of M.S.Rod in the centre of mould cover Block.

9) Next day all molded C.M. Block of Same grade is Kept in to Cement Bag & then Put in
to water tank for Curing up to 14 days.

10) Daily C.M. Block making quantity is counted & record send to H.O.

B) ENVIRONMENT:-
1) Open Cement bag by removing stitches & unload directly in beaching / mixing plant
to prevent west of cement.

2) Do not throw / drop cement bags to prevent air pollution by dust separation.

3) P.U.C. Checked of all vehicle enter in premises.

4) Do not use Water pipe having any leakage / damage & prevent wastage of water.

5) Water drain should not leak.

6) Store empty cement bags separately for appropriate disposal of reuse.


2
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/307/REV-0
Page : 3 of 3

TITLE : QEHS WORK INSTRUCTIONS FOR MAKING OF C.M.


COVER BLOCK FOR REINFORCEMENT.

7) Use Hessian cloth to cover the concrete surface to reduce evaporation loss.

8) Spilled & waste concrete If any should be used for temporary structure.

9) Use sign board for awareness for environment.

C) HEALTH & SAFTY:-


1) Use Helmet, safety shoes, Rubber Hand Gloves.
2) Ensure that placing of concrete in proper sequence.
3) Always use sturdy ladder.
4) Use of safety net, if a spacing in the slab.
5) Keep the area clean from iron bar & wooden pieces.
6) Use earplug by vibrator operator.
7) Use industrial plug for temporary electric connection.
8) Use proper Barricating for excavated pit.
9) Use sign Board for awareness for safety.
10) Use Gum boot for concreting Labour.
11) Use of Mask for workers handling cement & dust.
12) Use safety belt for tying of reinforcement above three meter height.

3
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/308/REV-0
Page : 1 of 5

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION


TITLE :
FOOTING & RAFT.

A) QUALITY:

1. SCOPE :-

Applicable for all residential / Commercial Buildings footing, raft work.

2. EQUIPMENTS :-

1) Measuring farma (1’x1’x1’25’’), ghamella or Concrete tray (7’6”x4’6”x9” & 6’x4’8”).

2) Weigh Batcher with one Bag Mixer or R.M.800 or R.M.C. Plant with transit mixer.

3) Concrete Pump with all accessories or wheel barrow with manually.

4) Dumpy level, Panja, Vibrator with needle 60mm, Randha, spatula.

5) May be Total station if project is more than 1lack sq. ft. area.

6) May be Tower crane if project is more than 2 lack sq. ft. area & required fast work.

7) Shuttering materials like – 12mm P.C. Ply, Wooden Patti 3”x2”, wooden Chavi
4”x3”, M.S. Props, Shikanja, M.S. Sq Pipe 50mm x 50mm.

8) Spades, Mortor pan, plumb, Right Angle, Tape 5mtr, may scaffolding material for
heavy footing, Trowel, linedoori, Nails ( size – 1 ½” , 2 ½” , 3” ) lubricant, R.C.C.
Cover Block as specified in R.C.C. drawing, Wheel Barrow, Concrete Pump with all
accessories, Curing pipe, hessian cloth, 6 No’s Cube, Slump cone, Measuring Tape of
30 m.

9) Steel bar cutting & Bending machine, Hand cutter machine.

3. RESPONSIBILITY :-

1) Site Incharge
2) Sr. Engineer
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/308/REV-0
Page : 2 of 5

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION


TITLE :
FOOTING & RAFT.

4. WORK INSTRUCTIONS :-

Shuttering :

1) Ensure the approved Good for Construction, R.C.C. & Architectural drawing with
revision status.

2) Ensure the required level of footing & mark the center along with all four corner of
footing size over P.C.C. with the help of centerline boundary or Total Station.

3) Clean the surface & start shuttering as shape & size mentioned in R.C.C. Drawing.

4) Lubricant the Shuttering surface after carpentry works over.

5) Sides of Shuttering are supported laterally by M.S. Props & Wooden Chavi at 2’0”
c/c at bottom & top. Support may insure if footing size are heavy as per S.I.
instruction. Bottom portion of side is locked by wooden Patti 4” X1 ½” with the help
of nails over PCC. All four corners of shuttering from top is provided diagonally
cross wooden Patti 4”X 1 ½” for fixing of corners in position.

6) Line, Level, Size & Plumb of shuttering should be perfect, if not set perfect than
rectified till Ok.

7) To check and endorse in QAD/702-M & M register by the S. I.

Reinforcement:

1) Reinforcement starts laying for Jali & column as per length & shape indicated in
R.C.C. Drawing.

2) Position & Orientation of reinforcement check & get ok with the help of linedoori,
Plumb & cover for reinforcement provided properly.

3) Now finally checked the shuttering & reinforcement at a time & instruction issued for
casting footing after everything Ok as per drawing.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/308/REV-0
Page : 3 of 5

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION


TITLE :
FOOTING & RAFT.

4) Chair is provided if reinforcement is of double Jali as specified in drawing. Cover for


reinforcement is provided as per specified in RCC Drawing.

Concreting:

1) Concrete prepared at site by mixer or placed order to R.M.C. Plant as per mix
specified in R.C.C. Drawing.

2) For small footing concreting done by mixer & wheel Barrow, if footing size is more
than 10 cum. than concreting done by concrete pump.

3) If concreting done by mixer RM 800 than mix design set into panel & Labour gang set
for filling of Aggregates, Cement & Admixture in mixer delivered. Concrete
delivered in wheel barrow or Concrete Pump.

4) Concrete grout is passed through pipe line Just before starting concrete. Transit mixer
shute placed over concrete pump hopper. Concrete delivered in to Pump suit & than
concrete transport up to req. position by pressure system.

5) Concrete is done by concrete pump than pipe line of pump is placed up to concrete
delivered point. Oil & diesel checked before starting Pump.

6) Concrete is vibrated by 60mm needle for proper vibration & labour gang spread the
concrete with the help of spades.

7) Concrete get over after filling up to required depth & set finish with the help of
mason properly.

8) 6 Cube cast for checking strength of concrete in 7 days & 28 days. With Coding as
date of Casting, Location of structure, Grade of concrete.

Deshuttering, centering, Hacking, Cleaning:

1) Remove the shuttering after 24 hours by taking up most care to maintain the edges &
corners of the concrete.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/308/REV-0
Page : 4 of 5

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION


TITLE :
FOOTING & RAFT.

2) Cure the concrete by putting Hessian cloth at least 14 days.

3) Record of work procedure, Checks & measurements are recorded in M & M in


Progress Activity Register (QAD / 702) duly signed by QA / SI.

4) Hacking done @ 50 No’s/sft. if required.

5) Surface clean & material stack.

6) Debris placed in debris collection point.

B) ENVIRONMENT:-

1) Open Cement bag by removing stitches & unload directly in beaching / mixing plant
to prevent west of cement.

2) Do not throw / drop cement bags to prevent air pollution by dust severation.

3) P.U.C. Checked of all vehicle enter in premises.

4) Do not use Water pipe having any leakage / damage & prevent wastage of water.

5) Water drain should not leak.

6) Store empty cement bags separately for appropriate disposal of reuse.

7) Use Hessian cloth to cover the concrete surface to reduce evaporation loss.

8) Spilled & waste concrete If any should be used for temporary structure.

9) Use sign board for awareness for environment.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/308/REV-0
Page : 5 of 5

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION


TITLE :
FOOTING & RAFT.

C) HEALTH & SAFTY:-

1) Use Helmet, safety shoes, Rubber Hand Gloves.

2) Ensure that placing of concrete in proper sequence.

3) Always use sturdy ladder.

4) Use of safety net, if a spacing in the slab.

5) Keep the area clean from iron bar & wooden pieces.

6) Use earplug by vibrator operator.

7) Use industrial plug for temporary electric connection.

8) Use proper Barricating for excavated pit.

9) Use sign Board for awareness for safety.

10) Use Gum boot for concreting Labour.

11) Use of Mask for workers handling cement & dust.

12) Use safety belt for tying of reinforcement above three meter height.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/309/REV-0
Page : 1 of 4

TITLE : QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


RCC COLUMN

A. QUALITY :
1. SCOPE:
Application for Residential / Commercial Buildings for RCC Column work.

2. EQUIPMENTS:-

1) Measuring farma (1’x1’x1.25’), ghamella or Concrete Tray (7’6”x4’6”x9” & 6’0”x4’x8”),

2) Weigh Batcher with one Bag Mixture Or R.M.800 or RMC plant with Transit Mixer, lift
hoist, Concrete Pump.

3) Shuttering material like:- 12mm P.C.Ply, Wooden Patti 3”x2”, Joint channel 75mm
flange called shoulder of req. size, M.S. Props, Tie rod with nut of req. size, Shikanja 3’,
Wooden Chavi 4”x3”, Nails 1 ½”, 2 ½”, Lubricant.

4) Vibrator with needle of 60mm dia. & 40mm dia. & measuring tape 5m & 30m,
Scaffolding materials for staging, Trowel, Right Angle, Plumb bob.

5) Concrete cover block of required size, Spades, Pan, Wheel Barrow, concrete pump with
all accessories or lift with hoist, Curing pipe, Hessian cloth, 6 nos. cube mould, slump
cone.

6) Steel bar cutting machine, Bending machine, Hand cutter machine.

3. RESPONSIBILITY:-

1) Site Incharge
2) Sr. Engineer
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/309/REV-0
Page : 2 of 4

TITLE : QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


RCC COLUMN

4. WORK INSTRUCTIONS:-

SHUTTERING:-

1) Ensure the approved Good for construction, R.C.C. & Architectural drawings with
revision status.

2) Make the column size mould with the help of 12mm P.C.Ply & 3”x2”x8’ wooden batten.
Batten is fixed over ply @ 10” c/c vertically. Both end of ply has also horizontal batten
along the width. Batten is fixed on edge over ply by 1 ½” Nails.

3) First we cast starter of column having height 6” after erecting proper steel & ring in
column with req. cover. Starter ensures the line, level & size of column at surface level.
level. Distance and diagonals & Centre lines are checked strictly with respect to
building face.

4) Makes farma of column is Erecting over starter with the help of shikanja. Then M.S.
shoulder is placed with tie rod & nut, all four sides in such a way that 1st Shoulder
should fixed over the starter, than 1’6” & there after 2’0” c/c up to top end. All Tie rods
are tight with the help of nut.

5) Lubricant should apply over the inner surface of ply before erecting form & false work.

6) Vertical alignment & support is made by 3m or 4m props laterally, concrete pouring


level marked by nails in column shuttering. Outer face of column is made vertical
alignment with the help of props & turn buckle.

7) Line, level, orientation, size, rectangle, plumb checked by Jr. Engineer/ Sr. Engineer &
Q.A. Permission issued for pouring concrete.

REINFORCEMENT:-

1) Reinforcement of column is cut & band in steel yard as per R.C.C. drawing & placed in
existing reinforcement with appropriate lap. Rings provided as per mention in
drawing. Cover for reinforcement provided in center & top of column as specified in
drawing. Round precast concrete cover with centre whole are fixed at bottom & top on
all four faces before erecting shuttering.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/309/REV-0
Page : 3 of 4

TITLE : QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


RCC COLUMN

CONCRETE & MISCELENEOUS WORK:-

1) Concrete prepared at site by mixer or placed order to R.M.C. Plant as mix specified in
R.C.C. drawing.

2) For small column concrete placing is done by manually with spade & ghamella. If
column is heavy than it pourd by concrete pump.

3) Concrete filled till level marked & finished by trowel. Vibrator needle of 60 is placed till
get concrete is proper compacted.

4) Position of column rechecked 12 hours after de-shuttering & hessian cloth wounded for
curring up to 14 days to 28 days.

5) If Honeycomb observed if any is finished with neat cement.

6) 6 cubes taken for checking for strength of concrete.

7) Record for work process, measurements & checked is recorded in M & M in process
activity register (QAD/702), daily signed by Q.A. /S.I.

8) If required hacking is done @ 50 nos./sq. ft.

A. ENVIRONMENT:-

1) Cut Cement bag by removing stitches & change directly in beaching / mixing plant to
prevent west of cement.

2) Do not throw / drop cement bags to prevent air pollution by dust generation.

3) P.U.C. Checked of all vehicle enter in premises.

4) Do not use Water pipe having any leakage / damage & prevent west of water.

5) Water drain should not leak.

6) Store empty cement bags separately for appropriate disposal or reuse.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/309/REV-0
Page : 4 of 4

TITLE : QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


RCC COLUMN

7) Use Hessian cloth to cover the concrete surface to reduce evaporation loss.

8) Spilled & west concrete should be used for temporary structure.

9) Use sign board for awareness for environment.

B. HEALTH & SAFTY:-

1) Use Helmet, safety shoes, Rubber Hand Gloves & safety Belt at height.

2) Ensure that placing of concrete in proper sequence.

3) Always use good quality ladder.

4) Use of safety net, if a spacing in the slab.

5) Keep the area clean from iron bar & wooden pieces.

6) Proper sanitation provided.

7) Use earplug by vibrator operator & Pump operator.

8) Use industrial plug for temporary electric connection.

9) Use proper Barricading of edge portion of Slab.

10) Use sign Board for awareness for safety.

11) Ensure concrete pump delivery pipe is not tied to any supporting structure of Slab,
Beam and Column.

12) Ensure horizontal pipes of Concrete pump are resting on M.S. Chair.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/310/REV-0
Page : 1 of 7

TITLE : QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


RCC STAIRCASE

A) Quality:

1. SCOPE :-

Applicable for all residential project R.C.C. Staircase work in Ply.

2. EQUIPMENTS :-

1) Measuring farma (1’x1’x1’25’’), ghamella , R.M.800 also with lift hoist or R.M.C.
Plant with transit mixer. & Concrete Pump, R.M. 800 with concrete Pump.

2) Concrete tray (7’6”x4’6”x9” & 6’x4’8”).

3) Shuttering material like:- 12mm P.C.Ply, Wooden Patti 4”x1 ½”, Lapha 4”x1 ½”,
M.S. Props 3mtr, shikanja 2’6”, Wooden chavi 3”x4”, Nails 1 ½”, 2 ½”, 3”,
Lubricant, M.S. Span 2.4 to 4.2mtr, Scaffolding materials for staging, Bracing Pipe
50mm dia.

4) Measuring Tape 5m & 30m, Vibrator with needle 40mm dia. & 60mm dia. ,
Vacuum Cleaner.

5) Concrete cover block of req. size, Spades, Pan, Wheel Barrow, Trowel, Right
Angle, Plumb bob, Lift with hoist or Concrete Pump with all accessories, Curing
Pipe, Hessian Cloth, 6 nos. cube mould, Slump cone, Randha, Aluminum Patti 6’
or 12’ Long.

3. RESPONSIBILITY :-

1) Site Incharge
2) Sr. Engineer
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/310/REV-0
Page : 2 of 7

TITLE : QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


RCC STAIRCASE

4. WORK INSTRUCTIONS :-

Shuttering :

1) Ensure the approved Good for Construction, R.C.C. & Architectural drawing with
revision status.

2) Making of ply for beam bottom & sides of beam. Beam bottom is made with
12mm P.C.Ply with two Nos of 4”x1 ½” wooden Patti. Beam side is made with
12mm P.C.Ply as required size in drawing with 4”x1 ½” batten @ 10” c/c along
length & both end in width.Making of ply is made as described above method for
waist slab & Landing.Riser of specified size is also made with Ply supported by 4”
X 1 ½” wooden Batten on both end along the length.

3) Level mark on column for fixing beam bottom as per Landing/Floor height
mention on drawing.

4) Topi of beam bottom fixed over column as per req. depth of beam & than beam
bottom rest over them with vertical props support @ 2’ c/c. wooden chavi 4”x3”
placed as cantilever if projection of Chajja is required.

5) Outer beam side erect over beam bottom with the help of nails. Making sides are
also placed over cantilever chavi 4”x3”, if projection is required.

6) Span is placed @ 2’0” c/c as per concreting thickness of Landing size & span edge
rest over 4”x3” wooden chavi with vertical M.S.Props at 2’0” c/c.

7) Now wooden Chavi 4”x3” of required length @ 10” c/c is placed across the span,
than P.C. Ply is laid over with nails as per size of Landing. We should take care
that there should be no gap between two ply. Now shuttering for waist Slab is
placed diagonally matching with top & bottom landing. Wooden chavi of 4”X3”
of req. length is placed on the bottom face of waist Slab @ 1’ 6”.Chavi is supported
by M.S. Props @ 2’ C/C. Shuttering of first landing is goes to 300mm more than
the size of Landing & Second Landing as less than 300 mm by landing size. Steps
are calculated and mark over the side face of waist Slab properly. Now riser is
fixed over the side waist Slab after laying a steel.Line & level is fixed with the help
of line dori & tube level. Two cross top Bandhi of wooden patti of 4”X1 ½” is
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/310/REV-0
Page : 3 of 7

TITLE : QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


RCC STAIRCASE

placed over riser and nailed it properly so that riser should intact in position.
Diagonal, size of room, thickness of concrete for Landing & waist Slab are checked
by Sr. Engineer, Surface of ply cleaned by Vacuum cleaner & lubricant apply.
Now clearance given to reinforcement contractor for laying steel.

8) After laying steel, outer side of beam is fixed with the inclined supported of 4”x1
½”, wooden Patti in center & top. Chajja side is also fixed with making Ply &
supported given from cantilever wooden chavi. Outer line is checked properly
with the help of linedoori.

9) Beam bottom is clamped with shikanja & middle top portion is supported by
wooden Patti & 4”x1 ½” taking support from span chavi.

10) All M.S. props is braced by 2”dia. M.S. Pipe with the help of swing coupler.

11) All column junctions are closed properly in shape, size & clamped by shikanja all
around.

12) Remove the excess shuttering materials stacked below the slab level.

13) Now Staircase is ready for casting.

Reinforcement:

1) Reinforcement is cut & bend in steel yard as per required size & position. Specified
in RCC Drawing.

2) Cut & bend steel is placed over slab manually or by crane. Tagging start by
binding wire with proper placement of steel. Ring is also provided for Beams &
columns as specified.

3) Cover for reinforcement is provided for slab, beam, column, as specified in


drawing.

4) Steel Chair is provided over bent up & double Zali for proper position of
reinforcement.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/310/REV-0
Page : 4 of 7

TITLE : QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


RCC STAIRCASE

5) Surface cleaned after completing reinforcement by Vacuum cleaner.

6) Staircase reinforcement is checked by Sr. Engineer.

7) Now we can pour the concrete in Staircase, beam, and chajja after rectification
done.

Concreting:

1) Before starting concreting, we check the condition of R.M.800 mixer, lift hoist &
concrete pump. Diesel & Oil is filled if machine is diesel.

2) One mason with Randha, Patti, spatula is required for finishing concrete surface.

3) Vibrator of needle 40mm dia. & 60mm dia. are kept over slab with one stand by.

4) Concrete filling level is marked over beam side & column for maintaining surface.
Concrete filling Kanda is also provided to mason for checking randomly.

Concreting with Mixer & Hoist:-

1) Mix design written over board near mixer.

2) Mix design set in panel for required weight of Aggregate, Cement, Sand & water.

3) Aggregate & cement placed into mixer manually, till getting correct required at
display, mixer takes water automatically. Admixture placed manually by
measuring Jar.

4) Concrete is mixed & unloaded in suit of lift & concrete lifted through hoist &
dump in tray over the surface of slab.

5) Concrete is transported at required place with the help of wheel barrow. Wheel
barrow runs over the surface of making ply side laid up to required position.

6) Concrete placed in slab & beams are vibrated & mason level the surface.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/310/REV-0
Page : 5 of 7

TITLE : QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


RCC STAIRCASE

CONCRETE WITH TRANSIT MIXER & CONCRETE PUMP:-

1) Concrete grade & quantity is ordered to R.M.C. Plant one day before & concreting
time decided by R.M.C. plant & site incharge mutually.

2) Diesel & oil of pump checked properly.

3) Pipe line lay up to the required position of slab, with proper support.

4) Cement slurry passed over concrete pipe before just starting concrete.

5) Concreting carrying through transit mixer is delivered in concrete pump, Bucket &
than pumped it to require level. Concrete pipe can moved anywhere with the help
of additional pipe, bends & clamp.

6) Concrete vibrated by vibrator with needle 40mm dia. & 60mm dia. Surface leveled
by mason with Patti & trowel. After completing the concrete Ball Pass process is
done for cleaning pipe line & Pump Hopper with the help of Air pressure or water
pressure.

7) Cube cast 6 nos. with tamping 35 times for each layer & finished with trowel. &
Coding done as date of casting, Grade of concrete, Location of the structure.

8) Surface cleaned after concreting.

DESHUTTERING, CURING, HACKING, AND CLEANING:-

1) Deshuttering starter as per instruction issued by R.C.C. Consultant.

2) If honey comb seen than it finished by cement, trowel as per S.I. instruction.

3) Hessian cloth is placed & fluded with water for 14 to 28 days.

4) Hessian cloth provided over vertical surface of beam after deshuttering.

5) Hacking should do in specified area at 50 nos /sq. ft.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/310/REV-0
Page : 6 of 7

TITLE : QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


RCC STAIRCASE

6) Deshuttering material stacked & surface cleaned properly.

7) Water sprinkling just after concrete set during casting of slab for arounding surface
cracks.

B) ENVIRONMENT:-

1) Open Cement bag by removing stitches & change directly in beaching / mixing
plant to prevent west of cement.

2) Do not throw / drop cement bags to prevent air pollution by dust severation.

3) P.U.C. Checked of all vehicle enter in premises.

4) Do not use Water pipe having any leakage / damage & prevent west of water.

5) Water drain should not leak.

6) Store empty cement bags separately for appropriate disposal of reuse.

7) Use Hessian cloth to cover the concrete surface to reduce evaporation loss.

8) Spilled & west concrete should be used for temporary structure.

9) Use sign board for awareness for environment.

C) HEALTH & SAFTY:-

1) Use Helmet, safety shoes, Gum boot, Rubber Hand Gloves & safety Belt at height.

2) Ensure that placing of concrete in proper sequence.

3) Always use good quality ladder.

4) Use of safety net, if a spacing in the slab.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/310/REV-0
Page : 7 of 7

TITLE : QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


RCC STAIRCASE

5) Keep the area clean from iron bar & wooden pieces.

6) Proper sanitation provided.

7) Use earplug by vibrator operator.

8) Use industrial plug for temporary electric connection.

9) Use proper Barricading for duct area.

10) Use sign Board for awareness for safety.

11) Outer portion of slab is barricading by ropes.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/311/REV-0
Page : 1 of 5

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


TITLE :
RCC PARDI

A. QUALITY :
1. SCOPE:

Application for Residential / Commercial Buildings for RCC Pardi work.

2. EQUIPMENTS:-

1) Measuring farma (1’x1’x1.25’), ghamella or Concrete Tray (7’6”x4’6”x9” &


6’0”x4’x8”),

2) Weigh Batcher with one Bag Mixture Or R.M.800 or RMC plant with Transit Mixer,
lift hoist, Concrete Pump.

3) Shuttering material like:- 12mm P.C.Ply, Wooden Patti 3”x2”, Joint channel 75mm
flange called shoulder of req. size, M.S. Props, Tie rod with nut of req. size, Shikanja
3’, Wooden Chavi 4”x3”, Nails 1 ½”, 2 ½”, Lubricant.

4) Vibrator with needle of 60mm dia. & 40mm dia. & measuring tape 5m & 30m,
Scaffolding materials for staging, Trowel, Right Angle, Plumb bob.

5) Concrete cover block of required size, Spades, Pan, Wheel Barrow, concrete pump
with all accessories or lift with hoist, Curing pipe, Hessian cloth, 6 nos. cube mould,
slump cone.

6) Steel bar cutting machine, Bending machine, Hand cutter machine.

3. RESPONSIBILITY:-

1) Site Incharge

2) Sr. Engineer
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/311/REV-0
Page : 2 of 5

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


TITLE :
RCC PARDI

4. WORK INSTRUCTIONS:-

SHUTTERING:-

1) Ensure the approved Good for construction, R.C.C. & Architectural drawings with
revision status.

2) Make the Pardi size mould with the help of 12mm P.C.Ply & 3”x2”x8’ wooden
batten. Batten is fixed over ply @ 10” c/c vertically. Both end of ply has also
horizontal batten along the width. Batten is fixed on edge over ply by 1 ½” Nails.

3) First we cast starter of Pardi having height 6” after erecting proper steel & ring in
Pardi with req. cover. Starter ensures the line, level & size of Pardi at surface
level.Distance and diagonals & Centre lines are checked strictly with respect to
building face.

4) Makes farme of Pardi as Erecting over starter with the help of shikanja. 50mm
X50mm Square M.S. Pipe is placed along length @ 1’ 6” C/C over the Batten of
Ply. Then M.S. shoulder is placed with tie rod & nut, all sides in such a way that
1st Shoulder should fixed over the starter, than 1’6” & there after 2’0” c/c up to top
end. Shoulder /Joint Channel which placed over square pipe with the help of Tie
rod @ 2’ 6” C/C . All Tie rods are tight with the help of nut & tie rod pass through
1” PVC conduit betn two face of shuttering. So that Tie rod need not to lock with
concrete.

5) Lubricant should apply over the inner surface of ply before erecting form & false
work.

6) Vertical alignment & support is made by 3m or 4m props laterally, concrete


pouring level marked by nails in Pardi shuttering. Outer face of Pardi is made
vertical alignment with the help of props & turn buckle.

7) Line, level, orientation, size, rectangle, position, plumb are checked by Jr.
Engineer/ Sr. Engineer & Permission issued for pouring concrete.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/311/REV-0
Page : 3 of 5

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


TITLE :
RCC PARDI

REINFORCEMENT:-

1) Reinforcement of Pardi is cut & band in steel yard as per R.C.C. drawing & placed
in existing reinforcement with appropriate lap. Rings provided as per mention in
drawing. Cover for reinforcement provided in center & top of Pardi as specified in
drawing. Round precast concrete cover with centre whole are fixed at bottom &
top on all four faces before erecting shuttering.

CONCRETE & MISCELENEOUS WORK:-

1) Concrete prepared at site by mixer or placed order to R.M.C. Plant as mix


specified in R.C.C. drawing.

2) For small Pardi concrete placing is done by manually with spade & ghamella. If
Pardi is heavy than it pourd by concrete pump.

3) Concrete filled till level marked & finished by trowel. Vibrator needle of 60 is
placed till get concrete is proper compacted.

4) Position of Pardi rechecked 12 hours after de-shuttering & hessian cloth wounded
for curring up to 14 days to 28 days.

5) If Honeycomb observed if any is finished with neat cement.

6) 6 cubes taken for checking for strength of concrete.

7) Record for work process, measurements & checked is recorded in M & M in


process activity register (QAD/702), daily signed by Q.A. /S.I.

8) If required hacking is done @ 50 nos./sq. ft.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/311/REV-0
Page : 4 of 5

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


TITLE :
RCC PARDI

A. ENVIRONMENT:-

1) Cut Cement bag by removing stitches & change directly in beaching / mixing
plant to prevent west of cement.

2) Do not throw / drop cement bags to prevent air pollution by dust generation.

3) P.U.C. Checked of all vehicle enter in premises.

4) Do not use Water pipe having any leakage / damage & prevent west of water.

5) Water drain should not leak.

6) Store empty cement bags separately for appropriate disposal or reuse.

7) Use Hessian cloth to cover the concrete surface to reduce evaporation loss.

8) Spilled & west concrete should be used for temporary structure.

9) Use sign board for awareness for environment.

B. HEALTH & SAFTY:-

1) Use Helmet, safety shoes, Rubber Hand Gloves & safety Belt at height.

2) Ensure that placing of concrete in proper sequence.

3) Always use good quality ladder.

4) Use of safety net, if a spacing in the slab.

5) Keep the area clean from iron bar & wooden pieces.

6) Proper sanitation provided.

7) Use earplug by vibrator operator & Pump operator.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/311/REV-0
Page : 5 of 5

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


TITLE :
RCC PARDI

8) Use industrial plug for temporary electric connection.

9) Use proper Barricading of edge portion of Slab.

10) Use sign Board for awareness for safety.

11) Ensure concrete pump delivery pipe is not tied to any supporting structure of
Slab, Beam, Pardi.

12) Ensure horizontal pipes of Concrete pump are resting on M.S. Chair.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/312/REV-0
Page : 1 of 6

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


TITLE :
RCC SLAB FOR RESIDENTIAL PROJECT

A) Quality:

1. SCOPE :-

Applicable for all residential project R.C.C. Slab work in Ply.

2. EQUIPMENTS :-

1) Measuring farma (1’x1’x1’25’’), ghamella , R.M.800 also with lift hoist or R.M.C.
Plant with transit mixer. & Concrete Pump, R.M. 800 with concrete Pump.

2) Concrete tray (7’6”x4’6”x9” & 6’x4’8”).

3) Shuttering material like:- 12mm P.C.Ply, Wooden Patti 4”x1 ½”, Lapha 4”x1 ½”,
M.S. Props 3mtr, shikanja 2’6”, Wooden chavi 3”x4”, Nails 1 ½”, 2 ½”, 3”,
Lubricant, M.S. Span 2.4 to 4.2mtr, Scaffolding materials for staging, Bracing Pipe
50mm dia.

4) Measuring Tape 5m & 30m, Vibrator with needle 40mm dia. & 60mm dia. , Vacuum
Cleaner.

5) Concrete cover block of req. size, Spades, Pan, Wheel Barrow, Trowel, Right Angle,
Plumb bob, Lift with hoist or Concrete Pump with all accessories, Curing Pipe,
Hessian Cloth, 6 nos. cube mould, Slump cone, Randha, Aluminum Patti 6’ or 12’
Long.

3. RESPONSIBILITY :-

1) Site Incharge

2) Sr. Engineer

4. WORK INSTRUCTIONS :-

Shuttering :

1) Ensure the approved Good for Construction, R.C.C. & Architectural drawing with
revision status.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/312/REV-0
Page : 2 of 6

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


TITLE :
RCC SLAB FOR RESIDENTIAL PROJECT

2) Making of ply for beam bottom & sides of beam. Beam bottom is made with 12mm
P.C. Ply with two Nos of 4”x1 ½” wooden Patti. Beam side is made with 12mm
P.C.Ply as required size in drawing with 4”x1 ½” batten at 10” c/c along length &
both end in width.

3) Level mark on column for fixing beam bottom as per floor height mention on
drawing.

4) Topi of beam bottom fixed over column as per req. depth of beam & than beam
bottom rest over them with vertical props support @ 2’ c/c. wooden chavi 4”x3”
placed as cantilever if projection of Chajja is required.

5) Inner beam side erect over beam bottom with the help of nails. Making sides are
also placed over cantilever chavi 4”x3”, if projection is required.

6) Span is placed @ 2’0” c/c as per concreting thickness of room size & span edge rest
over 4”x3” wooden chavi with vertical M.S.Props at 2’0” c/c.

7) Now wooden Patti 4”x1 ½”x8’ long at 10” c/c is placed across the span, than P.C.
Ply is laid over with nails as per size of rooms. We should take care that there
should be no gap between two ply. Diagonal, size of room, thickness of concrete for
slab & beams are checked by Sr. Engineer, Surface of ply cleaned by Vacuum
cleaner & lubricant apply. Now clearance given to reinforcement contractor for
laying steel.

8) After laying steel, outer side of beam is fixed with the inclined supported of 4”x1
½”, wooden Patti in center & top. Chajja side is also fixed with making Ply &
supported given from cantilever wooden chavi. Outer line is checked properly with
the help of linedoori.

9) Beam bottom is clamped with shikanja & middle top portion is supported by
wooden Patti & 4”x1 ½” taking support from span chavi.

10) Outer portion of M.S. props is braced by 2”dia. M.S. Pipe with the help of swing
coupler.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/312/REV-0
Page : 3 of 6

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


TITLE :
RCC SLAB FOR RESIDENTIAL PROJECT

11) All column junctions are closed properly in shape, size & clamped by shikanja
all around.

12) Remove the excess shuttering materials stacked below the slab level.

13) Now slab is ready for casting.

Reinforcement:

1) Reinforcement is cut & bend in steel yard as per required size & position. Specified
in RCC Drawing.

2) Cut & bend steel is placed over slab by manually or by crane. Tagging start by
binding wire with proper placement of steel. Ring is also provided for Beams &
columns as specified.

3) Cover for reinforcement is provided for slab, beam, column, as specified in


drawing.

4) Steel Chair is provided over bent up & double Zali for proper position of
reinforcement.

5) Surface cleaned after completing reinforcement by Vacuum cleaner.

6) Slab reinforcement is checked by Sr. Engineer & R.C.C. Consultant. Consultant


issued N.O.C. with note of rectification if any for placing concrete.

7) Now we can pour the concrete in slab, beam, and chajja after rectification done.

Concreting:

1) Before starting concreting, we check the condition of R.M.800 mixer, lift hoist &
concrete pump. Diesel & Oil is filled if machine is diesel.

2) One mason with Randha, Patti, spatula is required for finishing concrete surface.

3) Vibrator of needle 40mm dia. & 60mm dia. are kept over slab with one stand by.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/312/REV-0
Page : 4 of 6

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


TITLE :
RCC SLAB FOR RESIDENTIAL PROJECT

4) Concrete filling level is marked over beam side & column for maintaining surface.
Concrete filling Kanda is also provided to mason for checking randomly.

Concreting with Mixer & Hoist:-

1) Mix design written over board near mixer.

2) Mix design set in panel for required weight of Aggregate, Cement, Sand & water.

3) Aggregate & cement placed into mixer manually, till getting correct required at
display, mixer takes water automatically. Admixture placed manually by
measuring Jar.
4) Concrete is mixed & unloaded in suit of lift & concrete lifted through hoist & dump
in tray over the surface of slab.

5) Concrete is transported at required place with the help of wheel barrow. Wheel
barrow runs over the surface of making ply side laid up to required position.

6) Concrete placed in slab & beams are vibrated & mason level the surface.

CONCRETE WITH TRANSIT MIXER & CONCRETE PUMP:-

1) Concrete grade & quantity is ordered to R.M.C. Plant one day before & concreting
time decided by R.M.C. plant & site incharge mutually.

2) Diesel & oil of pump checked properly.

3) Pipe line lay up to the required position of slab, with proper support.

4) Cement slurry passed over concrete pipe before just starting concrete.

5) Concreting carrying through transit mixer is delivered in concrete pump, Bucket &
than pumped it to require level. Concrete pipe can moved anywhere with the help
of additional pipe, bends & clamp.

6) Concrete vibrated by vibrator with needle 40mm dia. & 60mm dia. Surface leveled
by mason with Patti & trowel. After completing the concrete Ball Pass process is
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/312/REV-0
Page : 5 of 6

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


TITLE :
RCC SLAB FOR RESIDENTIAL PROJECT

done for cleaning pipe line & Pump Hopper with the help of Air pressure or water
pressure.

7) Cube cast 6 nos. with tamping 16 times for each layer & finished with trowel. &
Coding done as date of casting, Grade of concrete, Location of the structure.

8) Surface cleaned after concreting.

9) Entry of the slab completion to be recorded in M & M register-QAD 702.

DESHUTTERING, CURING, HACKING, AND CLEANING:-

1) Deshuttering starter as per instruction issued by R.C.C. Consultant.

2) If honey comb seen than it finished by cement, trowel as per S.I. instruction.

3) Watta is making over slab next day & ponded with water for 14 to 28 days.

4) Hessian cloth provided over vertical surface of beam after deshuttering.

5) Hacking should done in specified area at 50 nos /sq. ft.

6) Deshuttering material stacked & surface cleaned properly.

7) Water sprinkling just after concrete set during casting of slab for rounding surface
cracks.

B) ENVIRONMENT:-

1) Open Cement bag by removing stitches & change directly in beaching / mixing
plant to prevent west of cement.

2) Do not throw / drop cement bags to prevent air pollution by dust severation.

3) P.U.C. Checked of all vehicle enter in premises.

4) Do not use Water pipe having any leakage / damage & prevent west of water.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/312/REV-0
Page : 6 of 6

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


TITLE :
RCC SLAB FOR RESIDENTIAL PROJECT

5) Water drain should not leak.

6) Store empty cement bags separately for appropriate disposal of reuse.

7) Use Hessian cloth to cover the concrete surface to reduce evaporation loss.

8) Spilled & west concrete should be used for temporary structure.

9) Use sign board for awareness for environment.

C) HEALTH & SAFTY:-

1) Use Helmet, safety shoes, Gum boot, Rubber Hand Gloves & safety Belt at height.

2) Ensure that placing of concrete in proper sequence.

3) Always use good quality ladder.

4) Use of safety net, if a spacing in the slab.

5) Keep the area clean from iron bar & wooden pieces.

6) Proper sanitation provided.

7) Use earplug by vibrator operator.

8) Use industrial plug for temporary electric connection.

9) Use proper Barricading for duct area.

10) Use sign Board for awareness for safety.

11) Outer portion of slab is barricading by ropes.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/313/REV-0
Page : 1 of 7

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


TITLE :
RCC SLAB FOR COMMERCIAL PROJECT

A) QUALITY

1. SCOPE :-

Application for all Commercial Building for Slab.

2. EQUIPMENTS :-

R.M.800 Mixer or Batching plant with transit mixer or concrete out sources from
supplier.

1) Concrete pump with all accessories of pipes.

2) Dumpy level.

3) Tower Crane.

4) Vibrator with needle of 40mm dia. & 60mm dia.

5) Concrete Breaker 10kg.

6) Steel bar Cutting & Bending machine, hand cutter machine.

7) Measuring tape 30mtr. 50mtr.

8) Shuttering material like:- M.S. Props 4mtr & 3mtr, Span 2.4mtr to 4.0 mtr, Cup lock
(Vertical 3mtr, horizontal 1.2m, horizontal 2.4m), Base Plate, Stirrup Head 2’0”,I-
section 125x65 mm, I-section 100x50mm, M.S. sq. pipe 50m x 50m, Joint channel
called shoulder, Tie rod with nut, coupler, 50mm dia. M.S. Round pipe, M.S. Clamp
2’6” & 3’0”, Ton Buckle, Nails 1 ½”, 2 ½”, 3”, 12 mm P.C. Ply, Wooden Chavi
3”x4”x5’, Lapha 4”x1 ½”x3”, Lubricant, Wooden Patti 4”X1 ½”X8’.

9) Spade, Pan, Plumb, Right Angle, Trowel, Linedoori, Curing Pipe 1” dia., Hessian
Cloth, Tarpolin Sheet, Concrete cover block,
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/313/REV-0
Page : 2 of 7

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


TITLE :
RCC SLAB FOR COMMERCIAL PROJECT

3. RESPONSIBILITY :-

1) Site Incharge
2) Sr. Engineer

4. WORK INSTRUCTIONS :-

Shuttering (Form & Fast Work):

1) Ensure the approved Good for Construction, R.C.C. & Architectural drawing with
revision status.

2) Load design calculated & plan to design safe shuttering arrangement. Arrangement
of cuplock should be in the pattern of 1.2x1.2mtr. Or 1.2x2.4mtr. Or 2.4x2.4mtr. is
decided on that load calculation. Spacing & placing of M.S. props is also decided by
calculating safe load design calculation. Get approved from V.P./C.E./E.E.

3) List of material required is calculated & write in tabular form. S.I. discussed with
Store Incharge & C.E./E.D. for availability of materials / equipment as per required
barchart & work schedule. Then, S.I. finalise the list of materials / equipment
supplied by store & requisition submitted for purchasing balance
materials/equipments. All these exercise done during mobilization period of
project.

4) Making of ply start for beam bottom & side of beam. Beam bottom is made with
12mm P.C. Ply with battens of 4”x1 ½” @ 10” c/c. Beam side is made with 12mm
P.C. Ply as required size in drawing with 4:x1 ½” batten @ 10” c/c along length &
both end in width.

5) Datum Level mark on column for fixing beam bottom as per floor height mention
in drawing.We should ensure the beam face over respective column as per room
dimensions with respect to RCC & Architctural drawings.

6) Topi of beam bottom fixed on column as per required depth of beam & than beam
bottom rest over them with vertical props supports @ 2’ c/c. If there is projection of
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/313/REV-0
Page : 3 of 7

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


TITLE :
RCC SLAB FOR COMMERCIAL PROJECT

chajja or beam bottom width is more than 1’0”, than beam bottom along with
chajjais placed over adjutant two span with cantilever, wooden chavi of 4”x3”x5’
length. Both end of span is supported by M.S. Props.

7) Couplock is placed in the size 1.2x2.4 meter size if concrete thickness is up to


300mm depth. If thickness is more than 300mm than couplock arrangement is made
in 1.2x1.2 meter square.

8) Couplock is placed as per sequence of thickness of slab in alignment. We add


additional vertical of height 0.5 mtr or 1.00 mtr as per requirement of floor height.
Now stirrup head is placed over top of vertical. I-section is placed into stirrup head
cap in such a way that I-section (125X65mm) or (150X75mm) should along the
length 2.4m horizontal.50mm sq. M.S. pipe is placed across the I-section @ 10” c/c.
12mm P.C. Ply is placed over pipe. Ply are fixed by nails over batten patti 4”X1
1/2”. Concrete filling level is maintained by keeping adjustment of stirrup head
with the help of thread.

9) Inner beam side erect over beam bottom with the help of nails. Making sides are
also placed over cantilever chavi 4”x3”, if projection is required for chajja.

10) Gabdi of column & beam junction closed properly. Gabdi of slab also set by ply. We
should insure that ply junction should have miner gap. Gabdi of column is clamped
by shoulder & tie rod.

11) Lubricant is applied after cleaning ply surface.

12) Beam bottom & side is clamped with Shikanja & middle & top portion is supported
by wooden Patti of 4”x1 ½” taking support from cantilever chavi.

13) M.S. Props is braced by 2” dia. M.S. pipe with the help of swing coupler.

14) Remove the excess shuttering materials spread below slab.

15) Now slab is ready for reinforcement.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/313/REV-0
Page : 4 of 7

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


TITLE :
RCC SLAB FOR COMMERCIAL PROJECT

Reinforcement:

1) Reinforcement is cut & bends in steel yard as per required size & position
mentioned in RCC Drawing.

2) Cut & bend steel is placed over slab by manually or by crane. Tagging start by
binding wire with proper placement of steel. Ring is also provided for Beams &
columns as specified.

3) Cover for reinforcement is provided for slab, beam, column, as specified in


drawing.

4) Steel Chair is provided over bent up & double Jali for proper position of
reinforcement.

5) Surface cleaned after completing reinforcement by manually or Vaccum cleaner.

6) Slab reinforcement is checked by Sr. Engineer & R.C.C. Consultant. Consultant


issued N.O.C. with note of rectification if any before placing concrete.

7) Take the JMR of Reinforcement for 1st slab only with estimation division & confirm
the estimated qty to proceed for rest of Slab.

8) Now we can pour the concrete in slab, beam, and chajja after rectification done.

Concreting:

1) Before starting concreting, we check the condition of R.M.800 mixer, lift hoist &
concrete pump. Diesel & Oil is filled if machine of diesel.

2) One mason with Randha, Patti, spatula is required for finishing concrete surface.

3) Vibrator of needle 40mm dia. & 60mm dia. is kept over slab with one stand by.

4) Concrete filling level is marked over beam side & column for maintaining surface.
Concrete filling Kanda is also provided to mason for checking randomly.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/313/REV-0
Page : 5 of 7

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


TITLE :
RCC SLAB FOR COMMERCIAL PROJECT

Concreting with Mixer & lift Hoist:-

1) Mix design written over board near mixer.

2) Mix design set in panel for required weight of Aggregate, Cement, Sand,
Admixture & water.

3) Aggregate & cement placed into mixer manually, till getting correct required
display, mixer takes water automatically admixture is placed manually by
measuring Jar.

4) Concrete is mixed & unloaded in suit of lift. Concrete lifted through hoist &
dump in tray over the surface of slab.

5) Concrete is transported at required place with the help of wheel barrow. Wheel
barrow runs over the surface of making ply side laid up to required position.

6) Placed concrete in slab, beams are vibrated & mason level the surface.

CONCRETEING WITH TRANSIT MIXER & CONCRETE PUMP:-

1) Concrete grade & quantity is Send to R.M.C. Plant one day before & concreting
time decided by R.M.C. plant & site incharge mutually.

2) Diesel & oil of pump checked properly.

3) Pipe line lay up to the required position of slab, with proper support.

4) Cement slurry passed over concrete pipe before start concreting.

5) Concreting carrying through transit mixer is delivered in concrete pump, Bucket &
than pump it to required level. Concrete pipe is moved anywhere with the help of
additional pipe, bends & clamp.

6) Concrete vibrated by vibrator with needle 40mm dia. & 60mm dia. Surface leveled
by mason with Aluminum Patti & trowel.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/313/REV-0
Page : 6 of 7

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


TITLE :
RCC SLAB FOR COMMERCIAL PROJECT

7) After completing the concrete Ball Pass process is done for cleaning pipe line &
Pump Hopper with the help of Air pressure or water pressure.

8) Cube cast 6 nos. with tamping 16 times for each layer & finished with trowel.

9) Surface cleaned after concreting.

10) Entry of the slab completion to be recorded in M & M register-QAD 702.

DESHUTTERING, CURING, HACKING, AND CLEANING:-

1) Deshuttering start as per instruction issued by R.C.C. Consultant.

2) If honey comb seen than it finished by cement, trowel as per S.I. instruction.

3) Watta is making over slab next day & ponded with water for 14 to 28 days.

4) Hessian cloth provided over vertical surface of beam after deshuttering.

5) Hacking should done in specified area at 50 nos /sq. ft.

6) Deshuttering material stacked & surface cleaned properly.

7) Water sprinkling just after concrete set during casting of slab for arounding surface
cracks.

B) ENVIRONMENT:-

1) Cut Cement bag by removing stitches & change directly in beaching / mixing plant
to prevent west of cement.

2) Do not throw / drop cement bags to prevent air pollution by dust severation.
3) P.U.C. Checked of all vehicle enter in premises.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/313/REV-0
Page : 7 of 7

QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF


TITLE :
RCC SLAB FOR COMMERCIAL PROJECT

4) Do not use Water pipe having any leakage / damage & prevent west of water.

5) Water drain should not leak.

6) Store empty cement bags separately for appropriate disposal of reuse.

7) Use Hessian cloth to cover the concrete surface to reduce evaporation loss.

8) Spilled & west concrete should be used for temporary structure.

9) Use sign board for awareness for environment.

C) HEALTH & SAFTY:-

1) Use Helmet, safety shoes, Rubber Hand Gloves & safety Belt at height.

2) Ensure that placing of concrete in proper sequence.

3) Always use good quality ladder.

4) Use of safety net, if a spacing in the slab.

5) Keep the area clean from iron bar & wooden pieces.

6) Proper sanitation provided.

7) Use earplug by vibrator operator.

8) Use industrial plug for temporary electric connection.

9) Use proper Barricating for excavated pit.

10) Use sign Board for awareness for safety.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/314/REV-0
Page : 1 of 4
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
BRICK WORK.

A) QUALITY

1.0 SCOPE:-

Applicable for Brick Work for Residential, Commercial & Industrial


Projects.

2.0 EQUIPMENT:-

Farma, Tray (6’x4’x0’8”=16 cft), Spades, Mortar Pan, Line Dori, Plumb,
Rt. Angle, Tape, Scaffolding material, Planks, Chisels, Trowel, Drilling
machine, Curing Pipe, Primer, Hold fasts, etc.

3.0 RESPONSIBILITY:-

1) Site Incharge/QA
2) Site Supervisors

4.0 WORK INSTRUCTIONS:-

1) Ensure the approved working drawing with revision status is


available & read.

2) Get the entire floor clean & hack (min 50 Nos/sft) column, beam,
slab, etc. from R.C.C. contractor.

3) Ensure the materials required for activity is received & duly


approved.

4) Soak the brick in advance

5) Remove the loose material & water the surface where brick work is to
be erected.

6) Lay the first layer (perni) w.r.t. drawing.

7) Dimensions of rooms, diagonal, Rt. Angles, off sets, if any are to be


checked at perni layer only.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/314/REV-0
Page : 2 of 4
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
BRICK WORK.

8) Adjust, if any, to achieve Rt. Angle and diagonals are perfectly to be


done to short walls & confirm that chiseling is avoided of any
structural member

9) Check the locations, sizes of doors & openings considering plaster


(Gypsum) margins of 35 to 40 mm.

10) Get the “Perni” layer checked by QA & obtain NOC


(QAD/M&P/501).

11) Apply rich mortar (1:4) on column face which has to be in contact
with brick work for proper bonding.

12) Execute the brick work layer by layer up to window cill level.

13) Check each layer of brick work for line, level & plumb.

14) Ensure the joints of brick work are staggered & uniform (15mm).

15) Use following material for dry mix (should not more than 2 bags at a
time)

 Cement – 1 bag
 Fly Ash – 1 bag (30 kg)
 Crush Sand – 15 cft (farma 2’6”x2’6’x1’2”=7.5 cft x 2)

16) Take part of dry mix and pour water to get workable mortar.

17) Use the wet mortar within 60 min.

18) Rake the joints after every 3-4 layers, reuse the splitted mortar.

19) Check the cill/lintel level w.r.t. beam bottom.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/314/REV-0
Page : 3 of 4
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
BRICK WORK.

20) For 4” thick brick wall cast R.C.C. patli of 4” thick at every 1m
height.

21) Continue brick work above sill & keep window opening as per
drawing considering margin of plaster/gypsum (25 mm).

22) Cast the lintel @ 7’3” height or specified.

23) Lintel should have minimum 9” bearing on brick wall. If lintel is


flush to column on one side, lintel bars are required to be grouted in
column.

24) Fix the khadi in mortar for the joint between beam & the last layer of
brick work and vertical face of column & brick work.

25) Clean the entire floor.

26) Cure the brick work for 15 days atleast 3-4 times a day.

27) Daily reconcile the material used for the quantum of work done w.r.t.
constant given in estimate.

28) Site Incharge to prepare the material consumption statement for the
1st floor compare with the estimate and further get it approved if
any correction is required.

29) Get the written clearance from HOD Estimation (EST/M&P/501) for
material consumption.

B) ENVIRONMENT:-

1) Do not allow sand to spread around and waste.

2) Do not waste cement due to mishandling of cement by drop /


throws.

3) Do not waste the water used for curing.

4) Stop leakage through water pipes and filling of drum/tanks.

5) Spread some sheets below the work place for collecting the mortar
falling down for reuse.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/314/REV-0
Page : 4 of 4
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
BRICK WORK.

C) HELATH AND SAFETY:-

1) Mixing of cement mortar should be done on proper platform.

2) Sand should be stacked properly and the sides to be covered by sand


bags or bricks/Blocks partition.

3) Use safety Helmet, Shoes, Rubber Hand Gloves, Mask and Safety
Belt.

4) Ensure proper barricading around material lift machine.

5) Ensure lifting machines are not overloaded, & brakes are intact.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/315/REV-0
Page : 1 of 4
QEHS WORK INSTRUCTIONS FOR INTERNAL GYPSUM
TITLE :
FINISH PLASTER.

A) QUALITY

1.0 SCOPE:-

Applicable for internal walls & celling for all rooms except the kitchen & toilet
dado areas.

2.0 EQUIPMENT:-

1) M.S Farma of 3’0” & 16” ht as shown in figure.


2) Level pipe.
3) Line dori.
4) 5 mtr. Tape
5) RT. Angle ( Big size )
6) 8’, 6’ 4’0” length.A/U bottom patti.
7) Plastic tins.
8) Empty drums for water storage.
9) M.S ghodees.
10) M.S / Bamboo planks.
Φ
3.0 RESPONSIBILITY:-

1. Site Incharge / QA.

2. Site Engineer / supervisor.

4.0 WORK INSTRUCTIONS:-

1) Ensure the approved working drawing with revision status is available


& read.

2) Ensure that commencement of Gyp should be minimum 1 month after


completion of masonry.

3) Check the entire floor should be neat & clean after masonary work.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/315/REV-0
Page : 2 of 4
QEHS WORK INSTRUCTIONS FOR INTERNAL GYPSUM
TITLE :
FINISH PLASTER.

4) Check the opening kept for main door , Bed room doors , terrace F.D
toilets doors , & all windows are correctly kepts as per the chart
prepared by site incharge e.g.

 For main door 45” wide – opening size in BBM – 46”.


 For int. bedroom doors 35 ½”wide – opening in BBM – 36 ½”.
 For toilet doors 31 ¼” wide – opening in BBM – 33” opening after
plaster – 32”
 For window subframes , keep 1” extra opening size in width & hight.
 For F.D. keep – 1” extra in width, & height.

5) Execute the thiyya work by using M.S farma made especially for Gyp.

6) Check all the thiyyas given by Gyp agencies by using the farma only.

7) Set the right angles for thiyya are as follow.

 Set the right angle w.r.t long wall & ie Dinning passage wall (Base
line.)
 Set the right angle for all the bedrooms, toilets. Kitchen. Etc w.r.t to
base line.
 Mark all the thiyyas at 16” ht. ie farma ht level.
 Extend all the thiyyas up to 8’0” ht called as Dhaddas.
 Start all concealed electrical works.
 Check all Ele. Concealed conduits, joints in BBM are filled with
morter.
 Apply 1’-0” ht smooth ghotai plater at skirting level as shown.
 Ensure all the Ele. Points are done as per the drg & Specification.
 Ensure all Electrical point heights as per the sample flat done at site.

1’-0”(on wall) 3" ( On slab)


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/315/REV-0
Page : 3 of 4
QEHS WORK INSTRUCTIONS FOR INTERNAL GYPSUM
TITLE :
FINISH PLASTER.

 Check the P.V.C chicken mesh 6” wide patta used for all R.C.C &
masonry joints & over the concealed conduits.
 Ensure tachya 50 no. / Sft. for beam , column, ceiling, loft/lintel cills.
Before calling QAD. For NOC.
 Get the NOC from ( QAD/Gyp/501) for the commencement of Gyp.
 Check the Gyp cutting on wall 7” from slab level to avoid excessive
but finishing /waviness in Buttfinishing.
 Check all the dhars made rounded by using farmas it should be 5mm
rounded.
 Use kerakol P-5 chemical for ceiling before application of Gyp.
 Kerakol P-5 chemical to be used 1:1:3 – mix 1part chemical +1part
cement +3parts of water application by brush to avoid debonding of
ceiling Gyp.
 Keracol has suppose to give Guarantee certificate of chemical
bonding.
 Ensure the consumption. - 1.0 lit / 165 sft.
 Check the reference level marked on beam 9” below the ceiling level.
 Check rest ceiling gyp done in line not in level tube & should not
found any waviness by visual.
 Check for maindoor & bedroom doors , opening one side & top is
finished in Gyp to fix the wooden door frame.
 Check the ceiling Dhadda at corners with reference to level marked
on Beam.
 Check the kutch of ceiling & wall, should not found any waviness.
 Gyp at ceiling min 1’-0” patta should be in perfect level.
 Keep the all toilets /passages ceiling Gypsum should be in perfect
level b-coz of the small areas.
 Carry out toilet ceiling and wall gypsum only after completion of
Dado & floor only to maintain the accuracy in line / level.
 Carry out kitchen Dry balcony side wall after completion of kitchen
otta Dado.
 Check all the kutch perfectly done in right angle & should not found
waviness.
 Carry out the Butt finishing work 1 week after completion of skirting.
 Use Farma for Butt finishing to maintain perfect 4mm Tile projection
all over.
 Try to maintain loft patta 5” wide uniformly all over.
 Try to maintain vertical jams of window 5” wide all over.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/315/REV-0
Page : 4 of 4
QEHS WORK INSTRUCTIONS FOR INTERNAL GYPSUM
TITLE :
FINISH PLASTER.

 Complete 100% Gypsum except Toilet & then only allowed to go to


next flat.
 Ensure the cleaning is being done by Gyp. Contractor on day to day
basis.
 Keep & check the billing system set at site it should be only after
completion of unit ie 75% & 25% kept for Butt finishing/Toilet &
kitchen balcony work.
 Check the highrise qty v/s actual consumptions flat wise to ensure
the thickness maintained.
 Record details in m&m in process activity registered ( QAD/702)
duly signed by QA/SI

1.0 ENVIRONMENT :

1) Preferably, always use aluminum / steel ladder.


2) When bamboo / wooden ladder is used, it should be preserved well for
longer life and safety.
2.0 HEALTH AND SAFETY :
ENSURE FOR FOLLOWING:-
1) Use of safety belt, helmet with chin strap on while working.
2) Always use good quality ladder.
3) Use of safety net.
4) Use proper PPE’s and unwanted people should not enter near working area.
5) Barricade the area below the place of work.
6) Post guards at areas of works.
7) Safety checks are carried out before height work activity.
8) Ensure the fall protection system is planned before starting the work.
9) Use height work permits.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/316/REV-0
Page : 1 of 3

TITLE : QEHS WORK INSTRUCTIONS FOR INTERNAL PLASTER.

A) QUALITY

1.0 SCOPE:-

Applicable for Internal Wall etc.

2.0 EQUIPMENT:-

 Farma ( 7.50 Cft ) ( 5.0 Cft )


 Tray. ( 6’ x 4” x 0’ x 8” )
 Spades.
 Ghamelas.
 Line Dori.
 Plumb.
 Rt angle.( Big small)
 5 mtr. Tape.
 Scaffolding material ( cuplock or bamboo )
 Plank.
 Chisel.
 Trowel.
 Randha.
 6’ 0” length aluminium box.
3.0 RESPONSIBILITY:-

1. Site Incharge / QA.

2. Site supervisor.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/316/REV-0
Page : 2 of 3

TITLE : QEHS WORK INSTRUCTIONS FOR INTERNAL PLASTER.

4.0 WORK INSTRUCTIONS:-


PLASTERING WORK :

a) Internal Plastering :

I ) Procedure :

After completion of 100% Brick Work :

 Floor should be neat & clean.


 Sieve the sand and have the depose at the works place in advance .
 Cure the surface 24 hours before plastering.
 Fix Chicken mesh in between RCC & Brick work joints.
 Make thiyyas to keep thickness below 20 mm and thiyyas in plumb & right angle. (
Refer Drg. enclosed)
 Check electrical point, plumb and level of door & frame and window.
 Check the plaster in line level plumb & right angle finishing of plaster surface with
neeru with minimum thickness.
 Cutting of plaster at skirting level in straight line level and ht 8” above slab level.
(Refer Drg. enclosed.)
 All edges should be sharp / round.
 Clean the door and windows.

 For 1st coat ( ie. Tar plaster )


 Cement – 1 bag.
 Flyash - ½ bag.
 Crush sand – 7.50 Cft. Farma size – ( 2’ – 6” x 2’- 6” x 1’ - 21/2” )
 Use tray for mortar mixing ( 6’ – 0” x 4’ – 0” x 0’ – 8” )

 For 2nd coat – use following dry mix.

 For 2nd coat.


 Cement – 1 bag.
 R/sand – 5 Cft.
 Master plaster chemical – 150 ml / bag.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/316/REV-0
Page : 3 of 3

TITLE : QEHS WORK INSTRUCTIONS FOR INTERNAL PLASTER.

B) ENVIRONMENT:-

 Do not allow sand to spread around & waste.


 Do not waste cement due to mishandling of cement drop/throws.
 Do not waste the water used for curing.
 Stop leakages through water pipes & fitting of drum / tanks.
 Spread some sheets below the work place for collection the mortar falling
down for reuse.
 Use mask for the plaster mason.
 Cover the ext. surface area by tarpaulin / plastic / kilthan to avoid spreading
of cement & Crushsand.

C) HEALTH & SAFETY:-

 Use safety helmets for the working masons, M/C & F/C.
 Use safety belts for persons working on scaffolding.
 Use safety jackets for mason & M/C.
 Use safety shoes for the mortar mixing male coolie.
 Use hand gloves for mason , mortar mixing m/c & who are handling the
mortar pans.
 Check the stability of M.S scaffolding tie it every alternate floor by 2” Φ M.S
bracing pipe & coupler.
 Tie the bamboo / m.s plank used by katya.
 Tie it M.S / Bamboo planks used for working platform by kathya ensure the
tying done correctly or not.
 Ensure the safety net provide at different levels ie 2nd floor , 5th floor , 8th floor
& 11th floor level.
 Ensure proper bamboo/G.I sheet baricatting around lift M/C.
 Ensure lifting machines are firmely fixed with prop & sand bags to avoid
toppling.
 Ensure lifting machines are not overloaded & brakes are in intact.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/316/REV-0
Page : 1 of 4
QEHS WORK INSTRUCTIONS FOR EXTERNAL SAND FACE
TITLE :
PLASTER.

A) QUALITY

1.0 SCOPE:-

Applicable for external sides, all ducts above terrace , Dry balconys ,Entire
parking column & walls etc.

2.0 EQUIPMENT:-

 Farma ( 7.50 Cft ) ( 5.0 Cft )


 Tray. ( 6’ x 4” x 0’ x 8” )
 Spades.
 Ghamelas.
 Line Dori.
 Plumb.
 Rt angle.( Big small)
 5 mtr. Tape.
 Scaffolding material ( cuplock or bamboo )
 Plank.
 Chisel.
 Trowel.
 Randha.
 6’ 0” length aluminium box.
3.0 RESPONSIBILITY:-

1. Site Incharge / QA.


2. Site supervisor.

4.0 WORK INSTRUCTIONS:-

 Use 8” wide ½ x ½” size G.I chicken mesh for all RCC & masonary joints.
 Use 1 ½” G.I nails & ¾” G.I washers for fixing chicken mesh.
 Check the stability of M.S Scaffolding as well as bamboo scaffolding.
 If M.S scaffolding is used, provide cross support 2” Φ M.S pipe bracing with
coupler for alternate floor to avoid the lateral movement.
 Equipment - Ensure the requirement of cuplock in the ratio of q -
1: 2.5: 1.5
10’0” 4’0” 8’0”
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/316/REV-0
Page : 2 of 4
QEHS WORK INSTRUCTIONS FOR EXTERNAL SAND FACE
TITLE :
PLASTER.

 If scaffolding is used provide the addi hole at skirting level only.


 Make 3” depth ie half of the wall thickness for next level addis.
 Check the line doris fixed at each corners & min 1 line at plain surface to
maintain the plaster thickness & level.
 Ensure ghadai for beam / elevational feature if any.
1) Check the all bicks joints , Brick & RCC joints are filled by rich morter before
fixing the chicken mesh.
 Obtained the NOC from QAD side wise / stage wise.
 Check the planks used for woring platform are tied with katya.
 Cure the surface 1 day before.
 Use pharma for ext. plaster ( for 1st coat 7.32 Cft, 2nd coat - 5.0 Cft )
 Use following material for dry mix. ( Should not more than 2 bags of cement at
a time.)

 For 1st coat ( ie. Tar plaster )


 Cement – 1 bag.
 Flyash - ½ bag.
 Crush sand – 7.50 Cft. Farma size – ( 2’ – 6” x 2’- 6” x 1’ - 21/2” )
 Use tray for mortar mixing ( 6’ – 0” x 4’ – 0” x 0’ – 8” )

 For 2nd coat – use following dry mix.

 For 2nd coat.


 Cement – 1 bag.
 R/sand – 5 Cft.
 Master plaster chemical – 150 ml / bag.

 Use the wet mortar within 60 min.


 Keep & ensure the gap between 1st coat & 2nd coat is not more than 3 days.
 Use empty cement plastic bags for collecting the dropping mortar & reuse for
the plaster.
 Ensure & check the consumption of Raw river sand 10 Cft /Brass for 2nd coat
plaster.
 Cure the plastered surface for 15 days & 4 times a day.
 Ensure the plastering is being done as per the approved architectural
elevational drg & details in first coat.
 In 1st coat check the uniformity of roughness /mark done, it should be
horizontal & in waves form like - ≈≈≈≈≈≈
 Check the uniformity of sponge, ( as per sample approved)
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/316/REV-0
Page : 3 of 4
QEHS WORK INSTRUCTIONS FOR EXTERNAL SAND FACE
TITLE :
PLASTER.

 Check the Grooves provided for the plain surface & at two level only.
 Check the depth of groove. ( should not more than 5mm) 1 at 6” above cill level
& 2nd at 6” below lintel.
 Check the finishing & level of the groove, It should be neatly finished in cement
past.
 For the eye level terrace maintain 6” cutting of plaster above normal slab for
waterproofing work.
 In any case do not raise the plaster thickness for patta more than 1” thick.
 For box type window cill , check the level of outside patta & subframe level as
per sketch given. IPS plaster – It should be ¾” drop & 1” slope towords outside
in BBM & RCC. As per sketch -

 Ensure & Check the panipattis of size 1 ½” x 5 mm project for all the external
side openings.
 Record details in M&M in process activity registers ( QAD / 702 ) duly singed
by QA / S.I.
 Site incharge to prepare the material consumption statement for side wise &
compare with the estimate & further get it approved if any correction is
required.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/316/REV-0
Page : 4 of 4
QEHS WORK INSTRUCTIONS FOR EXTERNAL SAND FACE
TITLE :
PLASTER.

B) ENVIRONMENT:-

 Do not allow sand to spread around & waste.


 Do not waste cement due to mishandling of cement drop/throws.
 Do not waste the water used for curing.
 Stop leakages through water pipes & fitting of drum / tanks.
 Spread some sheets below the work place for collection the mortar falling
down for reuse.
 Use mask for the plaster mason.
 Cover the ext. surface area by tarpaulin / plastic / kilthan to avoid spreading
of cement & Crushsand.

C) HEALTH & SAFETY:-

 Use safety helmets for the working masons, M/C & F/C.
 Use safety belts for persons working on scaffolding.
 Use safety jackets for mason & M/C.
 Use safety shoes for the mortar mixing male coolie.
 Use hand gloves for mason , mortar mixing m/c & who are handling the
mortar pans.
 Check the stability of M.S scaffolding tie it every alternate floor by 2” Φ M.S
bracing pipe & coupler.
 Tie the bamboo / m.s plank used by katya.
 Tie it M.S / Bamboo planks used for working platform by kathya ensure the
tying done correctly or not.
 Ensure the safety net provide at different levels ie 2nd floor , 5th floor , 8th floor
& 11th floor level.
 Ensure proper bamboo/G.I sheet baricatting around lift M/C.
 Ensure lifting machines are firmely fixed with prop & sand bags to avoid
toppling.
 Ensure lifting machines are not overloaded & brakes are in intact.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/317/REV-0
Page : 1 of 4

TITLE : QEHS WORK INSTRUCTIONS FOR PLUMBING WORKS.

1.0 QUALITY :

Internal Concealed Plumbing

 Ensure the relevant Drawing is available & read.


 Mark lines on walls 24” line from FFL.
 Check any extra amenity changes.
 Cut plaster wall by cutter only.
 Fix PPRC pipe on wall with 3” plumbing nails in line, level and
plumb
 Keep the Hot Water Line on left side and Cold Water Line on right
side.
 Check the height of outlet w.r.t. FFL
WHB inlet – 400mm, Flush Valve - 1000 mm, Shower – 1980mm,
Mixer – 825mm, Single Level Divertor – 1050mm and Health Facad –
300 mm.
 Check the pipes for pressure testing 7 Kg/CM2
 Finish the cut grooves with cement mortar to flush with old plaster
and roughen the same.
 Fix Nahani trap in position.
 Fix Basin outlet from basin to nahani trap.
 Finishing of Nahani trap galla and check for water tightness.
 Fix W. C. outlet in position.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/317/REV-0
Page : 2 of 4

TITLE : QEHS WORK INSTRUCTIONS FOR PLUMBING WORKS.

1) Ensure that all duct plaster completed 100%.


2) Ensure that all scaffolding complete & safe for work.
3) Ensure the relevant drawings available.
4) Mark all vertical lines on wall in plumb.
5) Fix M. S. Saddle on wall at 3’ c/c.(Refer Sketch)

6) Fix PVC, Antisyphon Pipe, or white PVC downtake on M.S. Saddle


with GI ‘ U ’ clamp , all vertical lines are in plumb & provide Y or
T for at respective level for internal line connection.
7) Connect Toilet / Kitchen outlet to the downtake.
8) Ensure that 4” & 3” PVC vertical line should 1.2m above top terrace
with cowl.
9) Finish Gabadi work by rich mortar the plaster finish matched with
surrounding finish of gabadi.
10) Connect 4” WC line to drainage chamber , 3”water line to gulley trap
& storm water line to storm water chamber at ground floor level.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/317/REV-0
Page : 3 of 4

TITLE : QEHS WORK INSTRUCTIONS FOR PLUMBING WORKS.

11. Curing should done for gabadi finish work.


12. Provide stop cock for white PVC below 6” & near window at each
floor for maintenance purpose.
13. Provide plug to white PVC downtake end at 1st floor level.

C. P. Fittings :
 Check extra amenity if any.
 Fix C.P. fitting with Teflon tapes to proper points.
 Cover all fittings with Polythin bag after fixing.
 Flanges for all taps is MUST.
 Check CP fitting for water flow and clean the same.
 Check CP fitting for pressure 2.5 kg/cm2
 Cover all fitting with polythin bag after pressure testing
Sanitary Fittings :
 Check extra amenity if any.
 Fix all Sanitary wares in position, line & level.
 Check all joints for water tightness.
 Check all sanitary ware for its fixity.
 Record details are in M&M in Process Activity Register. (QAD/702)
duly signed by QA/S.I.

2.0 ENVIRONMENT:
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/317/REV-0
Page : 4 of 4

TITLE : QEHS WORK INSTRUCTIONS FOR PLUMBING WORKS.

 Proper planning, designing and execution of plumbing is must for


adequate supply of clean and potable water and efficient disposal of waste
to avoid loss due to wastage.
 All joints in plumbing lines and sanitary / drainage line should be leak
proof to avoid wastage and pollution.

3.0 HEALTH AND SAFETY :


 Sewage line should be laid smooth and with proper slope to maintain
Self – cleansing velocity.
 Sewage line should be away from water supply and drainage line.
 Use proper scaffolding for plumbing works at external walls. Use well tied
platforms for men & material use.
 Use safety helmet, safety belts and mask.
 Check barricading of duct area at ground floor while working.
 Ensure that proper illumination is available while working in confined
space, sewers. (use 24 volt lamp or below,
 Provide adequate ventilation for worker or separate blowers for confined
space.
 Ensure safety nets (fall protection arrangement) are in place before starting
work at height.
 Ensure ducts / shafts are covered properly after completion of the work.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/318/REV-0
Page : 1 of 5

TITLE : WORK INSTRUCTIONS FOR WATERPROOFING WORKS.

A) QUALITY

1.0 SCOPE:-

Applicable for all Residential /Commercial Buildings.

2.0 EQUIPMENT:-

Measuring tape, line dori, G.I socket 1 ¼” 5’0” 4.6 pipe (1 ¼”), Thapi,
Wooden floor, Randha, Plum bob, level tube, Morter, Farma – size
1:6,1:4, Aluminium patti, Curing pipe, Drum.

3.0 RESPONSIBILITY:-

1. Site Incharge
2. Site Engineer./superviser.

4.0 WORK INSTRUCTIONS:- O.H.W.T

i) Ensure the relevant drg. Is available & read for plumbing out
let & inlet.

ii) Preparation of surface & side wall. ie Removing all concrete


lumps & morter, haching work, Removing of ballies & cleaning
with wire brush – ( NOC From QA )

iii) Grouting & socketing if required. ( Champer portion.)

iv) Proper fixing & checking for inlet & outlet fixing as per drg. – (
NOC from QA)

v) Application of cement slurry on R.C.C walls & bottom of slab.

vi) Application of W/P plaster 1:4 cement morter. (W/P Compound if


required.)

vii) 15 to 20 mm metal in bottom & champar corner and finishing the


surface with cement ghotai .

1
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/318/REV-0
Page : 2 of 5

TITLE : WORK INSTRUCTIONS FOR WATERPROOFING WORKS.

viii) No W/P for bottom of top slab.

ix) Top of O.H.W.T slob to be finished with brick bat W/P .

x) After 12 hours started curing & fill up the tank with water in 3 to 4
days. 15 days check for any leakages.

B) U.G.W.T

1. After completion of Raft slab P.C.C ( Check for level.)

2. 100% cleaning of P.C.C top with water.( NOC from QA)

3. Fix rough shahbad tile of size 60 cm x 60 cm of comp. it required


projection of rough shahbad tile 6” outside the raft.

4. Grant the joint with cment slurry.

5. Seal the joint with 1:3 cement moter Add 15 mm metal.

6. Apply cement moter layer 25 mm thick in cement proportion (1:3).

7. Curing for 7 days.

8. After U.G.W.T , R.C.C 100% completed fixing of inlet & outlet in


U.G.W.T as per drg. (N.O.C. from QA )
9. Preparation of surface in side & outside of U.G.W.T ie cleaning,
Proper hacking , Removing ballies.

10. Proper cleaning at raft thickness & joint of bottom slab rough shabad
& paradi , joint above raft.

11. Fixing of rough shahbad in offset for raft & parade with cement pro
& seal the joint with cement mortar 1:3 with 15 mm metal.

12. Fix rough shahbad on vertical pardi with cement at 1 m hight only.

13. Seal the joint with cement ( 1:3) with 15 mm metal.

2
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/318/REV-0
Page : 3 of 5

TITLE : WORK INSTRUCTIONS FOR WATERPROOFING WORKS.

14. Grout the same with cement slurry.

15. Apply plaster coat in cement morter 1:4 on rough shahbad.

16. Seal the top of final layer with cement paste.( NOC From QA)

17. Curing for 7 days.

18. Record the details in M&M process activity register

C) TOILET W/P

i) 100% Cleaning of toilet slab ie & removing all debris of mortar /


nail/binding wire etc.
ii) Through cleaning with water. ( NOC from QA)
iii) 1” Spout provide.

iv) 15 mm to 20 mm thick cement mortar base coat at in 1:4 with slope


25mm in 3m towards nahani trap.

v) 3 days curing to base coat.

vi) Fixing of nahni trap W/C outlet & WHB outlet.( NOC from QA)

vii) Laying 4” bricks in slop 1:100 towords nahni trap.

viii) Fill up the joint with cement mortar 1:6 ( Farma size)

ix) Finish the top coat with 1:4 cement mortar continue top ghodi on
wall up to 1’0” hight above floor finish level.

x) Cure for 7 days by closing nahni trap outlet & by filling water.

xi) Record the details in M&M in process activity register ( QAD 102 )
daily sign by S.E , S.I , QA.

3
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/318/REV-0
Page : 4 of 5

TITLE : WORK INSTRUCTIONS FOR WATERPROOFING WORKS.

C) Terrace W/P

1) Remove the Debris & loose material From slab.

2) Clean the entire terrace slab. With water. ( NOC from QAD)

3) Mark the level on parapet wall on 2’0” hight.

4) Fix rain water pipe as per drg.

5) Fix line dori in slope 1:150 – 2 ½” thickness below rainwater outlet.

6) Lay 4” bricks on kodi in ring pattern in cement morter 1:4

7) Fill up the joint of bricks in 1:6 cement mortar.

8) Finishing top coat with 1:4 cement mortar & make up to 9” hight on
parapet on wall ie watta in cement ghotai. ( NOC from QAD )

9) Ensure that watta (ie joint of parapet & brick bat ) in 15mm metal in
1:4 cement morter.

10) Next day make kani dhar 9” above top finish coat in level.

11) Close the rain water opening & curing the terrace by ponding ( filling
water up to 6” min)

12) Record details are in M&M in process activity ( QAD /T ) Daily


signed by QA/SI.

B) ENVIORNMENT

1) Do not allow sand to spread around and waste.

2) Do not work cement due to mis handling of cement by dropping


/Trowing / Water/ cover the cement bag with plastic sheet.

3) Do not waste water used for during.

4
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/318/REV-0
Page : 5 of 5

TITLE : WORK INSTRUCTIONS FOR WATERPROOFING WORKS.

4) Stop leakage through water pipe For filling of drum/Tank.

5) Before starting the work for cleaning dabries & chaseling Sprink
water to reduce air pollution dust and privent.

C) HEALTH & SAFETY.

1) Sand should be stacked properly & periphery at stock cover by sand


bags on bricks /partition.

2) Use safety helmet / shoes / rubber handgloves marker & safety belt
on slopping side.

3) Ensure that lift well is baricated by brick work.

4) Ensure that proper baricating around material lift machine & winch
machine.
5) Ensure that lifting machines are not overloaded & brakes are intact

5
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/319/REV-0
Page : 1 of 9

TITLE : WOK INSTRUCTIONS FOR TILING WORKS.

A) QUALITY

1.0 SCOPE:-

Applicable for flooring work in all residential & Commercial


building.

2.0 EQUIPMENT:-

Spades , line dori, right angle/tape/tube level , Trowel aluminum


patti, curing pipe, Sprit level, Grinder, tile cutting machine , wooden
mallet, chisel , hammer, mask for helmet barriers.

3.0 RESPONSIBILITY:-

1) Site Incharge
2) Site Engineer/Supervisor.

4.0 WORK INSTRUCTIONS:-

FLOORING

1) Ensure the shop Drawing is made available from HOD Estimation &
read.

2) Get the samples approved for various tiles from HOD Purchase.

3) Raise the requisition of required quantity for sample flat w.r.t.


estimation.

4) Ensure that material required for activity is received & duly checked
by SI.

5) Check for Extra Amenity.

6) Clean the entire floor and sprinkle the water.

7) Mark level @ 60 cm. (2’.0”) height on walls of entire flat in blue colour
with line dhori.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/319/REV-0
Page : 2 of 9

TITLE : WOK INSTRUCTIONS FOR TILING WORKS.

8) Confirm “L” type cement ghotai 1’0” on wall & 3” on slab top is done
(at skirting level)

9) Use 50% crush sand & 50% River sand for bedding.

a. Cement - 1 bag
b. River sand – 6.25 cft.
c. Crush Sand- 6.25 cft.
d. Farma Size – 2’ 0”x 2’0”x 1’7”

10) Lay the Electrical conduits in bedding before starting the flooring (if
any).

11) Take right angle as per shop drawing. ( i.e. Main door adjacent wall
& passage) for fixing tile .

12) Fix the tiles, one by one (bedding at a time for one tile only).

13) Ensure the arrow on back side of the tile is in one direction only.

14) At the time of fixing check the tile for bend , crack & Otta.

15) Check the tiles for shade variation at the time of fixing.

16) Maintain the line of tile for living / Dining / Passage /Kitchen and
for other rooms, lines are separately maintained.

17) Complete 100% flooring with cut pieces.

18) Clean the flooring.

19) Collect the cut pieces balance from flooring and use for the skirting as
per required size.

20) Fix 3” skirting parallel to line of flooring tile (to maintain uniform
Dutta) and maintain the joints w.r.t. flooring joints.

21) Skirting projection should be 5mm from gypsum plaster.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/319/REV-0
Page : 3 of 9

TITLE : WOK INSTRUCTIONS FOR TILING WORKS.

22) Grout the skirting with 1:3 Mortar and finish the top.

23) Curing for 3 Days.

24) Clean the skirting.

25) Fill up the joint of flooring & skirting with white Cement.

26) Take NOC from QAD/Flooring/501.

27) Lay the POP/protective sheet on Entire flooring.

28) Finish the butt of skirting with gypsum after one week.

29) Record in M & M Register ( QAD / 702) duly signed by S. I. / S.E.

30) Get the actual consumption of tiles verified with HOD Estimation,
finalize the percentage wastage and maintenance quantity for further
procurement.

31) Get the estimation revised if required and update in WBS.

32) Insist HOD Purchase to supply tiles of one Lot only.

33) Prepare the chart of receive/issue of tiles Lot-wise and date-wise for
flats.

TERRACE FLOORING

1) Ensure the waterproofing of terrace is completed and checked for


leakages.

2) Ensure the shop Drawing is made available from HOD Estimation &
read.

3) Get the samples approved for various tiles from HOD Purchase.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/319/REV-0
Page : 4 of 9

TITLE : WOK INSTRUCTIONS FOR TILING WORKS.

4) Raise the requisition of required quantity for sample flat w.r.t.


estimation.

5) Ensure that material required for activity is received & duly checked
by SI.

6) Check for Extra Amenity.

7) Maintain 1 ½” drop in terrace flooring from flat flooring.

8) For Bedding follow the same procedure of flooring.

9) Insert one empty bag in the spout to avoid chock up.

10) Fix the tile one by one with 3 mm spacer.

11) Check equal offset from tile joint (line) to Balcony/ Door frame for
right angle.

12) Take slope 1” towards spout.

13) Fill the joints by Tile Grout with matching colour.

14) Fix the skirting top in level (not in slope) Minimum height 3” from
flooring & 15 mm projected from External plaster.

15) Grout the Mortar in skirting proportion 1:3

16) Finish the surface of the skirting.

17) Ensure that the joint between bedroom flooring & terrace flooring
(off-set) is sealed and tile piece is fixed.

18) Fill the butt above skirting with cement mortar.

19) Clean the Terrace tile flooring & skirting.

20) Take NOC from QAD/Tiling/502.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/319/REV-0
Page : 5 of 9

TITLE : WOK INSTRUCTIONS FOR TILING WORKS.

21) Lay POP on flooring

22) Record in M & M Register ( QAD / 702) duly S. I. / S.E.

23) Get the actual consumption of tiles verified with HOD Estimation,
finalize the percentage wastage and maintenance quantity for further
procurement.

24) Get the estimation revised if required and update in WBS.

25) Insist HOD Purchase to supply tiles of one Lot only.

26) Prepare the chart of receive/issue of tiles Lot-wise and date-wise for
flats.

TOILET FLOORING

1) Ensure the shop Drawing is made available from HOD Estimation &
read.

2) Get the samples approved for various tiles from HOD Purchase.

3) Raise the requisition of required quantity for sample flat w.r.t.


estimation.

4) Ensure that material required for activity is received & duly checked
by SI.

5) Check for Extra Amenity.

6) Maintain ½” drop in toilet flooring from flat flooring

7) Maintain 1 ½” drop in wet and dry area in toilet .

8) For Bedding follow the same procedure of flooring.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/319/REV-0
Page : 6 of 9

TITLE : WOK INSTRUCTIONS FOR TILING WORKS.

9) Ensure empty bag in N. Trap, WHB, outlet & commode out let to
avoid chock up.

10) Fix the tile one by one

11) Ensure that wet area for toilet is :-

a) 2’6” for 7’0” length toilet.


b) 2’9” for 7’6” length toilet.
c) 3’0” for 8’0” length toilet.
d) 3’3” for 8’6” length toilet.
e) 3’6” for 9’0” length toilet.

12) Slope of Dry area flooring towards wet area flooring ½”

13) Slope in wet area flooring towards N. Trap ½”

14) Fix N. Trap tile as shown in figure

Nahani Trap

15) Complete 100% flooring of toilet with cut pieces.

16) Mark location of N. Trap , W.C outlet on tile .

17) Ensure that the joint between flat flooring & toilet flooring ( Drop )
finished with grout to avoid Seepage.

18) Fill up joint with grout.

19) Clean the flooring.

20) Take the NOC from QAD/Tiling/503

21) Curing for 7 Days


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/319/REV-0
Page : 7 of 9

TITLE : WOK INSTRUCTIONS FOR TILING WORKS.

22) Lay the POP & flooring .

23) Record in M & M Register ( QAD / 702) duly S. I. / S.E.

24) Get the actual consumption of tiles verified with HOD Estimation,
finalize the percentage wastage and maintenance quantity for further
procurement.

25) Get the estimation revised if required and update in WBS.

26) Insist HOD Purchase to supply tiles of one Lot only.

27) Prepare the chart of receive/issue of tiles Lot-wise and date-wise for
flats.

DADO TILING

1) Ensure the shop Drawing is made available from HOD Estimation &
read.

2) Get the samples approved for various tiles from HOD Purchase.

3) Raise the requisition of required quantity for sample flat w.r.t.


estimation.

4) Ensure that material required for activity is received & duly checked
by SI.

5) Check for Extra Amenity.

6) Ensure Electrical & plumbing work completed.

7) Ensure door & window opening as pre-approved Drawing.

8) Sock the Tile in drum for two Hrs.

9) Set the base line up tile in line, level , plumb & right angle.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/319/REV-0
Page : 8 of 9

TITLE : WOK INSTRUCTIONS FOR TILING WORKS.

10) Take full tile height from wet area (N. Trap).

11) Take thiyya of in plumb on four corner of each wall.

12) Ensure that all concealed plumbing inlet & outlet sealed with plug.

13) Fix the tile in line, level, & plumb.

14) Ensure that cutting of tile concealed plumbing & Electrical switch
board as per size of fitting.

15) Fix the tile with cement paste (Entire surface area of tile ).

16) Clean the dado tile joint.

17) Fill up the joint with grout (as per shade).

18) Finish the top of tile dado with cement paste in line, level & right
angle.

19) Check for hollowness/otta if any.

20) Take NOC from QAD/Tiling/ 504.

21) Record in M & M Register (QAD/702) duly S. I. / S.E.

22) Get the actual consumption of tiles verified with HOD Estimation;
finalize the percentage wastage and maintenance quantity for further
procurement.

23) Get the estimation revised if required and update in WBS.

24) Insist HOD Purchase to supply tiles of one Lot only.

25) Prepare the chart of receive/issue of tiles Lot-wise and date-wise for
flats.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/319/REV-0
Page : 9 of 9

TITLE : WOK INSTRUCTIONS FOR TILING WORKS.

B) ENVIRONMENT :

1) Do not waste cement, sand, water and tiles because of mishandling / leaks.

2) During tilling work if polishing machine is used, ensure doors and windows
are closed.

3) Use mask, earplugs if machine is used.

4) Collect all the broken tiles / stones in bags and reuse them in staircase or
landings, if possible

C) HEALTH AND SAFETY :


1) Prepare bedding mortar in advance but of right quantity only.

2) Ensure that cutting of tiles, natural stone to be done at confined space.

3) Use safety shoes, earplug and mask while working.

4) Ensure that the proper stacking of natural stone is done.

5) Keep cut pieces with short corners away from work place.

6) Ensure correct use of tile adhesives.

7) Avoid storage tile adhesives near drinking water etc.

8) Keep the marble & granite uncut pieces in proper stand, and avoid cutting
near stand with proper angle.

9) Do care when shifting the large granite pieces.

10) Avoid loose electrical contacts or loose joints


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/320/REV-0
Page : 1 of 4

TITLE : WOK INSTRUCTIONS FOR ELECTRICAL WORKS.

A) QUALITY

1.0 SCOPE:-

Applicable for Electrical work in all residential & Commercial


building.

2.0 EQUIPMENT:-

Hammer, cutting pliers, chisel, knife, file, Drill machine, measuring


Tape, Screw drive, Tester, Line string, SWG, Wire stripper.

3.0 RESPONSIBILITY:-

1) Site Incharge
2) Site Engineer/Supervisor.

4.0 WORK INSTRUCTIONS

1) Slab conduiting.

2) Ensure that relevant approved drg is available electrical work & read it.

3) After completion of 100% shuttering and reinforcement of slab fixing of


pipe on reinforcement 1” dia PVC ( Diamond company) pipe black.
Conducting for electrical and gray for t.v & telephone.

4) Proper cover min 1” from shuttering to conduit.

5) More than 4 pipe in conducting double reinforcement ie top bottom slab


Provided mainly at D.B Area.

6) Junction boxes & fan boxes fix as per drg at the time conducting.

7) Beam drop should be at center of masonary wall in plumbs & end at


beam Bottom cover properly with kiltan.

8) After completion of slab conduction check every pipe joint carefully.

1
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/320/REV-0
Page : 2 of 4

TITLE : WOK INSTRUCTIONS FOR ELECTRICAL WORKS.

9) N.O.C. from QAD.

10) Record in M & M register.

2) WALL DROPING

1) Ensure that relevant approved drg is available electrical work & read

2) After completion of 100% masonary work with curing process


Droping started for each floor.

3) Make gypsum thiyya.

4) Mark the floor level on wall & wall droping line vertical with
cancelled Box position.

5) Fix the concealed box in line , level & flush to gypsum thiyya in
mortar 1:4

6) Fix the pipes in for droping flush to mortar.

7) Pipe end should by ½” min in box in side.

8) Plaster the pipe with cement mortar 1:4

9) In droping more than two pipe provide fiber mesh before plastering.

10) Curing for min. 3 days.

11) N.O.C. from QAD

12) Record in M&M in process activity register.

3) WIRING/SWITCH PLATE

1) Ensure relevant Drg. is available for electrical wiring & read.

2
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/320/REV-0
Page : 3 of 4

TITLE : WOK INSTRUCTIONS FOR ELECTRICAL WORKS.

2) After completion of 1st coat of painting of painting wiring activity


started

3) Check the wiring as per circuit diagram.

4) Wiring : meter room to D.B. mains 6 Sqmm.


D.B. to S.B. submains 1.5 Sqmm.
S.B. to point 1.0 sqmm.
For power point ( boiler and a/c ) 4 Sqmm.
D.B. to fridge and oven 2.5 Sqmm.
2 pair telephone cable.
RG 6 for T.V.

5) Fix all switch plate

5) Fix D.B with M.C.B / spliter/telephone crone.

6) Fix dummy plate for all open fan point ,A/C outlet, junction box if
require.

7) Testing of each point by electrical engineer.

8) N.O.C. From QAD.

9) Record in M&M ( QAD 702).

B) ENVIRONMENT :
 Do not allow more temporary electrical connections than the
sanctioned.
 Ensure lights / fans are put off in site office whenever you are leaving
the office.
 Do not spread insulation material in the working place.
 Use proper equipment for warming up and handling of tar.
 Use proper size conductors to minimize losses.
 Use timer / photo voltaic switch for control of outdoor lights.

3
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/320/REV-0
Page : 4 of 4

TITLE : WOK INSTRUCTIONS FOR ELECTRICAL WORKS.

C) HEALTH AND SAFETY :


 Use well insulated standard cable and insulate all joints to avoid earth
leakage loss / short circuiting.
 Always use 3 core double insulated cables with 3 pin metal clad socket
and top.
 Provide elevated and proper shed for installing panel board.
 Use proper rubber hand gloves while doing electrical work.
 Carry out jobs after switching off the circuit.
 Ensure that all the wire joints are properly sealed with insulation tape.
 Use plug and socket for power supply.
 Ensure that all temporary electrical connections are provided with
earth leakage circuit breaker (E.L.C.B)
 Use proper and plumb scaffolding; tie the entire platform used for
men and material.
 Provide sufficient illumination for safe working.
 Use safety belts, helmet, and shoes.
 Provide safe and sufficient ladder for lift machine room.
 Provide temporary brickwork / Barrier Gate at every landing of lift
shaft.
 While working with glass wool and rock wool, cut pieces from roll
properly using proper cutting tools.
 Use gloves, mask and use PPE.
 Prevent fire while heating tar.
 While erecting centralized A.C. duct, erect proper super structure and
support.

4
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/321/REV-0
Page : 1 of 4
WORK INSTRUCTIONS FOR FIXING ALUMINIUM
TITLE :
WINDOW

A) QUALITY

1.0 SCOPE :-

Applicable for Fixing of Aluminium Window Works.

2.0 EQUIPMENT:
i) Drill Machine
ii) Screw Driver
iii) Hammer
iv) Chisel
v) Silicon Sealant Gun

vi) Hack sow & Glass Cutter

vii) Blower
viii) Helmet

ix) Scaffolding & safety belt if required

3.0 RESPONSIBILITY:-

i) Site Incharge
ii) Site Supervisors.
iii) QAD Engineer
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/321/REV-0
Page : 2 of 4
WORK INSTRUCTIONS FOR FIXING ALUMINIUM
TITLE :
WINDOW

4.0 WORK INSTRUCTIONS:-

 Work Instruction for Fixing of Aluminium window

1 Actual Measurement /Quantity taken by contractor at site


2 Receipt of Aluminium window at site from Contractor
3 Ensure specication & Quality check of Material as approved
4 Ensure quality of Workmanship as per following check
 Track Cutting at 45 degree sharp

 Clits of 1" x1 1/2" aluminum angle at Corner of Track Frame

 Wool Pile For All Track Section & Interlock


2 Drain Holes for Bottom Track per shutter, Ensure no damage to the

track Bottom while drilling Drain Hole
 Screw for Cleat/Angle 4 per Corner
 Shutter Section Cutting & fixing at 90 degree Sharp
 Screw for Shutter Assembly 2 Screw per corner
 Shutter PVC for Glass
 Proper Assembly of Glass (It Should not Be Shatter)
 Fixing of Bearing 2 nos per shutter @ 1 1/2" from Corner of shutter
 Net fixed by U channel with Screw
 S.S. Net should be tight
 S.S. Net should be Tear free
Strat fixing of window after acid wash & 1 caot of Internal Paint &
5
Subframe paint
Before track fixing it is assure that subframe fixed is in right angle by
6
checking diagonals

7 Window shutter fixing with Track (excluding Net Shutter)

8 Track fixing on the sub frame with screw of required size @ 2' C/c
9 Lock fixing at centre of shutter
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/321/REV-0
Page : 3 of 4
WORK INSTRUCTIONS FOR FIXING ALUMINIUM
TITLE :
WINDOW

10 Slot for lock is of exact size (It should not be over size)
S.S. Net Shutter fixed after final Coat & acid wash, antilifter should be
11
provided to each Shutter
12 Protection tap of Section remove after S.S. Net Shutter fixing
Silicon Sealant Filled at all Corner of Track & the gap between Bottom
13
Track & sub frame
14 Visible verification of window for any Damage & Scratch
15 Clean the bottom track by air Blower
16 Ensure Smooth working of Shutter ( sliding) & it should be Tilt free
17 Ensure smooth working of Lock

B) ENVIRONMENT :

 Do not allow sand to spread around and waste.


 Do not waste cement due to mishandling of cement by drop / throws.
 Do not waste the water used for curing.
 Stop leakage through water pipes and filling of drum/tanks.
 Spread some sheets below the work place for collecting the mortar falling down
for reuse.
 As far as possible paint by brush and roller instead of using spray to avoid paint
particle floating in air.

C) HEALTH AND SAFETY :


 While surface cleaning ensure doors and window are closed.
 Ensure use of plastic coverage while external painting.
 Use maximum of steel scaffolding.
 Mixing of cement mortar should be done on proper platform.
 Sand should be stacked properly and the sides to be covered by sand bags or
bricks/Blocks partition.
 Use water based paints instead of solvent – based paints.
 For internal wall painting ensure doors and windows are kept closed in case of
spray painting and the person working uses mask and cap.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/321/REV-0
Page : 4 of 4
WORK INSTRUCTIONS FOR FIXING ALUMINIUM
TITLE :
WINDOW

 Use proper plumb scaffolding; tie the entire platform used for men and material.
 Ensure ladders are sturdy.
 Use handrail and guard rail while working at height. (guard rails)
 Use safety Helmet, Shoes, Rubber Hand Gloves, Mask and Safety Belt.
 Ensure proper barricading around material lift machine.
 Ensure lifting machines are not overloaded, & brakes are intact.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/322/REV-0
Page : 1 of 9
WORK INSTRUCTIONS FOR INTERNAL, EXTERNAL
TITLE :
PAINTING AND MELAMINE POLISHING WORKS

A) QUALITY
1.0 SCOPE :-

Applicable for Internal & External Painting Works.

2.0 EQUIPMENT:-
1) 4" Brush

2) M.S Patti

3) Ladder

4) Mug

5) Steel Scraper.

6) Mask

7) Sand Paper

8) Putty Mixing Machine

Bamboo Scaffolding Material,Kathya/Coir Rope,Safety Belt

3.0 RESPONSIBILITY:-
i) Site Incharge
ii) Site Supervisors.
iii) QAD Engineer
4.0 WORK INSTRUCTIONS:-

 INTERNAL PAINTING

 OBD : -
1) Ensure the Specification of Material & Location of Application &
its Finish.
2) Ensure that all Internal Finishing work Gypsum, Tiling &
Electrical Work Completed, also QAD NOC for the same.
3) Ensure that all walls are sufficiently dried. No
dampness/leakages observed.
4) Ensure that Main Door Shutter & Aluminium Window are Fixed.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/322/REV-0
Page : 2 of 9
WORK INSTRUCTIONS FOR INTERNAL, EXTERNAL
TITLE :
PAINTING AND MELAMINE POLISHING WORKS

5) Put on the mask before starting any scraping/painting activity, while


cleaning the surface ensure Doors & Windows are closed/covered so
as to prevent spreading of paint smell /emission.
6) First clean the the wall surface with wire brush, Sand paper (150
grit) or blade (patra) to remove all loose material (Cement
mortar/gypsum).
7) Pre-wet/dampen the wall with water by brush or roller.
8) Mix putty of approved brand with water in ratio 2:1 . Mixing should
be done by machine to make thick paste. Maximum 10kg of putty
mix with 5 litre of Water at one time.
9) Apply first coat of putty with blade starting from bottom upwards.
Keep the thickness of 1st Coat upto 1.2mm.
10) Wait for complete drying, it takes 3 to 4 hrs.
11) No need of sanding after 1st coat. Apply 2nd coat of putty with blade.
Thickness of 2nd Coat is nearly half the thickness of 1st coat (i.e
0.6mm).Keep total thickness of putty(1st + 2nd coat) upto 1.8mm on
gypsum surface.
12) Sanding the surface after 2 days with fine Emery paper(400 grit) to
remove blade scratch mark & make surface smooth.
13) Check the consistency of Oil Bound Distemper by mixing water with
3:1 ratio.(It may change/differ by Brand to Brand).
14) Apply 1st Coat of Paint from Top to Bottom with 4" brush than finish
immediately with roller applied Vertically & Horizontally.
15) After complete drying of 1st Coat,apply 2nd coat of Paint as above
procedure.
16) Before applying 3rd coat ensure that all electrical accessories /door
fitting & melamine Polish door shutter to be covered.
17) Ensure that all dents/scratches/undulation properly filled &
finished.
18) Ensure all touchup marks work to be painted before 3rd coat
painting.
19) Apply 3rd coat paint with proper paint cutting at wall & ceiling with
most care of application with same above procedure.
20) Ensure that no brush mark, air bubble, roller strip, shine.
21) Clean all the paint stain after painting.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/322/REV-0
Page : 3 of 9
WORK INSTRUCTIONS FOR INTERNAL, EXTERNAL
TITLE :
PAINTING AND MELAMINE POLISHING WORKS

 INTERNAL PAINTING

 Luster : -
1) Ensure the Specification of Material & Location of Application & its
Finish.
2) Ensure that all Internal Finishing work Gypsum,Tiling & Electrical
Work Completed, also QAD NOC for the same.
3) Ensure that all walls are sufficiently dried. No damages/leakages
observed.
4) Ensure that Main Door Shutter & Aluminium Window Fixed.
5) Put on the mask before starting any scraping/painting activity, while
cleaning the surface, ensure Doors & Windows are closed/covered so
as to prevent spreading of paint smell /emission.
6) Clean the surface by Sand Paper No 100 for wall & Ceiling & clean by
Dry Cloth.
7) For 1stCoat of primer of approved brand, mix 1 litre primer to 100ml of
Turpentine thoroughly.
8) Apply 1st coat primer with brush uniformly.
9) Drying period for Primer minimum 12 to 24 hrs.it should not be
elongated more than 15 days.
10) Prepare lambi by mixing 20kg whitening powder with 6 litre of water &
2 litre of oil paint .
11) Apply lambi with Palti patra in line & level.
12) Ensure proper finish at dhar ,kutch & Jambs.
13) After completely drying of 1st coat lambi , apply 2nd coat as per above
procedure with proper surface finish.Thickness of lambi should not be
more than 2mm including 1st & 2nd Coat.
14) Ensure surface should be in line, level without any undulation.
15) After completely drying of 2nd coat, lambi start sanding by the wall
surface with sand paper No.150 & clean with dry cloth.
16) Prepare the Aster (Base) coat paint by mixing 1 litre of Primer with 1
litre of oil paint(1:1 Ratio) & add 300ml Turpentine in the mixture.
17) Apply Aster (base)coat by brush & finish immediately by roller Apply
it Vertically & horizontally.
18) Next day any cracks/surface damage, scratches observed will be filled
by putty & paint touchup.
19) After completing crack filling & paint touchup, 1st coat of Luster paint
should start.
20) Prepare mix for luster paint by mixing 1 litre of luster with 100 to 125
ml of Turpentine.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/322/REV-0
Page : 4 of 9
WORK INSTRUCTIONS FOR INTERNAL, EXTERNAL
TITLE :
PAINTING AND MELAMINE POLISHING WORKS

21) Ensure finish as per approved sample / requirement.


22) Minimum drying period is 24 to 48 hrs.
23) Ensure surface should be completely dry.
24) Befo applying 2nd coat ensure that all electrical accessories /door
fitting & melamine Polish door shutter to be covered.
25) Ensure all touchup work done with paint before final painting
wherever required.
26) Apply 2nd coat of luster paint with proper paint cutting at wall &
ceiling with most care of application with same above procedure & mix.
27) Ensure that no brush mark, air bubble, roller strip, shine.
28) Clean all the paint stain after final painting

 INTERNAL PAINTING

 PLASTIC PAINT : -
1) Ensure the Specification of Material & Location of Application & its
Finish.
2) Ensure that all Internal Finishing work Gypsum, Tiling & Electrical
Work Completed, also QAD NOC for the same.
3) Ensure that all walls are sufficiently dried. No damages/leakages
observed.
4) Ensure that Main Door Shutter & Aluminium Window Fixed.
5) Put on the mask before starting any scraping/painting activity, while
cleaning the surface ,ensure Doors & Windows are closed/covered so
as to prevent spreading of paint smell /emission.
6) Clean the surface by Sand Paper No 100 for wall & Ceiling & clean by
Dry Cloth.
7) For 1stCoat of primer of approved brand, mix 1 litre primer to 100ml of
Turpentine thoroughly.
8) Apply 1st coat primer with brush uniformly.
9) Drying period for Primer minimum 12 to 24 hrs.it should not be
elongated more than 15 days.
10) Prepare lambi by mixing 20kg whitening powder with 6 litre of water &
2 litre of oil paint .
11) Apply lambi with Palti patra in line & level.
12) Ensure proper finish at dhar ,kutch & Jambs.
13) After completely drying of 2nd coat, lambi start sanding by the wall
surface with sand paper No.150 & clean with dry cloth.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/322/REV-0
Page : 5 of 9
WORK INSTRUCTIONS FOR INTERNAL, EXTERNAL
TITLE :
PAINTING AND MELAMINE POLISHING WORKS

14) Prepare the Aster (Base) coat paint by mixing 1 litre of Primer with 1
litre of oil paint(1:1 Ratio) & add 300ml Turpentine in the mixture.
15) Prepare the Aster (Base) coat paint by mixing 1 litre of Primer with 1
litre of oil paint(1:1 Ratio) & add 300ml Turpentine in the mixture.
16) Apply Aster (base)coat by brush & finish immediately by roller Apply
it Vertically & horizontally.
17) Next day any cracks/surface damage, scratches observed will be filled
by putty & paint touchup.
18) After completing crack filling & paint touchup, 1st coat of Plastic paint
should start.
19) Prepare mix for Plastic paint by mixing 1 litre of Plastic paint with 500
ml of water.
20) Apply 1st coat or plastic paint with brush & finish immediately by roller
vertically & horizontally.
21) Ensure finish as per approved sample/requirement.
22) Minimum drying period is 24 to 48 hours.
23) Ensure surface should be completely dry.
24) Before applying 2nd coat ensure that all electrical accessories /door
fitting & melamine polish door shutter to be covered.
25) Ensure all touch up work done with paint before final painting
wherever required.
26) Apply 2nd coat of plastic paint with proper paint cutting at wall &
ceiling with most care of application with same above procedure & mix.
27) Ensure that no brush mark, air bubble, roller strip, shine .
28) Clean all the paint stain after final painting.

 INTERNAL PAINTING

 OIL PAINT ON POP/GYPSUM WALL

1) Ensure the Specification of Material & Location of Application & its Finish.
2) Ensure that all Internal Finishing work Gypsum, Tiling & Electrical Work
Completed, also QAD NOC for the same.
3) Ensure that all walls are sufficiently dried. No dampness/leakages
observed.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/322/REV-0
Page : 6 of 9
WORK INSTRUCTIONS FOR INTERNAL, EXTERNAL
TITLE :
PAINTING AND MELAMINE POLISHING WORKS

4) Ensure that Main Door Shutter & Aluminium Window are Fixed.
5) Put on the mask before starting any scraping/painting activity, while
cleaning the surface ensure Doors & Windows are closed/covered so as to
prevent spreading of paint smell /emission.
6) First clean the the wall surface with wire brush, Sand paper (150 grit) or
blade (patra) to remove all loose material (Cement mortar/gypsum).
7) Pre-wet/dampen the wall with water by brush or roller.
8) Mix putty of approved brand with water in ratio 2:1 . Mixing should be
done by machine to make thick paste. Maximum 10kg of putty mix with 5
litre of Water at one time.
9) Apply first coat of putty with blade starting from bottom upwards. Keep
the thickness of 1st Coat upto 1.2mm.
10) Wait for complete drying, it takes 3 to 4 hrs.
11) No need of sanding after 1st coat. Apply 2nd coat of putty with blade.
Thickness of 2nd Coat is nearly half the thickness of 1st coat (i.e
0.6mm).Keep total thickness of putty(1st + 2nd coat) upto 1.8mm on
gypsum surface.
12) Sanding the surface after 2 days with fine Emery paper (400 grit) to
remove blade scratch mark & make surface smooth.
13) Prepare Oil paint mix by mixing 1 ltr Oil paint with 150 ml turpentine.
14) Apply 1st Coat of Oil Paint from Top to Bottom with 4" brush than finish
immediately with roller applied vertically & horizontally.
15) Leave the paint surface to dry at least One Day.
16) Before applying 2nd coat ensure that all electrical accessories /door
fitting & melamine Polish door shutter to be covered.
17) Ensure that all dents/scratches/undulation properly filled & finished.
18) Ensure all touchup marks work to be painted before 2nd coat painting.
19) Apply 2nd coat paint with proper paint cutting at wall & ceiling with
most care of application with same above procedure.
20) Ensure that no brush mark, air bubble, roller strip, shine.
21) Clean all the paint stain after painting.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/322/REV-0
Page : 7 of 9
WORK INSTRUCTIONS FOR INTERNAL, EXTERNAL
TITLE :
PAINTING AND MELAMINE POLISHING WORKS

 INTERNAL PAINTING

 OIL PAINT ON M.S RAILING /SURFACE : -

1) Ensure 1st Coat External Paint should completed before starting of


Oil paint to M.S Railing/Surface.
2) Clean the surface by sand paper & scraper to remove loose particle,
mortar etc.
3) Clean the surface by dry cloth to remove dust & powder.
4) Apply Zinc Chromite as a primer coat by mixing 1 litre of Zinc
Chromite with 150ml of Turpentine.
5) After completely drying of Primer, 1st coat of Oil paint is applied by
mixing 1 Litre of oil paint with 150 ml of Turpentine.
6) Use 1" or 2" brush as required for application.
7) Ensure that surface should be dried completely before starting of 2nd
coat of Oil paint.
8) Apply 2nd coat of Oil paint as per above procedure & mix.
9) Ensure there is no bubble formation, undulation, brush mark &
Spots on the Surface.

 EXTERNAL PAINTING

1) Ensure 100% R.C.C work & External Plaster work Completed.


2) Ensure all rectification work/touchup work/repair to be completed
as per QAD NOC.
3) Ensure Scaffolding work with proper Bracing & Tieing with rigidity
Completed.
4) Ensure all safety equipment is used such as Helmet, Safety Belt.
5) Ensure the surface by Steel scraper/wire brush or Kathya brush.
6) Remove loose particle Dust, Oil Grease, Cement Particle by Water.
7) Apply Primer Paint with mix of 1litre of primer with 1 litre of
water,In case of Exterior sealer mix 1 litre of Sealer with 100ml of
water ( It vary from Brand to Brand)
8) Apply with uniformly in Both Direction.
9) After drying Primer Coat/Sealer coat (minimum drying period 24
hours) it should be not elongated more than 15 days
10) If there is any visible crack after primer coat/ Sealer coat same
should be filled by Crack filler.
11) Ensure the shade as per approved before start of 1st coat.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/322/REV-0
Page : 8 of 9
WORK INSTRUCTIONS FOR INTERNAL, EXTERNAL
TITLE :
PAINTING AND MELAMINE POLISHING WORKS

12) Apply 1st coat of Acrylic Paint by mixing 1 ltr paint to 400 ml of
water (It may be vary brand to brand.
13) Apply paint with brush uniformly with both direction.
14) Cleaning the work place & remove all paint stains immediately.
15) After application of 1st coat, application of 2nd coat should be done
after minimum 24hrs gap.
16) If applied after gap of 7 days or more than remove dust & loose
particle by water.
17) Ensure Surface should be dry before application of 2nd Coat.
18) Apply 2nd coat with mix same as 1st coat by brush in both diection.
19) Ensure paint should be applied at every corner, nitch, patta
downtake lines etc.
20) Ensure all cleaning work at window glass frame/railing/folding
shutter etc.

 MELAMINE POLISH

1) Melamine polishing activity starts before starting of Primer


paint for Wall & Ceiling.
2) Clean the Door Shutter/Frame by wet cloth to remove Fevicol,
cement particle, dust particle etc.
3) Sanding done by Sand paper No.100
4) After sanding clean the surface by dry cloth.
5) Prepare wood stain Polish of required colour/shade by mixing
½ Kg. wood stain powder with 1 Litre Turpentine & mix it
thoroughly.
6) Apply the mix by hand or by brush.
7) After applying clean the surface by dry cloth.
8) Apply Melamine Sealer Coat by mixing 1 litre melamine sealer
with 250 ml thinner by Spray.
9) After drying of Sealer Coat, fill the crack/holes, gaps with
required colour mix & make surface uniform by whitening.
10) After completely drying, sanding is done by Emery Paper
No.150.
11) Clean the surface by dry cloth.
12) Ensure all the door fittings are fixed & covered with masking
tape/plastic paper.
13) French polishing is done by wet cloth in 4 to 5 coats upto
required base/finish.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/322/REV-0
Page : 9 of 9
WORK INSTRUCTIONS FOR INTERNAL, EXTERNAL
TITLE :
PAINTING AND MELAMINE POLISHING WORKS

14) Ensure that only final coat of wall/ceiling is balance before


starting of final coat of Melamine Polish.
15) After complete drying of French polish Final coat of Melamine
polish is started.
16) Make Melamine mat/glass Polish as Required by mixing 1 litre
Melamine with 250 ml thinner.
17) Apply Melamine Polish coat by Spray.
18) After completely drying remove masking tape & paper & clean
melamine Stain.
19) After completion of Final Paint to wall Surface,
buffing(cleaning the Paint stain, touchup by required colour )
for Melamine polish is Done.

B) ENVIRONMENT

i) Before the start of site cleaning, sprinkle water to reduce dust and
prevent air pollution
ii) Use mask, safety shoes for site cleaning and line out.

C) HELATH AND SAFETY

i) Use helmet and safety shoes for cleaning.


ii) Before digging check underground utilities like, water, gas, electricity
etc.
iii) Ensure snake bite kit is available & used whenever required.

iv) Ensure use of sturdy & steady scaffolding.

v) Ensure use of Safety Belt.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/323/REV-0
Page : 1 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
COMPOUND WALL WORK

A) Quality:-

 Scope:- Applicable for all residential & commercial buildings.

 Equipment:-

1) Demarkation and layout of boundary line

2) Working drawings

3) Cross section of wall

4) T. B. M.

5) Tools & plants

6) Machineries

 Responsibility:-

 HOD D&D to issue the drawing


 Site In charge
 Q.A.D. Engineer
 In charge Development
 Surveyor

 Work Instructions:-

 HOD D&D to issue approved drawings i.e. layout done with total station,
working drawings, cross Section of wall and detail drawings.
 Study of drawings.
 Physical demarkation & line out by surveyor on site with total station.
 Take the original ground levels w.r.t. TBM.
 Excavation up to design strata & dewatering if required.
 Take the excavated levels for estimation & billing purpose.
 PCC as a leveling course.
 UCR masonry below GL as per section drawing, 4” dia. PVC pipe weep holes at
5’0” C/C & staggered above at 2’6” height, RCC headers at 5’0” C/C &
staggered above at 2’6” height.
 Keep the expansion joint of 3” width after every five bays of BBM above UCR.
 Fixing of key stones at 2’ c/c distance at every layer of UCR for bonding the
next above layer.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/323/REV-0
Page : 2 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
COMPOUND WALL WORK

 Max. height of UCR 1’6” above made up GL or adjucent plot which ever is
higher.
 Casting of the PCC coping 100mm thick above top of UCR.
 Divide the entire length of wall in to equal bays between 9’ to 10’ ( each bay ).
 Keep the expansion joint of 3” after every 5 bays.
 6” brick wall to be construction at external face between two pillar of 15” x 15”
for each bay.
 Height of compound wall including railing shall be min 7’ above made up GL.
 Top of pillar should be 1’ above railing / brick wall top.
 Keep 4” gap between brick work & railing.
 Grout the railing in brick pillar with two hold fasts on either side.
 Pointing / plaster for UCR masonry above GL.
 Double coat sand faced plaster from inside per drawing & design approved by
D&D dept.
 Curing.
 Painting of compound wall as per project theme.
 Take NOC by QAD Engineer.
 In charge development to fill the checklist – ‘C’ duly verified & approved by
P.E. & QAD.
 Checklist handover to HOD co-ordination dept.

B) Environment:-

 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

C) Health & Safety:-

 Use helmet & safety shoes.


 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/324/REV-0
Page : 1 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
RETAINING WALL

 Quality:-

 Scope:- Applicable for all residential & commercial buildings.

 Equipment:-
 Demarkation & layout of boundary line
 Working drawings
 Cross section of wall
 T. B. M.
 Tools & plants
 Machineries

 Responsibility:-
 HOD D&D to issue the drawings
 Site In charge
 Q.A.D. Engineer
 In charge Development
 Surveyor

 Work Instructions:-
 HOD D&D to issue approved drawings i.e. layout done with total station, working
drawings, cross Section of wall & detail drawings.
 Study of drawings.
 Demarkation & line out by surveyor on site with total station.
 Take the original ground levels.
 Excavation up to hard strata & dewatering if required.
 Take the excavated levels for estimation & billing purpose.
 PCC as a leveling course.
 RCC retaining wall as per the RCC Consultant drawing approved by HOD D&D.
 Shuttering for raft slab & pardi.
 Cutting, binding of reinforcement at the place for raft & pardi. Tie precast covers
50mm & 40mm for raft & pardi respective.
 Casting of the raft slab in required grade of concrete.
 Use of tie rod system for shuttering, shuttering for RCC pardi up to 4’0” height at a
time with proper supporting from inside & outside by m.s. props at 45°.
 Casting of pardi in required grade of concrete.
 Curing.
 Hacking for expose surface where plaster is required.
 Double coat sand faced plaster with grooves & design approved by HOD D&D.
 Curing.
 Painting as per the project theme.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/324/REV-0
Page : 2 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
RETAINING WALL

 Take NOC by QAD Engineer.


 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.

 Environment:-
 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-


 Use helmet & safety shoes.
 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/325/REV-0
Page : 1 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
MAIN ENTRANCE GATE & SECURITY CABIN

 Quality:-

Scope:- Applicable for all residential & commercial buildings.

 Equipment:-
 Layout
 working drawings
 RCC drawings
 electrical drawing
 Tools & plants
 Machineries

 Responsibility:-
 HOD D&D
 Site In charge
 Q.A.D. Engineer
 In charge Development

 Work Instructions:-
 HOD D&D to issue approved drawings i.e. layout, working, RCC & electrical
drawings.
 Study of all drawings.
 Line out of main entrance gate & security cabin.
 Marking of final F.F.L. levels, road top levels etc & decide the plinth top level of
security cabin i.e. min. 1’6” above adjucent F.F.L.
 Record the OGL.
 Excavation of footing for main entrance & security cabin.
 Record the excavated levels.
 PCC for footing.
 Curing to all cement activities.
 Mark the column centers.
 Cutting & binding reinforcement for footings & columns of main entrance gate.
 Laying & fixing of electrical conduits for main entrance gate columns.
 Casting of footing & columns of main entrance gate.
 Errection of designed m. s. gate, rest on pivot at GL & embed top hinges in RCC
columns with m. s. plate & chemical fastener.
 Keep 3” clearance between m.s. gate bottom & highest F.F.L., check the clearance
with close & open position of the gate.
 Granite cladding for entrance gate columns.
 Electrical wiring for main entrance gate columns with control in security cabin.
 Fixing of decorative light fittings on the top of main entrance gate columns.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/325/REV-0
Page : 2 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
MAIN ENTRANCE GATE & SECURITY CABIN

 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.

 Security Cabin :
 Cutting , binding reinforcement, shuttering & casting for footings , stub columns, tie
beams, columns up to slab beam bottom, beam & slab.
 Complete BBM of security cabin.
 Internal plaster in gypsum & external double coat sand face.
 Chemical w/p for slope roof slab.
 Fixing of roof tiles.
 Steel grey granite flooring size 12” x 12” & skirting of same granite, 5mm out side
from gypsum finish.
 Butt finish.
 Door & window frame in Krishna grey black granite.
 Door & window shutters in anodized / powder coated aluminum with plain glass.
 Internal & external painting as per project theme.
 Carry out the furniture work in security cabin i.e. one table, key cabinet & shutters
for control panels of fountain street lights & gate lights.
 Fixing of one tube light & one wall clock.
 Fixing of the name board on security cabin i.e. security.
 Take NOC by QAD Engineer.
 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.

 Environment:-
 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-


 Use helmet & safety shoes.
 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/326/REV-0
Page : 1 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
CLUB HOUSE

 Quality:-

 Scope:- Applicable for all residential projects.

 Equipment:-
 Layout
 working drawings
 RCC drawings
 Electrical drawings
 Drainage & Plumbing Drawings
 Working drawing for swimming pool from swimming pool consultant
 Tools & plants
 Machineries
.
 Responsibility:-
 HOD D&D
 Site In charge
 Swimming Pool Consultant
 Q.A.D. Engineer
 In charge Development
 Surveyor

 Work Instructions:-
 HOD D&D to issue approved drawings i.e. layout, working, RCC & electrical
drawings.
 Study of all drawings.
 Line out of club house.
 Take OGL.
 Check the line out from D&D and take approval with NOC.
 Excavation for club house footings.
 PCC for footings & curing for all cement activities.
 Cutting, binding, reinforcement, shuttering, casting for footings, stub columns, tie /
plinth beams, columns above plinth, beam & slabs. ( refer RCC instructions for
details )
 Plinth back filling, watering, compaction, 9” thk. Soling.
 Anti termite treatment for plinth.
 4” thk. PCC.
 Brick work ( refer work instructions of brick masonry for details ).
 Internal plumbing in PPRC as per approved drawing.
 Internal plaster in gypsum & external sand faced double coat plaster.
 External plumbing & drainage as per approved drawing.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/326/REV-0
Page : 2 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
CLUB HOUSE

 Fixing of plywood door frames.


 Application of texture finish from outside the club house where
necessary.
 Brick bat water proofing for changing room toilet, common toilet & top terraces.
 Selection & approval of floor dado tiles & stone material by Architect
& E.D.
 Fixing floor, dado tiles & stone material for gents, ladies changing room
community hall, gymnasium lobby & staircase as per drawing given
by HOD D&D. ( Refer tiling work instructions for details. )
 Fixing of door shutters & aluminium anodized windows
 Internal luster painting & external painting as per the project theme.
 Fix sanitary wares & CP fittings in changing room, common toilets.
 OHWT in sintex tank 5000 lit. capacity place on top terrace slab. ( Due
care to be taken for terrace slab design )
 In gymnasium – fixing of the mirrors on wall & mat on entire floor.
 Place the gym equipment as per the layout.
 Take NOC by QAD Engineer.
 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.

 Environment:-
 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-


 Use helmet & safety shoes.
 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/327/REV-0
Page : 1 of 3
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
SWIMMING POOL

 Quality:-

 Scope:- Applicable for all residential projects.

 Equipment:-
 Layout
 working drawings
 RCC drawings
 Electrical drawings
 Drainage & Plumbing Drawings
 Working drawing for swimming pool from swimming pool consultant
 Tools & plants
 Machineries
.
 Responsibility:-
 HOD D&D
 Site In charge
 Swimming Pool Consultant
 Q.A.D. Engineer
 In charge Development
 Surveyor

 Work Instructions Flow Chart:-

HOD D&D to
Study of
issue approved Line out Take OGL
all drawings
drawings

NOC from
Box type w/p PCC Excavation
D&D

Outer W/P ghotai plaster


Cutting, binding,
Line out by total periphery from
reinforcement
station 9" thk. Brick external side of
for raft & pardi
masonery BBM
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/327/REV-0
Page : 2 of 3
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
SWIMMING POOL

lay & fix inlet 2" lay & fix inlet


dia pipe branches pipe fix drain & lay 2"
at six places in 4" dia from dia drain pipe
raft casting
pardi from 4" dia filter room, from raft up to
pipe & 2 vaccum deck area to filter room pump
cleaning points first inlet

lay electrical
conduit back filling in 9" thk. Soling,
pardi casting
in pardi for under deck area out side slope
water lights

fix icon brown screed type preparation for 4" thk. PCC,
granite coping w/p inside w/p out side slope

fix the icon brown fix blue glass


fix the glazed tiles
deck flooring, granite 6" border mosaic
in over flow
out side slope out side periphery tiles size 1" x 1"
gutter
of the deck with adhesive

fix s.s. railing fill the glass cleaning &


fix one s.s. ladder for mosaic washing
in main pool main & kids tile joint with bright glass mosaic
pool white grout tiles

fix instructions,
fix fiber grating ladies & gents
fix under water fill the tank with
for over flow changing room
light fittings PMC water
gutter identification
boards

Commissioning
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/327/REV-0
Page : 3 of 3
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
SWIMMING POOL

Note : Balancing water tank & under ground filtration room – i) refer work
instructions of UGWT ( RCC & w/p ) ii) provide proper ventilation openings & fix
the m.s. ladder for under ground filtration room.

 Environment:-
 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-


 Use helmet & safety shoes.
 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/328/REV-0
Page : 1 of 3
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
TRIMIX CONCRETE ROAD

 Quality:-

 Scope:- Applicable for all residential & commercial buildings.

 Equipment:-

 Road roller 10 to 12 ton


 Earth compactor
 Dewatering vacuum pump set
 Screed vibrator 4 mtr.
 Dewatering blue surface mat – 1 no.
 Dewatering yellow sucking mat – 6 nos.
 Floater
 Floater disk
 Vibrator electrical or petrol
 Vibrator needle 60 no.
 Electrical panel board
 Cable 2.5 sq.mm 3 core
 Ghamela
 Phawada
 Tikav
 Thapi
 Ghotai patra
 Wire Brush
 Wheel Barrow
 Gum Boot
 Rubber hand gloves
 Safety helmet
 Tools & plants
 Machineries

 Responsibility:-
 HOD D&D
 Site In charge
 Q.A.D. Engineer
 In charge Development
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/328/REV-0
Page : 2 of 3
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
TRIMIX CONCRETE ROAD

 Work Instructions:-
 Study of drawings, existing drainage / electrical, water line etc.
 Line out of road marking of the levels with respect to plinth level.
 Excavation cutting & filling ( in case of BC soil remove up to 3’0” )
 Sub grade preparation i.e. watering, rolling & compaction by 10 to 12 ton roller
(check proctor density test if required). The roller must roll minimum 30 times up
and down the subgrade stretch, so that the leveling and compaction is achieved.
 Slope of road (i) In ‘L’ section, adjust as per the plinth F.F.L. i.e. drop (ramp) from
F.F.L. to road top should not be more than 1’ ii) Across the road 1:100 towards
gutter.
 Construct storm water gutters size min. 1’ x 1’ along the road & slope according to
the ‘L’ section of the road.
 9” thick. Soling or 4” thick compacted 2 metal layers in required line level & slope,
filling the gaps with kapchi .
 Murum spreading above the soling dry rolling by 10 to 12 ton roller.
 Fixing of the 5” channels in line level required slope & width 4.0 meter maximum.
 Laying of the plastic sheet.
 Pour of M 20 grade concrete, spreading, leveling & vibrating by surface vibrator.
 Dewatering by vacuum pump till water stop dripping.
 Check by foot impression.
 Smooth finishing by floater & patra.
 Brooming by wire brush across the vehicular movement.
 Remove the channel on next day.
 Curing by ponding method, minimum 14days.
 Remove the pond mortar, cleaning, washing of the concrete road.
 5 mm wide groove cutting by cutter machine with groove pattern
i) Centrally along the road should be done within two days of concreting being
done.
 ii) 3 m c/c across the road.
 Cleaning of groove by air pressure.
 Filling of the groove with tikitar.
 Fixing of the curb stone after & along the gutter.
 Fixing of m.s. grating cover above storm water gutter.
 Painting i) grating cover in bronze shade oil paint. ii) curb stone in sandtex shade
one yellow & one red brown with application of primer & birla putti .
 Take NOC by QAD Engineer.
 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/328/REV-0
Page : 3 of 3
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
TRIMIX CONCRETE ROAD

 Environment:-

 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-

 Use helmet & safety shoes.


 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/329/REV-0
Page : 1 of 2
QEHS WORK INSTRUCTIONS FOR INSTALLATION OF
TITLE :
DIESEL GENERATOR

 Quality:-

 Scope:- Applicable for all residential & commercial buildings.

 Equipment:-
 Megar
 Tongue tester
 Cramping tools
 Spanner
 Screw Driver
 Tester
 Plier
 Hacksaw
 Hammer
 Wire cutting pliers
 Knife
 Tools & plants
 Machineries

 Responsibility:-
 HOD Co-ordination Department
 Site In charge
 Q.A.D. Engineer
 In charge Development

 Work Instructions:-
 HOD Co-ordination department to issue demarkation & layout drawings.
 Study of drawings.
 Lineout of D.G. plinth.
 Excavation up to hard strata.
 PCC
 Height of the D.G. plinth 1’0” above road level.
 UCR work at the periphery of the D.G. plinth.
 Murum filling with watering & compaction in plinth area up to soling bottom.
 9” thick rubble soling.
 Casting of the slab with reinforcement 8 mm dia. @ 150mm c/c.
 External plaster in sand faced double coat and top finishing with IPS finish with line
marking 12” x 12”, 5mm thick string.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/329/REV-0
Page : 2 of 2
QEHS WORK INSTRUCTIONS FOR INSTALLATION OF
TITLE :
DIESEL GENERATOR

 Sandtex bottle green shade painting on top of plinth and side as per the project
theme.
 Curing for all cement activities.
 Excavation for earthing 5’ x 5’ x 5’ = 4 nos near D.G. plinth
 Do the earthing work using charcoal, salt, CI plate, GI strip & GI pipes, funnel at
top & GI pipe.
 Installation of D.G. with sound proof canopy on D.G. plinth.
 Fixing of AMF panel near D.G.
 Cabling work i.e. alteration to AMF panel & sensor to AMF panel from M.S.E.D.
Co. Ltd.
 Testing of the D.G. checking output i.e. rpm, frequency, voltage etc.
 Laying of armoud cable as per drawing given by electrical consultant through
existing electrical conduits from D.G. auto change over panel to feeder pillar.
 Laying armored cables from feeder pillar to individual building change over panel
through existing electrical conduit.
 Connection from building auto change over panel to common meters & individual
flats. ( supply to light, fan & 5 amp point )
 Fixing of board on D.G. plinth i.e. Diesel Generator.
 Take NOC by QAD Engineer.
 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.

 Environment:-
 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-


 Use helmet & safety shoes.
 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/330/REV-0
Page : 1 of 3
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
L.T. ROOM & INSTALLATION OF TRANSFORMER

 Quality:-

 Scope:- Applicable for residential & commercial buildings.

 Equipment:-
 Megar
 Tongue tester
 Cramping tools
 Spanner
 Screw Driver
 Tester
 Plier
 Hacksaw
 Hammer
 Wire cutting pliers
 Knife
 Tools & plants
 Machineries

 Responsibility:-
 HOD D&D
 Electrical Consultant
 Licensed Electrical Contractor
 Site In charge
 Q.A.D. Engineer
 In charge Development

 Work Instructions:-
 Take the necessary sanction through M.S.E.D. Co. Ltd. through licensed
electrical contractor.
 HOD D&D to issue a layout approved and detail drawing prepared & verified by
electrical consultant.
 Study of drawings.
 Line out of the L.T. / transformer room.
 Excavation for footings.
 PCC for footings.
 Centre line marking for footing column.
 Shuttering, cutting, binding, reinforcement, casting footing, stub column, plinth
beam & slab.
 9” thick BBM for cable trenches as per the layout.
 Back filling up to soling bottom with watering & compaction.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/330/REV-0
Page : 2 of 3
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
L.T. ROOM & INSTALLATION OF TRANSFORMER

 9” thick soling murum spreading, watering, & compaction for the entire plinth..
 PCC for plinth.
 9” thick BBM above the plinth openings as per working drawing.
 Internal gypsum finish plaster.
 External double coat sand faced plaster.
 Slab top finish with brickbat coba water proofing with line marking 12” x 12”, 5mm
thick string.
 Cable trench cement ghotai plaster sides & bottom.
 12” x 12” ceramic tile flooring.
 Fixing m. s. grating on cable trench.
 Internal OBD painting & external as per project theme.
 Fixing of the rolling shutter size 9’0” x 10’0”, service door 5’0” x 8’0” two panel
m.s. folding door no. as per requirement.
 Fixing of the anodized / powder coated aluminum window bottom half in aluminum
luvers & top half sliding shutters.
 Installation of transformer – LT, HT cable panel.
 Write the safety instructions on wall inside the room identification for cable &
transformer.
 Fixing of rubberized tiles 2’0” x 2’0” on ceramic flooring.
 Laying & connection of HT cable coming from M.S.E.D. Co. Ltd. HT pole to HT
feeder pillar near our project. HT feeder pillar to HT feeder pillar in transformer
room then feeder pillar to transformer.
 Laying the LT cable coming from transformer to LT feeder pillar in transformer
room, then connects to feeder pillar near the bldg. Distribution of LT cable from
feeder pillar to individual bldg. bus bar in meter room.
 Construction of inspection chamber in 9” thick B.B.M. every 50’0” length with
RCC chamber cover.
 Fixing of name board i.e. LT / Transformer.
 Take NOC by QAD Engineer.
 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/330/REV-0
Page : 3 of 3
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
L.T. ROOM & INSTALLATION OF TRANSFORMER

 Environment:-

 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-

 Use helmet & safety shoes.


 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
 Always engage qualified and trained electrician.
 Ensure adequate earthing before starting the equipment.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/331/REV-0
Page : 1 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION AND
TITLE :
INSTALLATION OF SEWAGE TREATMENT PLANT

 Quality:-

 Scope:- Applicable For Residential and Commercial Bldg

 Equipment:-
 Air blower
 Dual media filter
 Activated carbon filter
 Feed pump
 Air grid
 Tool kit
 Dosing tank 100 lit - 2 nos
 Exhaust fan – 01 no.
 Cleaning jar – 01 no.
 Plastic bucket – 02 nos
 Hypo chlorine & poly dosing powder
 Tools & plants
 Machineries

 Responsibility:-
 HOD D&D Co-ordination Department
 Site In charge
 Q.A.D. Engineer
 In charge Development

 Work Instructions:-
 HOD Co-ordination issue approved layout drawings.
 HOD D&D to issue RCC drawings.
 Study of drawings.
 Line out for bar screen chamber oil & grease chamber equalization tank fab1, fab2
tank tube shetler tank, chlorine contact tank, sludge digester tank & treated water
tank.
 Excavation for all tanks.
 PCC for all tanks.
 Box type water proofing above the P.C.C.
 Shuttering, cutting, binding reinforcement and casting of raft pardi and slab.
 Box type W/P for the RCC pardi.
 Internal w/p smooth cement ghotai patra finish.
 External double coat sand faced plaster which are above the ground ( fab1, fab2
tube shetler chlorine contact tank).
 Fixing of the m.s. chamber cover top of slab finish with smooth cement ghotai w/p.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/331/REV-0
Page : 2 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION AND
TITLE :
INSTALLATION OF SEWAGE TREATMENT PLANT

 Fixing of m.s. ladder to climb fab1, fab2.


 M.S railing for fab1, fab2 and tube shetler 3’6” height safety purpose.
 Painting as per project theme.
 Construction of foundation, air blower pump, activated carbon filter and dual media
carbon filter.
 Installation of STP plant i.e. air blowers activated carbon filter and dual media filter
fixing of bar screen chamber, laying of air grid pipe lines at equliasation tank,
treated water tank and fab1, fab2.
 Construction of room or sound proof canopy for the air level to maintain noise level
below 50 decibel.
 Commissioning of the plant training given to operator, concern supervisor &
society manager.
 Fixing of name board i.e. Sewage Treatment Plant.
 Take NOC by QAD Engineer.
 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.

 Flow chart :-
Inlet to bar screen chamber --- oil & grees chamber --- equalization tank --- fab
reactor --- tube shetler --- chlorine contact tank --- filter feed tank ( dual media filter
activated carbon filter ACF ) --- sludge digester--- treated water tank

 Environment:-
 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-


 Use helmet & safety shoes.
 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/332/REV-0
Page : 1 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION AND
TITLE :
INSTALLATION OF WATER TREATMENT PLANT

 Quality:-

 Scope:- Applicable for all residential/ commercial buildings.

 Equipment:-
 Raw water Pump - 02 nos.
 Dual Media filter (sand filter) – 01 no.
 ACF ( Activated carbon filter) – 01no.
 Softener – 01 no.
 Brine solution tank – 01 no.
 Chlorine dosing pump – 02 nos.
 Chlorine dosing Tank – 01 no.
 Pump power panel – 01 no.
 Polishing carbon filter – 01 no.
 Work manual
 Tools & plants
 Machineries

 Responsibility:-
 HOD Co-ordination
 Site In charge
 Q.A.D. Engineer
 In charge Development

 Work Instructions:-
 HOD Co-ordination to issue approved working drawings.
 Study of drawings.
 Study of drawings.
 Confirm clear height 4 mtr from FFL to bottom of slab & size as per approved
drawing.
 Line out as per layout plan.
 Excavation for column footing.
 PCC.
 Shuttering, Cutting , binding, reinforcement, stub column, plinth beam, slab casting.
 9” brick masonry for plinth.
 Back filling, soling & PCC for plinth.
 9” soling for WTP Room.
 Fixing of m. s. subframes for windows & door frames ( size 5’ x 8’ ).
 Construction of gutter with ghotai plaster to run all pipe lines concealed in gutter.
 Construction of 6” raised plat form size 2 mtr x 1 mtr for stacking salt bags.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/332/REV-0
Page : 2 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION AND
TITLE :
INSTALLATION OF WATER TREATMENT PLANT

 Internal double coat sand faced plaster.


 External double coat sand faced plaster.
 Slab top finish with brickbat coba w/p, line marking 12” x 12” with 5mm thick
string.
 Fixing of the Ceramic tile ( 12” x 12” ) flooring.
 Fixing of fiber grating on gutter.
 Fixing aluminum windows, half bottom sliding shutters & half top portion in
anodized aluminium louvers & glass folding m. s. door shutter.
 Internal painting in white cement two coats & externally as per project theme.
 Fixing of WTP, water pump panels on 12 mm thick w/p plywood.
 Providing of fixing of 2 nos - Light point, 15 amp plug point – 01 no., 5 amp plug
point 1 no., Incasing capping Patti.
 Installation of WTP plant & submersible pump in raw water tank & treated tank.
 Fixing of name board i.e. Water Treatment Plant.
 Take NOC by QAD Engineer.
 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.
 Flow Chart :-
Raw water tank pumping --- dual media filter --- activated carbon filter ---
softener --- brine solution & sodium hypo solution --- polishing carbon filter treated
water

 Environment:-
 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-


 Use helmet & safety shoes.
 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/333/REV-0
Page : 1 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
UNDER GROUND WATER TANK

 Quality:-

 Scope:- Applicable for all residential / commercial buildings.

 Equipment:-
1. Submersible Pump
2. Tools & plants
3. Machineries

 Responsibility:-
 HOD D&D
 site In charge
 Q.A.D. Engineer
 In charge Development

 Work Instructions:-
 HOD D&D to issue approved layout working drawings, RCC Drawings.
 Study & drawing preferable circular UGWT includes domestic PMC water, raw
water, fire water tank & underground pump room for fire pump ( rectangular in
shape).
 Verify & confirm capacity of under ground fire water tank i.e. ( a ) 50000 ltrs. per
building & OHWT 20000 ltrs. Per building if building height above 21.0 mtr. ( b )
If building height less than 21 mtr, capacity of OHWT 10000 ltrs per building.
 Line out.
 Finalization of top of water tank 1’0” above road level.
 Excavation up to required depth, considering, soling thickness if required.
 PCC thickness, raft thickness into in depth & top slab thickness.
 Excavation for the sump considering margin size for PCC raft & pardi.
 Soling & PCC.
 Box water proofing above PCC.
 Shuttering, Cutting ,binding reinforcement casting raft slab pardi and top slab (
before casting of slab inlet outlet overflow sleeve to refixt )
 Construct elevated manhole chambers in RCC pardi 3’ above tank FFL to avoid
contamination of STP water.
 Fixing of light weight CI chamber covers for all manholes.
 Box type waterproofing for outer periphery of the pardi cement ghotai water
proofing inside of the UGWT and top slab, outer periphery of the tank.
 Fixing of the M.S ladder with painting in fire pump room
 Installations of submersible water pump in tank fixating of control panel in WTP
room.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/333/REV-0
Page : 2 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
UNDER GROUND WATER TANK

 Fixing of Water tank identification boards on elevated chambers.


 Take NOC by QAD Engineer.
 In charge development to fill the checklist - C duly verified & approved by P.E. &
QAD.
 Checklist handover to HOD co-ordination dept.

 Environment:-
 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-


 Use helmet & safety shoes.
 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/334/REV-0
Page : 1 of 2
QEHS WORK INSTRUCTIONS FOR DEVELOPMENT OF
TITLE :
LANDSCAPED GARDEN

 Quality:-

 Scope:- Applicable for all residential / commercial buildings.

 Equipment:-
 Ghamela
 Phavada
 Pixas
 Hand roller
 Grass cutter machine
 Recreational equipment
 Tools & Plants
 Machineries

 Responsibility:-
 HOD D&D
 Site In charge
 Q.A.D. Engineer
 In charge Development
 Landscape Architect

 Work Instructions:-
 HOD D&D to issue approved landscaping drawing including layout details of soft
& hard landscaping, fountain, flower beds, RLS etc.
 Line out & mark RLS of finish landscaping.
 Laying of all conduits, waterline, construction of chambers, laying of fire fighting’s
pipe for court yard system, earthing, gutters, fixing of paving blocks, laying of all
cables for street light & decorative lights in garden.
 Fixing of street light & decorative light pole with foundation.
 Construction of all structures flowerbed in landscaping area & road side flooring
pattern, pathway.
 Fixing of recreational equipment.
 Laying of plumbing line for sprinkler & water supply to garden area.
 Removing & cleaning of rabbit, cementasius materials etc.
 Laying the one layer bricks hard & concrete area e.g. garden above podium slab.
 Filling of garden soil 8” depth for lawn area & 1’0” depth for
 Plantation area along with manure, vermi compost.
 Placing the CI ready benches in lawn area, pavilions & where necessary.
 Leveling, rolling, compaction, of lawn area.
 Plantation of the lawn & plants.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/334/REV-0
Page : 2 of 2
QEHS WORK INSTRUCTIONS FOR DEVELOPMENT OF
TITLE :
LANDSCAPED GARDEN

 Watering for 10 to 15 days daily.


 Take NOC by QAD Engineer.
 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.

 Environment:-
 Before the start of site cleaning, sprinkle water to reduce dust & prevent air
pollution.

 Health & Safety:-


 Ensure snake bit kit is available & used whenever required.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/335/REV-0
Page : 1 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
VERMICULTURE (BIOSANITIZER PROJECT IIT-CO. PAVAI
TECHNOLOGY)

 Quality:-

 Scope:- Applicable for all residential / commercial buildings.

 Equipment:-
 Tools & Plants
 Machineries

 Responsibility:-
 HOD Co-ordination Dept.
 Site In charge
 Q.A.D. Engineer
 In charge Development
 Vermiculture Consultant.

 Work Instructions:-
 HOD Co-ordination dept. to issue details vermiculture drawing.
 Lineout for vermiculture plants ( 7 pits ).
 9” soling 12” width below wall area only.
 PCC 1:3:6 for wall ( soling area )
 6” thick BBM 2’6” above the adjsent ground level.
 External side double coat sand faced plaster from GL to top of wall & inside 6”
from top of wall.
 Fixing of weld mesh fixed with angle frame covers on top of all 7 pits ( openable)
 Painting of shutter angle frame & external painting as per the project theme.
 No PCC soling in pit area, natural ground is required. Lay one large brick on natural
ground.
 Provide 2 ½” GI water spout to scape excess rain water from the pit.
 Fill of the pits 1’0” depth with garden waste.
 Charging of Biosanitizer pit by spreading Biosanitizer.
 Fix the name palate for each pit on external side of wall to identify days Sunday to
Saturday.
 Fixing of the instruction & notice board back side of the wall.
 Take NOC by QAD Engineer.
 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/335/REV-0
Page : 2 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
VERMICULTURE (BIOSANITIZER PROJECT IIT-CO. PAVAI
TECHNOLOGY)

 Environment:-
 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-


 Use helmet & safety shoes.
 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/336/REV-0
Page : 1 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
RAIN WATER HARVESTING

 Quality:-

 Scope:- Applicable for all residential / commercial buildings.

 Equipment:-
 Tools & Plants
 Machineries

 Responsibility:-
 HOD Co-ordination Dept.
 Site In charge
 Rain Water Harvesting Consultant
 RCC Consultant
 Q.A.D. Engineer
 In charge Development

 Work Instructions:-
 HOD Co-ordination dept. to issue working details drawing as per rain water
harvesting consultant’s survey at site.
 Line out rain water harvesting recharge pits / tanks in our premises at different
location as per the survey done by the rain water harvesting consultant.
 Bore the 6” dia holes up to 50’ depth at the center of the each recharge pit area &
bore the 6”dia holes as a bore well find point’s shown in consultant’s drawing.
Purpose to utilize the bore well after recharge the ground.
 Excavation for rain water harvesting pit’s.
 PCC for brick wall only, natural ground is required.
 9” BBM walls where recharge pit`s are in garden area & RCC pardi & top slab
designed for truck load.
 Casting of the top slab as per consultant drawing.
 Single coat sand faced plaster at periphery of the wall no internal plaster.
 Do 5mm dia holes for 6” bore pipe as per preporation up to 1.0 mtr length from
recharge pit G.L.
 Cover the top of pipe end cap.
 Cover the PVC pipe with G.I. mesh size 5mm x 5mm
 Filling the filter media 1” metal up to O.5 mtr depth.
 Connect the rain water gutters each recharge pit as a rain water inlet.
 Make a provision outlet from recharge pit to release excess water & connect to next
recharge pit.
 Fixing the identification board near recharge pit i.e. Rain Water Harvesting.
 Take NOC by QAD Engineer.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/336/REV-0
Page : 2 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
RAIN WATER HARVESTING

 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.

 Environment:-
 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-


 Use helmet & safety shoes.
 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/337/REV-0
Page : 1 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
GAS BANK

 Quality:-

 Scope:- Applicable for all residential/ commercial buildings.

 Equipment:-
 Gas meter
 M.S. pipe & Copper pipe
 Valves
 Tools & plants
 Machineries

 Responsibility:-
 HOD Co-ordination
 Site In charge
 Q.A.D. Engineer
 In charge Development

 Work Instructions:-
 Line out as per layout plan.
 Excavation for column footing.
 PCC.
 Shuttering, Cutting , binding, reinforcement, stub column, plinth beam, slab casting.
 9” brick masonry for plinth.
 Back filling, watering, compaction, 9” thick soling & PCC for plinth.
 Fixing of m. s. door frames ( size 5’ x 7’ ).
 Fixing of 3mm dia. proporated sheet 16” height periphery of the gas bank at plinth
level & slab beam bottom
 Internal double coat sand faced plaster.
 External double coat sand faced plaster.
 Slab top finish with brickbat coba w/p, line marking 12” x 12” with 5mm thick
string.
 Fixing of 2” thick rough shahabad flooring.
 Fixing of glass folding m.s. door shutter
 Internal painting in white cement two coats & externally as per project theme , door
frame, shutter in white oil paint & proporated sheet in black oil paint.
 Fixing of gas m. s. pipe network in gas bank up to building, running on parking
slab beam till kitchen duct up word vertical & connect to gas meter in dry balcony.
 Copper piping from gas meter to kitchen otta granite skirting top.
 Construction of inspection chamber with RCC covers at ground level.
 Yellow color oil paint 6” dia. at the center of chamber cover & write Gas.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/337/REV-0
Page : 2 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
GAS BANK

 Fixing of yellow color paving blocks on m. s. pipe route.


 Fixing of m. s. protection cage 7’ height for vertical m. s. pipe near gas bank &
buildings.
 Fixing of name board i.e. Gas Bank.
 Take NOC by QAD Engineer.
 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.

 Environment:-
 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-


 Use helmet & safety shoes.
 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/338/REV-0
Page : 1 of 1
QEHS WORK INSTRUCTIONS FOR PUMPING OF
TITLE :
CONCRETE

1.0 ENVIRONMENT :

1) Cut cement bag by removing stitches and charge directly in batching /


mixing plant to prevent waste of cement.
2) Do not throw / drop cement bags to prevent air pollution by dust generation.
3) Do not use water pipe having any leakage / damage to prevent waste of
water.
4) Water drums (storage tanks) should not leak.
5) Store empty cement bags separately for appropriate disposal or reuse.
6) Use kiltan / Hessian cloth to cover the concrete surface to reduce
evaporation loss.
7) Spilled & waste concrete should be used for temp structures.

2.0 HEALTH AND SAFETY:

1) Use safety helmet, safety shoes, rubber hand gloves and safety belt at height.
2) Ensure that placing of concrete is done in proper sequence.
3) Always use good quality ladder.
4) Use of safety net, if an opening in the slab.
5) Keep the area clean from iron bars and wooden pieces.
6) Concrete mixer and lifting machine must be properly checked before
starting of work.
7) Check the stability of scaffold carrying pipe for pumping of concrete or lift
is strong enough to bear the load of the pipe filled with concrete, water.
Building worker working on the platform is stable and strong.
8) Ensure that the building workers are out of the range of any kickbacks or
bucket full of concrete.
9) Ensure that the concrete bucket used with hoists is free from projection from
which accumulation of concrete could fall from height.
10) Use of earplug by vibrator operator
.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/339/REV-0
Page : 1 of 1

TITLE : QEHS WORK INSTRUCTIONS FOR SCAFFOLDING

1.0 ENVIRONMENT :

1) Do not use wooden scaffoldings.


2) Incase wooden / bamboo scaffolding is used, ensure reuse by proper storage.

2.0 HEALTH AND SAFETY:


1) Ensure steel scaffold is used with adequate support.
2) All metal scaffolds used in construction work should be in good condition.
3) Ensure scaffolds spaced as close as practicable, to ensure safety and stability
of such scaffold.
4) Ensure that the scaffolding is erected on sole plate or base plate.
5) Ledgers of metal scaffolds are placed at vertical intervals for safety and
stability of such scaffold.
6) Ensure that, the bracing is sufficient to prevent swing load, and tilting.
7) All workers involved in erection /dismantling of scaffold must use full body
safety belt and fall arrestor with life line.
8) Check all ladders are in good working conditions.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/340/REV-0
Page : 1 of 1
QEHS WORK INSTRUCTIONS FOR CLEANING OF UNDER
TITLE :
GROUND AND OVER HEAD WATER TANK

1.0 ENVIRONMENT:

1) Release tank – cleaning water to P.M.C / Town planning drainage


pipe / chamber.
2) After cleaning tank, test the water for drinking.
3) Ensure there is no toxic smell from the tank.
4) Tie oxygen mask and pipe before entering.
5) Decide signaling mode before a person entering in case of
emergency.
6) Provide sufficient light inside tank.

2.0 HEALTH AND SAFETY :


1) Set frequency for cleaning tanks and display it water tank.
2) Sludge removed from the tank should be disposed off properly.
3) Under ground / over head tank should be cleaned at regular
interval.
4) After cleaning lime should be applied in the inner surface.
5) Use safe and sufficient ladder for working.
6) Use helmet, safety shoes, rubber gloves and mask while working.
7) Always keep one man out side the over head / underground water
tank while working.
8) While sending any person inside tank ensure:
I. Ensure water tank is empty before starting the work.
II. There is no gas / fumes formation in the tank.
III. For adequate lighting use low voltage lamps (24 volts).
9) Provide adequate air while working inside.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/341/REV-0
Page : 1 of 1
QEHS WORK INSTRUCTIONS FOR USING LADDER AS PER
TITLE :
DESIGN

1.0 QUALITY

Not Applicable

2.0 ENVIRONMENT:

1) Release tank – cleaning water to P.M.C / Town planning drainage


pipe / chamber.
2) After cleaning tank, test the water for drinking.
3) Ensure there is no toxic smell from the tank.
4) Tie oxygen mask and pipe before entering.
5) Decide signaling mode before a person entering in case of
emergency.
6) Provide sufficient light inside tank.

3.0 HEALTH AND SAFETY :


1) Set frequency for cleaning tanks and display it water tank.
2) Sludge removed from the tank should be disposed off properly.
3) Under ground / over head tank should be cleaned at regular
interval.
4) After cleaning lime should be applied in the inner surface.
5) Use safe and sufficient ladder for working.
6) Use helmet, safety shoes, rubber gloves and mask while working.
7) Always keep one man out side the over head / underground water
tank while working.
8) While sending any person inside tank ensure:
I. Water level is safe for working.
II. There is no gas / fumes formation in the tank.
III. For lighting use low voltage lamps (24 volts).
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/342/REV-0
Page : 1 of 2

TITLE : QEHS WORK INSTRUCTIONS FOR HOUSEKEEPING

1.0 QUALITY

Not applicable

2.0 ENVIRONMENT :

1) Reduce use / waste of paper by using e – mail and other electronic


media.
2) Reduce waste of electricity by putting off A.C’s Fan’s, and lights
when not using or going away from the place. Install electric sensors
in rush areas to enable automatic on / off of electrical fixtures.
3) Do not use A.C. when you are comfortable with fan ( This will
prevent ozone depletion)
4) Ensure water taps in the washroom are closed after use.
5) Incase water leak is observed close it immediately.

3.0 HEALTH AND SAFETY:

1) Make workers aware of safety measurers.


2) Provide training on emergency preparedness and response.
3) Ensure the emergency doors kept free from obstacles.
4) Ensure fire – fighting system is in working condition.
5) Keep the workplace neat and tidy, dust free.
6) Passages are marked.
7) Areas are designated.
8) Unwanted material removed.
9) Keep gangways cleared.
10) Use area productively.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/342/REV-0
Page : 2 of 2

TITLE : QEHS WORK INSTRUCTIONS FOR HOUSEKEEPING

11) Ensure there is place for everything and everything in its place.
12) Files, records, drawings are indexed, ensure fast retrieval.
13) Ensure files / papers / documents kept at their place.
14) Ensure the lights and fans are switched off when not in use.
15) Ensure air conditioners switched off when not occupied.
16) Ensure visual control displayed (posters, sign, graphs, symbols etc.)
17) Ensure employees have undergone training on health, hygiene,
safety, environment, and housekeeping.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/343/REV-0
Page : 1 of 1
QEHS WORK INSTRUCTIONS FOR MONITORING AND
TITLE :
MEASURING OF NOISE, LIGHT & DUST

1. LIGHT:
a. If lighting on work place is below specified level, efforts shall be
made
to improve it and bring it to specified level.
b. Over illumination should be avoided.
c. All lights should be switched off at the end of the work.
d. Use maximum of low watt appliances / lighting source ( eg:- meta
halide lamps, CFL, Solar lamps eco friendly electrical products)

2. NOISE:
Measure noise after every 6 months for all machines and D.G.Sets, if noise
level is above 75 decibels at point of operations, efforts shall be made to
reduce it and the report is submitted to Management Representative.

3. DUST: (SPM)
It will be checked after every 6 months by outside party, record shall be
maintained, if dust levels are above specified level efforts shall be made to
bring it to specified limits. dust level shall be checked at site.

4. LIGHT NOISE AND DUST:


Light Noise and Dust levels shall be monitored and recorded. In case of
non – conformance, it shall be recorded and corrective / preventive action
shall be initiated.

5. RECORDS:
Air, SPM, Noise monitoring reports maintained by site in – charge.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/344/REV-0
Page : 1 of 1
QEHS WORK INSTRUCTIONS FOR CONTROL AND
TITLE :
MONITORING OF WASTE GENERATED IN
CONSTRUCTION

1.0 ENVIRONMENT:
1) Scrap such as steel, broken tiles, wooden cut ends and plastics shall
be collected everyday and kept in designated area for reuse /
disposal.
2) Sale / disposal of scrap to be done to recyclers through scrap
vendors.
3) Scrap shall be sorted out and kept in separate bins.

2.0 HEALTH AND SAFETY:


1) Removal of scrap Accumulated scrap at the sites shall be removed on
daily basis and shall be put in respective bin at scrap yard.
2) Ensure that scrap / waste material is disposed off without spilling
anywhere.
3) While transporting waste ensure that containers etc. are not
overloaded or over filled. Overloading / over filling will cause
accidents. Spillage (leading to material waste and soil
contamination).
4) Use hand gloves while handling scrap.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/345/REV-0
Page : 1 of 1

QEHS WORK INSTRUCTIONS FOR PILLING AND


TITLE :
CONSTRUCTION OF MANHOLE AND LAYING OF RCC
PIPES

1.0 ENVIRONMENT

1.1 Prevent wastage of water.


1.2 Do not allow sludge of mud to spread over the area.
1.3 Barricade the piling area to reduce noise and air pollution.

2.0 Health and Safety

2.1 Ensure piling work is carried out by the trained persons.


2.2 Ensure the piling machine operator is trained and has sufficient experience.
2.3 Ensure persons do not gather around the piling machine.
2.4 Use hand gloves during the removal of piles and pile caps.
2.5 Ensure pile bore is covered from all sides and no person is allowed in that area.
2.6 Ensure machinery used is checked as per respective checklist for safe operations.
2.7 Ensure person who enters the manhole has adequate communication facility with
him.
2.8 Ensure air is blown inside the manhole when any worker is working on site.
2.9 After work is over close the manhole by barricading so as to prevent a fall inside
manhole.
2.10 Ensure RCC pipes are lifted by the crane and put into the trench.
2.11 Do not allow persons to pull the pipe and put it in the trench.
2.12 Ensure before joining the pipe there are no individuals working inside.
2.13 Carry out back filling after the pipes are laid down and clear the ground surface.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/346/REV-0 Page : 1 of 2

QEHS WORK INSTRUCTIONS FOR USE OF CONSTRUCTION


TITLE :
EQUIPMENT AT SITE

1. Drivers, operators of plant and machinery are knowledgeable, experienced,


competent and are above 18 years. Only authorized drivers and operators are
allowed to operate plant and machinery.

2. Preventive maintenance schedules are strictly adhered to ensure that all plant and
machinery are systematically inspected, serviced, repaired and maintained as
necessary. Brakes are checked regularly.

3. Non-essential personnel are kept well away from the area of operation and trained
signal man are provided wherever necessary.

4. Site speed limit of 20 Km/hr. for all vehicles is strictly enforced.

5. Plant accessories & spares are kept at defined place.

6. Moving vehicles are fitted with proper rear view mirror and reversing alarms.
Vehicles are not moved in reverse without directions from cleaner.

7. Employees and workmen working in the vicinity of earth moving operations are
working with safety helmets, shoes, eye-glasses, if required.

8. Sleeping / resting under or rear side of vehicle like Tippers, Hyvas, Hydra,
Tractors, etc. are strictly prohibited. This is checked by watchman appointed at
various locations. No unauthorized person is allowed to enter in driver’s cabin.

9. Vehicles are not parked on a slope for push starting, if battery is weak. All vehicles
are having self-starter.

10. No workman other than operator is allowed to sit / ride on stationery or moving
tower crane, mobile crane etc. No. passengers are allowed in operator’s cabin.

11. Walky talky is provided, if required for better communication between crane
operator and lifting gang.

12. Inspection of wire-rope of cranes is carried out by Mech. I/c.

13. Operating any machine beyond its design limits can damage the machine & it can
cause very serious accidents. Any machine is not overloaded.

IMS Work Instruction Manual


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/346/REV-0 Page : 2 of 2

QEHS WORK INSTRUCTIONS FOR USE OF CONSTRUCTION


TITLE :
EQUIPMENT AT SITE

14. The engine of any machine has exposed rotating parts. Engine cover is not opened
while the engine is running. All other guards & protective devices are in place
while operating any machine.

15. While using excavator, because of long boom & dipper arm, one must be very
careful when slewing. Operator should not slew quickly and strike the dipper arm
against any obstacle.

16. Loose clothing is not used by operator as it can catch in moving parts of machine
and cause serious accidents.

17. While lifting the load by crane, nobody should work / stand in the crane coverage
area.

18. Ensure the use of air plug while working in noisy area to avoid deafness / irritation
to individuals.

IMS Work Instruction Manual


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/347/REV-0
Page : 1 of 2

TITLE : QEHS WORK INSTRUCTIONS FOR OPERATION OF TOWER CRANE

1.0 ENVIRONMENT:
1.1 Do not allow leakage/spillage of oil & Grease used.
1.2 Do not throw oil / grease rags in open area, use bins.
1.3 Lifting of material plan should be made to ensure effective usage of
electrical energy for operation; switch off when not in use.

2.0 HEALTH AND SAFETY:


2.1 Ensure incoming voltage at crane panel specified power supply, proper
earthing & lightening arrestor as specified in the crane manufacturer
manual.
2.2 Ensure wire rope, slings are in good condition and tested.
2.3 Check the function of Load limit switch, Trolley Limit switch, and Hoisting
Limit switch before operation.
2.4 Check split pins of tower mast, cathead and tension bar.
2.5 Ensure greasing is carried out for wire ropes and nipples, Drums, Bearings.
2.6 Ensure exposed moving parts, including gears, shafts, and sprockets are
properly guarded.
2.7 Load chart of the tower crane must be available with crane operator.
2.8 Load capacity to be placed on the boom at specified distance.
2.9 Ensure hoisting hook and safety latch in good condition.
2.10 Ensure signal man available during operation and communication device /
method is defined.
2.11 Anemometer is provided on crane to know the wind speed to enable
operator stop the operations in case of strong wind
2.12 Make sure sufficient lighting arrangement in case of night operation.
2.13 Check the tightness of mast mounting bolts.
2.14 Ensure crane operator is medically fit and daily checklist is used by
operator.
2.15 Install fall arrester and make sure operators are using safety belt while
climbing to cabin (Ascending /Descending).
2.16 Use of PPE Safety belt, Helmet, fall arrestor, life line available and used.
2.17 Load chart and other warnings are displayed for easy reference to the
operator and others in vicinity.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/347/REV-0
Page : 2 of 2

TITLE : QEHS WORK INSTRUCTIONS FOR OPERATION OF TOWER CRANE

2.18 Ensure first aid box, is available in operator cabin.


2.19 Ensure there is portable fire extinguisher (1 or 2 kg) in operator cabin.
2.20 Report any unusual noise or sound during operation.
2.21 Ensure Third party inspection carried out in every 12 months by competent
person.
2.22 Ensure wire rope and slings inspected on every six months
2.23 Ensure the signalman provided with reflective jackets.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/348/REV-0
Page : 1 of 1

TITLE : QEHS WORK INSTRUCTIONS FOR LOADING, UNLOADING AND


HANDLING OF MATERIAL

1) Suitable footwear, safety helmets and necessary PPEs are used by personnel during
loading, unloading and handling of material.
2) Vehicles are not overloaded by any materials.
3) Proper approaches for vehicle movements are ensured around the site. Approach
roads are fairly leveled and compacted to avoid skidding of vehicles.
4) Proper capacity wire rope is used while handling the material with cranes.

5) Valid test certificates of wire rope sling, chain pulley block, wire ropes, pulley, etc.
are maintained.
6) Hand gloves are worn by workers while handling / shifting steel.
7) Suitable equipment is used to lift the steelwork.

8) Good housekeeping standards are maintained in steel yard in order to prevent


slips, trips and falls.
9) Experienced and trained persons are engaged with adequate supervision for
loading, unloading and handling of materials.
10) proper tools are used by steel fixers in order to assist in bar bending type activities.
11) Exposed vertical bars, if observed are bent, covered or protected by some other
means.
12) Construction materials are not stacked on the floors more than the allowable loads
and are stacked in safe manner.
13) Material is stored in designated areas.
14) Handling of shuttering material, scaffolding, concrete bucket, precast components,
blocks, Siporex slabs by crane is controlled by experienced operators and where
necessary, with the help of signalman. While lifting the load by crane, it is ensured
that nobody is present in crane coverage area.
15) Safety shoes, dust mask and hand gloves are used by workers while loading,
unloading and shifting of cement bags.
16) Use of hand gloves is ensured while handling wire-rope slings.
17) It is ensured by supervisors and operators that all overload relays & limit switches
of material handling equipment like tower crane, mobile crane are in perfect
working condition.
18) Walky talky is provided, if required for better communication between crane
operator and lifting gang.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/349/REV-0
Page : 1 of 1

QEHS WORK INSTRUCTIONS FOR FABRICATION,


TITLE :
ALUMINUM AND GLASS WORK.

1.0 ENVIRONMENT:

1.1 Do not allow aluminum powder to spread in the air,


1.2 Ensure aluminum cut pieces are deposited in scrap yard for recycle and reuse.
1.3 In case of acetylene gas leakage or backfire, sprinkle continuous water.
1.4 Prepare bar bending / cutting schedule in advance.
1.5 Cut the bars / sections to correct length and reduce wastage of steel/
Aluminum.
1.6 Control and minimize wastage of material.

2.0 HEALTH AND SAFETY:


2.1 Unwanted people should not enter near any welding spot.
2.2 Use of welding / cutting goggles and welding shield is must for welder, and
helper.
2.3 Use flash back arrestor while using gas cutting torch.
2.4 Always keep a fire extinguisher (ABC type Dry powder / CO2 type) near
welding & gas cutting spot)
2.5 Do not roll the gas cylinders.
2.6 For glasswork, use gloves.
2.7 Always use hand gloves, while working at height ensure use of safety shoes,
helmet and safety belt.
2.8 Use special clamps for holding of glass sheet (Vacuum lifter)
2.9 Use proper cutting tools, Edges of cut glasses should be polished / grounded.
2.10 Use proper glass cutting and drilling tools.
2.11 Use hand gloves, goggles, ear plugs while cutting.
2.12 Obtain hot work permit.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/330/REV-0
Page : 1 of 3
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
L.T. ROOM & INSTALLATION OF TRANSFORMER

 Quality:-

 Scope:- Applicable for residential & commercial buildings.

 Equipment:-
 Megar
 Tongue tester
 Cramping tools
 Spanner
 Screw Driver
 Tester
 Plier
 Hacksaw
 Hammer
 Wire cutting pliers
 Knife
 Tools & plants
 Machineries

 Responsibility:-
 HOD D&D
 Electrical Consultant
 Licensed Electrical Contractor
 Site In charge
 Q.A.D. Engineer
 In charge Development

 Work Instructions:-
 Take the necessary sanction through M.S.E.D. Co. Ltd. through licensed
electrical contractor.
 HOD D&D to issue a layout approved and detail drawing prepared & verified by
electrical consultant.
 Study of drawings.
 Line out of the L.T. / transformer room.
 Excavation for footings.
 PCC for footings.
 Centre line marking for footing column.
 Shuttering, cutting, binding, reinforcement, casting footing, stub column, plinth
beam & slab.
 9” thick BBM for cable trenches as per the layout.
 Back filling up to soling bottom with watering & compaction.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/330/REV-0
Page : 2 of 3
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
L.T. ROOM & INSTALLATION OF TRANSFORMER

 9” thick soling murum spreading, watering, & compaction for the entire plinth..
 PCC for plinth.
 9” thick BBM above the plinth openings as per working drawing.
 Internal gypsum finish plaster.
 External double coat sand faced plaster.
 Slab top finish with brickbat coba water proofing with line marking 12” x 12”, 5mm
thick string.
 Cable trench cement ghotai plaster sides & bottom.
 12” x 12” ceramic tile flooring.
 Fixing m. s. grating on cable trench.
 Internal OBD painting & external as per project theme.
 Fixing of the rolling shutter size 9’0” x 10’0”, service door 5’0” x 8’0” two panel
m.s. folding door no. as per requirement.
 Fixing of the anodized / powder coated aluminum window bottom half in aluminum
luvers & top half sliding shutters.
 Installation of transformer – LT, HT cable panel.
 Write the safety instructions on wall inside the room identification for cable &
transformer.
 Fixing of rubberized tiles 2’0” x 2’0” on ceramic flooring.
 Laying & connection of HT cable coming from M.S.E.D. Co. Ltd. HT pole to HT
feeder pillar near our project. HT feeder pillar to HT feeder pillar in transformer
room then feeder pillar to transformer.
 Laying the LT cable coming from transformer to LT feeder pillar in transformer
room, then connects to feeder pillar near the bldg. Distribution of LT cable from
feeder pillar to individual bldg. bus bar in meter room.
 Construction of inspection chamber in 9” thick B.B.M. every 50’0” length with
RCC chamber cover.
 Fixing of name board i.e. LT / Transformer.
 Take NOC by QAD Engineer.
 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/330/REV-0
Page : 3 of 3
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
L.T. ROOM & INSTALLATION OF TRANSFORMER

 Environment:-

 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-

 Use helmet & safety shoes.


 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
 Always engage qualified and trained electrician.
 Ensure adequate earthing before starting the equipment.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/331/REV-0
Page : 1 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION AND
TITLE :
INSTALLATION OF SEWAGE TREATMENT PLANT

 Quality:-

 Scope:- Applicable For Residential and Commercial Bldg

 Equipment:-
 Air blower
 Dual media filter
 Activated carbon filter
 Feed pump
 Air grid
 Tool kit
 Dosing tank 100 lit - 2 nos
 Exhaust fan – 01 no.
 Cleaning jar – 01 no.
 Plastic bucket – 02 nos
 Hypo chlorine & poly dosing powder
 Tools & plants
 Machineries

 Responsibility:-
 HOD D&D Co-ordination Department
 Site In charge
 Q.A.D. Engineer
 In charge Development

 Work Instructions:-
 HOD Co-ordination issue approved layout drawings.
 HOD D&D to issue RCC drawings.
 Study of drawings.
 Line out for bar screen chamber oil & grease chamber equalization tank fab1, fab2
tank tube shetler tank, chlorine contact tank, sludge digester tank & treated water
tank.
 Excavation for all tanks.
 PCC for all tanks.
 Box type water proofing above the P.C.C.
 Shuttering, cutting, binding reinforcement and casting of raft pardi and slab.
 Box type W/P for the RCC pardi.
 Internal w/p smooth cement ghotai patra finish.
 External double coat sand faced plaster which are above the ground ( fab1, fab2
tube shetler chlorine contact tank).
 Fixing of the m.s. chamber cover top of slab finish with smooth cement ghotai w/p.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/331/REV-0
Page : 2 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION AND
TITLE :
INSTALLATION OF SEWAGE TREATMENT PLANT

 Fixing of m.s. ladder to climb fab1, fab2.


 M.S railing for fab1, fab2 and tube shetler 3’6” height safety purpose.
 Painting as per project theme.
 Construction of foundation, air blower pump, activated carbon filter and dual media
carbon filter.
 Installation of STP plant i.e. air blowers activated carbon filter and dual media filter
fixing of bar screen chamber, laying of air grid pipe lines at equliasation tank,
treated water tank and fab1, fab2.
 Construction of room or sound proof canopy for the air level to maintain noise level
below 50 decibel.
 Commissioning of the plant training given to operator, concern supervisor &
society manager.
 Fixing of name board i.e. Sewage Treatment Plant.
 Take NOC by QAD Engineer.
 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.

 Flow chart :-
Inlet to bar screen chamber --- oil & grees chamber --- equalization tank --- fab
reactor --- tube shetler --- chlorine contact tank --- filter feed tank ( dual media filter
activated carbon filter ACF ) --- sludge digester--- treated water tank

 Environment:-
 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-


 Use helmet & safety shoes.
 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/332/REV-0
Page : 1 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION AND
TITLE :
INSTALLATION OF WATER TREATMENT PLANT

 Quality:-

 Scope:- Applicable for all residential/ commercial buildings.

 Equipment:-
 Raw water Pump - 02 nos.
 Dual Media filter (sand filter) – 01 no.
 ACF ( Activated carbon filter) – 01no.
 Softener – 01 no.
 Brine solution tank – 01 no.
 Chlorine dosing pump – 02 nos.
 Chlorine dosing Tank – 01 no.
 Pump power panel – 01 no.
 Polishing carbon filter – 01 no.
 Work manual
 Tools & plants
 Machineries

 Responsibility:-
 HOD Co-ordination
 Site In charge
 Q.A.D. Engineer
 In charge Development

 Work Instructions:-
 HOD Co-ordination to issue approved working drawings.
 Study of drawings.
 Study of drawings.
 Confirm clear height 4 mtr from FFL to bottom of slab & size as per approved
drawing.
 Line out as per layout plan.
 Excavation for column footing.
 PCC.
 Shuttering, Cutting , binding, reinforcement, stub column, plinth beam, slab casting.
 9” brick masonry for plinth.
 Back filling, soling & PCC for plinth.
 9” soling for WTP Room.
 Fixing of m. s. subframes for windows & door frames ( size 5’ x 8’ ).
 Construction of gutter with ghotai plaster to run all pipe lines concealed in gutter.
 Construction of 6” raised plat form size 2 mtr x 1 mtr for stacking salt bags.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/332/REV-0
Page : 2 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION AND
TITLE :
INSTALLATION OF WATER TREATMENT PLANT

 Internal double coat sand faced plaster.


 External double coat sand faced plaster.
 Slab top finish with brickbat coba w/p, line marking 12” x 12” with 5mm thick
string.
 Fixing of the Ceramic tile ( 12” x 12” ) flooring.
 Fixing of fiber grating on gutter.
 Fixing aluminum windows, half bottom sliding shutters & half top portion in
anodized aluminium louvers & glass folding m. s. door shutter.
 Internal painting in white cement two coats & externally as per project theme.
 Fixing of WTP, water pump panels on 12 mm thick w/p plywood.
 Providing of fixing of 2 nos - Light point, 15 amp plug point – 01 no., 5 amp plug
point 1 no., Incasing capping Patti.
 Installation of WTP plant & submersible pump in raw water tank & treated tank.
 Fixing of name board i.e. Water Treatment Plant.
 Take NOC by QAD Engineer.
 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.
 Flow Chart :-
Raw water tank pumping --- dual media filter --- activated carbon filter ---
softener --- brine solution & sodium hypo solution --- polishing carbon filter treated
water

 Environment:-
 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-


 Use helmet & safety shoes.
 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/333/REV-0
Page : 1 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
UNDER GROUND WATER TANK

 Quality:-

 Scope:- Applicable for all residential / commercial buildings.

 Equipment:-
1. Submersible Pump
2. Tools & plants
3. Machineries

 Responsibility:-
 HOD D&D
 site In charge
 Q.A.D. Engineer
 In charge Development

 Work Instructions:-
 HOD D&D to issue approved layout working drawings, RCC Drawings.
 Study & drawing preferable circular UGWT includes domestic PMC water, raw
water, fire water tank & underground pump room for fire pump ( rectangular in
shape).
 Verify & confirm capacity of under ground fire water tank i.e. ( a ) 50000 ltrs. per
building & OHWT 20000 ltrs. Per building if building height above 21.0 mtr. ( b )
If building height less than 21 mtr, capacity of OHWT 10000 ltrs per building.
 Line out.
 Finalization of top of water tank 1’0” above road level.
 Excavation up to required depth, considering, soling thickness if required.
 PCC thickness, raft thickness into in depth & top slab thickness.
 Excavation for the sump considering margin size for PCC raft & pardi.
 Soling & PCC.
 Box water proofing above PCC.
 Shuttering, Cutting ,binding reinforcement casting raft slab pardi and top slab (
before casting of slab inlet outlet overflow sleeve to refixt )
 Construct elevated manhole chambers in RCC pardi 3’ above tank FFL to avoid
contamination of STP water.
 Fixing of light weight CI chamber covers for all manholes.
 Box type waterproofing for outer periphery of the pardi cement ghotai water
proofing inside of the UGWT and top slab, outer periphery of the tank.
 Fixing of the M.S ladder with painting in fire pump room
 Installations of submersible water pump in tank fixating of control panel in WTP
room.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/333/REV-0
Page : 2 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
UNDER GROUND WATER TANK

 Fixing of Water tank identification boards on elevated chambers.


 Take NOC by QAD Engineer.
 In charge development to fill the checklist - C duly verified & approved by P.E. &
QAD.
 Checklist handover to HOD co-ordination dept.

 Environment:-
 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-


 Use helmet & safety shoes.
 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/334/REV-0
Page : 1 of 2
QEHS WORK INSTRUCTIONS FOR DEVELOPMENT OF
TITLE :
LANDSCAPED GARDEN

 Quality:-

 Scope:- Applicable for all residential / commercial buildings.

 Equipment:-
 Ghamela
 Phavada
 Pixas
 Hand roller
 Grass cutter machine
 Recreational equipment
 Tools & Plants
 Machineries

 Responsibility:-
 HOD D&D
 Site In charge
 Q.A.D. Engineer
 In charge Development
 Landscape Architect

 Work Instructions:-
 HOD D&D to issue approved landscaping drawing including layout details of soft
& hard landscaping, fountain, flower beds, RLS etc.
 Line out & mark RLS of finish landscaping.
 Laying of all conduits, waterline, construction of chambers, laying of fire fighting’s
pipe for court yard system, earthing, gutters, fixing of paving blocks, laying of all
cables for street light & decorative lights in garden.
 Fixing of street light & decorative light pole with foundation.
 Construction of all structures flowerbed in landscaping area & road side flooring
pattern, pathway.
 Fixing of recreational equipment.
 Laying of plumbing line for sprinkler & water supply to garden area.
 Removing & cleaning of rabbit, cementasius materials etc.
 Laying the one layer bricks hard & concrete area e.g. garden above podium slab.
 Filling of garden soil 8” depth for lawn area & 1’0” depth for
 Plantation area along with manure, vermi compost.
 Placing the CI ready benches in lawn area, pavilions & where necessary.
 Leveling, rolling, compaction, of lawn area.
 Plantation of the lawn & plants.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/334/REV-0
Page : 2 of 2
QEHS WORK INSTRUCTIONS FOR DEVELOPMENT OF
TITLE :
LANDSCAPED GARDEN

 Watering for 10 to 15 days daily.


 Take NOC by QAD Engineer.
 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.

 Environment:-
 Before the start of site cleaning, sprinkle water to reduce dust & prevent air
pollution.

 Health & Safety:-


 Ensure snake bit kit is available & used whenever required.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/335/REV-0
Page : 1 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
VERMICULTURE (BIOSANITIZER PROJECT IIT-CO. PAVAI
TECHNOLOGY)

 Quality:-

 Scope:- Applicable for all residential / commercial buildings.

 Equipment:-
 Tools & Plants
 Machineries

 Responsibility:-
 HOD Co-ordination Dept.
 Site In charge
 Q.A.D. Engineer
 In charge Development
 Vermiculture Consultant.

 Work Instructions:-
 HOD Co-ordination dept. to issue details vermiculture drawing.
 Lineout for vermiculture plants ( 7 pits ).
 9” soling 12” width below wall area only.
 PCC 1:3:6 for wall ( soling area )
 6” thick BBM 2’6” above the adjsent ground level.
 External side double coat sand faced plaster from GL to top of wall & inside 6”
from top of wall.
 Fixing of weld mesh fixed with angle frame covers on top of all 7 pits ( openable)
 Painting of shutter angle frame & external painting as per the project theme.
 No PCC soling in pit area, natural ground is required. Lay one large brick on natural
ground.
 Provide 2 ½” GI water spout to scape excess rain water from the pit.
 Fill of the pits 1’0” depth with garden waste.
 Charging of Biosanitizer pit by spreading Biosanitizer.
 Fix the name palate for each pit on external side of wall to identify days Sunday to
Saturday.
 Fixing of the instruction & notice board back side of the wall.
 Take NOC by QAD Engineer.
 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/335/REV-0
Page : 2 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
VERMICULTURE (BIOSANITIZER PROJECT IIT-CO. PAVAI
TECHNOLOGY)

 Environment:-
 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-


 Use helmet & safety shoes.
 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/336/REV-0
Page : 1 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
RAIN WATER HARVESTING

 Quality:-

 Scope:- Applicable for all residential / commercial buildings.

 Equipment:-
 Tools & Plants
 Machineries

 Responsibility:-
 HOD Co-ordination Dept.
 Site In charge
 Rain Water Harvesting Consultant
 RCC Consultant
 Q.A.D. Engineer
 In charge Development

 Work Instructions:-
 HOD Co-ordination dept. to issue working details drawing as per rain water
harvesting consultant’s survey at site.
 Line out rain water harvesting recharge pits / tanks in our premises at different
location as per the survey done by the rain water harvesting consultant.
 Bore the 6” dia holes up to 50’ depth at the center of the each recharge pit area &
bore the 6”dia holes as a bore well find point’s shown in consultant’s drawing.
Purpose to utilize the bore well after recharge the ground.
 Excavation for rain water harvesting pit’s.
 PCC for brick wall only, natural ground is required.
 9” BBM walls where recharge pit`s are in garden area & RCC pardi & top slab
designed for truck load.
 Casting of the top slab as per consultant drawing.
 Single coat sand faced plaster at periphery of the wall no internal plaster.
 Do 5mm dia holes for 6” bore pipe as per preporation up to 1.0 mtr length from
recharge pit G.L.
 Cover the top of pipe end cap.
 Cover the PVC pipe with G.I. mesh size 5mm x 5mm
 Filling the filter media 1” metal up to O.5 mtr depth.
 Connect the rain water gutters each recharge pit as a rain water inlet.
 Make a provision outlet from recharge pit to release excess water & connect to next
recharge pit.
 Fixing the identification board near recharge pit i.e. Rain Water Harvesting.
 Take NOC by QAD Engineer.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/336/REV-0
Page : 2 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
RAIN WATER HARVESTING

 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.

 Environment:-
 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-


 Use helmet & safety shoes.
 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/337/REV-0
Page : 1 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
GAS BANK

 Quality:-

 Scope:- Applicable for all residential/ commercial buildings.

 Equipment:-
 Gas meter
 M.S. pipe & Copper pipe
 Valves
 Tools & plants
 Machineries

 Responsibility:-
 HOD Co-ordination
 Site In charge
 Q.A.D. Engineer
 In charge Development

 Work Instructions:-
 Line out as per layout plan.
 Excavation for column footing.
 PCC.
 Shuttering, Cutting , binding, reinforcement, stub column, plinth beam, slab casting.
 9” brick masonry for plinth.
 Back filling, watering, compaction, 9” thick soling & PCC for plinth.
 Fixing of m. s. door frames ( size 5’ x 7’ ).
 Fixing of 3mm dia. proporated sheet 16” height periphery of the gas bank at plinth
level & slab beam bottom
 Internal double coat sand faced plaster.
 External double coat sand faced plaster.
 Slab top finish with brickbat coba w/p, line marking 12” x 12” with 5mm thick
string.
 Fixing of 2” thick rough shahabad flooring.
 Fixing of glass folding m.s. door shutter
 Internal painting in white cement two coats & externally as per project theme , door
frame, shutter in white oil paint & proporated sheet in black oil paint.
 Fixing of gas m. s. pipe network in gas bank up to building, running on parking
slab beam till kitchen duct up word vertical & connect to gas meter in dry balcony.
 Copper piping from gas meter to kitchen otta granite skirting top.
 Construction of inspection chamber with RCC covers at ground level.
 Yellow color oil paint 6” dia. at the center of chamber cover & write Gas.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/337/REV-0
Page : 2 of 2
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
GAS BANK

 Fixing of yellow color paving blocks on m. s. pipe route.


 Fixing of m. s. protection cage 7’ height for vertical m. s. pipe near gas bank &
buildings.
 Fixing of name board i.e. Gas Bank.
 Take NOC by QAD Engineer.
 In charge development to fill the checklist – ‘C’ duly verified & approved by P.E.
& QAD.
 Checklist handover to HOD co-ordination dept.

 Environment:-
 During excavation sprinkle the water to reduce dust and prevent air pollution.
 G.I. sheet as barricading to reduce noise level of machineries.

 Health & Safety:-


 Use helmet & safety shoes.
 Before digging check underground utilities like water, gas & electricity etc.
 Ensure snake bite kit is available in case of emergency.
 First aid box with medicines available at site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/338/REV-0
Page : 1 of 1
QEHS WORK INSTRUCTIONS FOR PUMPING OF
TITLE :
CONCRETE

1.0 ENVIRONMENT :

1) Cut cement bag by removing stitches and charge directly in batching /


mixing plant to prevent waste of cement.
2) Do not throw / drop cement bags to prevent air pollution by dust generation.
3) Do not use water pipe having any leakage / damage to prevent waste of
water.
4) Water drums (storage tanks) should not leak.
5) Store empty cement bags separately for appropriate disposal or reuse.
6) Use kiltan / Hessian cloth to cover the concrete surface to reduce
evaporation loss.
7) Spilled & waste concrete should be used for temp structures.

2.0 HEALTH AND SAFETY:

1) Use safety helmet, safety shoes, rubber hand gloves and safety belt at height.
2) Ensure that placing of concrete is done in proper sequence.
3) Always use good quality ladder.
4) Use of safety net, if an opening in the slab.
5) Keep the area clean from iron bars and wooden pieces.
6) Concrete mixer and lifting machine must be properly checked before
starting of work.
7) Check the stability of scaffold carrying pipe for pumping of concrete or lift
is strong enough to bear the load of the pipe filled with concrete, water.
Building worker working on the platform is stable and strong.
8) Ensure that the building workers are out of the range of any kickbacks or
bucket full of concrete.
9) Ensure that the concrete bucket used with hoists is free from projection from
which accumulation of concrete could fall from height.
10) Use of earplug by vibrator operator
.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/339/REV-0
Page : 1 of 1

TITLE : QEHS WORK INSTRUCTIONS FOR SCAFFOLDING

1.0 ENVIRONMENT :

1) Do not use wooden scaffoldings.


2) Incase wooden / bamboo scaffolding is used, ensure reuse by proper storage.

2.0 HEALTH AND SAFETY:


1) Ensure steel scaffold is used with adequate support.
2) All metal scaffolds used in construction work should be in good condition.
3) Ensure scaffolds spaced as close as practicable, to ensure safety and stability
of such scaffold.
4) Ensure that the scaffolding is erected on sole plate or base plate.
5) Ledgers of metal scaffolds are placed at vertical intervals for safety and
stability of such scaffold.
6) Ensure that, the bracing is sufficient to prevent swing load, and tilting.
7) All workers involved in erection /dismantling of scaffold must use full body
safety belt and fall arrestor with life line.
8) Check all ladders are in good working conditions.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/340/REV-0
Page : 1 of 1
QEHS WORK INSTRUCTIONS FOR CLEANING OF UNDER
TITLE :
GROUND AND OVER HEAD WATER TANK

1.0 ENVIRONMENT:

1) Release tank – cleaning water to P.M.C / Town planning drainage


pipe / chamber.
2) After cleaning tank, test the water for drinking.
3) Ensure there is no toxic smell from the tank.
4) Tie oxygen mask and pipe before entering.
5) Decide signaling mode before a person entering in case of
emergency.
6) Provide sufficient light inside tank.

2.0 HEALTH AND SAFETY :


1) Set frequency for cleaning tanks and display it water tank.
2) Sludge removed from the tank should be disposed off properly.
3) Under ground / over head tank should be cleaned at regular
interval.
4) After cleaning lime should be applied in the inner surface.
5) Use safe and sufficient ladder for working.
6) Use helmet, safety shoes, rubber gloves and mask while working.
7) Always keep one man out side the over head / underground water
tank while working.
8) While sending any person inside tank ensure:
I. Ensure water tank is empty before starting the work.
II. There is no gas / fumes formation in the tank.
III. For adequate lighting use low voltage lamps (24 volts).
9) Provide adequate air while working inside.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/341/REV-0
Page : 1 of 1
QEHS WORK INSTRUCTIONS FOR USING LADDER AS PER
TITLE :
DESIGN

1.0 QUALITY

Not Applicable

2.0 ENVIRONMENT:

1) Release tank – cleaning water to P.M.C / Town planning drainage


pipe / chamber.
2) After cleaning tank, test the water for drinking.
3) Ensure there is no toxic smell from the tank.
4) Tie oxygen mask and pipe before entering.
5) Decide signaling mode before a person entering in case of
emergency.
6) Provide sufficient light inside tank.

3.0 HEALTH AND SAFETY :


1) Set frequency for cleaning tanks and display it water tank.
2) Sludge removed from the tank should be disposed off properly.
3) Under ground / over head tank should be cleaned at regular
interval.
4) After cleaning lime should be applied in the inner surface.
5) Use safe and sufficient ladder for working.
6) Use helmet, safety shoes, rubber gloves and mask while working.
7) Always keep one man out side the over head / underground water
tank while working.
8) While sending any person inside tank ensure:
I. Water level is safe for working.
II. There is no gas / fumes formation in the tank.
III. For lighting use low voltage lamps (24 volts).
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/342/REV-0
Page : 1 of 2

TITLE : QEHS WORK INSTRUCTIONS FOR HOUSEKEEPING

1.0 QUALITY

Not applicable

2.0 ENVIRONMENT :

1) Reduce use / waste of paper by using e – mail and other electronic


media.
2) Reduce waste of electricity by putting off A.C’s Fan’s, and lights
when not using or going away from the place. Install electric sensors
in rush areas to enable automatic on / off of electrical fixtures.
3) Do not use A.C. when you are comfortable with fan ( This will
prevent ozone depletion)
4) Ensure water taps in the washroom are closed after use.
5) Incase water leak is observed close it immediately.

3.0 HEALTH AND SAFETY:

1) Make workers aware of safety measurers.


2) Provide training on emergency preparedness and response.
3) Ensure the emergency doors kept free from obstacles.
4) Ensure fire – fighting system is in working condition.
5) Keep the workplace neat and tidy, dust free.
6) Passages are marked.
7) Areas are designated.
8) Unwanted material removed.
9) Keep gangways cleared.
10) Use area productively.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/342/REV-0
Page : 2 of 2

TITLE : QEHS WORK INSTRUCTIONS FOR HOUSEKEEPING

11) Ensure there is place for everything and everything in its place.
12) Files, records, drawings are indexed, ensure fast retrieval.
13) Ensure files / papers / documents kept at their place.
14) Ensure the lights and fans are switched off when not in use.
15) Ensure air conditioners switched off when not occupied.
16) Ensure visual control displayed (posters, sign, graphs, symbols etc.)
17) Ensure employees have undergone training on health, hygiene,
safety, environment, and housekeeping.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/343/REV-0
Page : 1 of 1
QEHS WORK INSTRUCTIONS FOR MONITORING AND
TITLE :
MEASURING OF NOISE, LIGHT & DUST

1. LIGHT:
a. If lighting on work place is below specified level, efforts shall be
made
to improve it and bring it to specified level.
b. Over illumination should be avoided.
c. All lights should be switched off at the end of the work.
d. Use maximum of low watt appliances / lighting source ( eg:- meta
halide lamps, CFL, Solar lamps eco friendly electrical products)

2. NOISE:
Measure noise after every 6 months for all machines and D.G.Sets, if noise
level is above 75 decibels at point of operations, efforts shall be made to
reduce it and the report is submitted to Management Representative.

3. DUST: (SPM)
It will be checked after every 6 months by outside party, record shall be
maintained, if dust levels are above specified level efforts shall be made to
bring it to specified limits. dust level shall be checked at site.

4. LIGHT NOISE AND DUST:


Light Noise and Dust levels shall be monitored and recorded. In case of
non – conformance, it shall be recorded and corrective / preventive action
shall be initiated.

5. RECORDS:
Air, SPM, Noise monitoring reports maintained by site in – charge.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/344/REV-0
Page : 1 of 1
QEHS WORK INSTRUCTIONS FOR CONTROL AND
TITLE :
MONITORING OF WASTE GENERATED IN
CONSTRUCTION

1.0 ENVIRONMENT:
1) Scrap such as steel, broken tiles, wooden cut ends and plastics shall
be collected everyday and kept in designated area for reuse /
disposal.
2) Sale / disposal of scrap to be done to recyclers through scrap
vendors.
3) Scrap shall be sorted out and kept in separate bins.

2.0 HEALTH AND SAFETY:


1) Removal of scrap Accumulated scrap at the sites shall be removed on
daily basis and shall be put in respective bin at scrap yard.
2) Ensure that scrap / waste material is disposed off without spilling
anywhere.
3) While transporting waste ensure that containers etc. are not
overloaded or over filled. Overloading / over filling will cause
accidents. Spillage (leading to material waste and soil
contamination).
4) Use hand gloves while handling scrap.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/345/REV-0
Page : 1 of 1

QEHS WORK INSTRUCTIONS FOR PILLING AND


TITLE :
CONSTRUCTION OF MANHOLE AND LAYING OF RCC
PIPES

1.0 ENVIRONMENT

1.1 Prevent wastage of water.


1.2 Do not allow sludge of mud to spread over the area.
1.3 Barricade the piling area to reduce noise and air pollution.

2.0 Health and Safety

2.1 Ensure piling work is carried out by the trained persons.


2.2 Ensure the piling machine operator is trained and has sufficient experience.
2.3 Ensure persons do not gather around the piling machine.
2.4 Use hand gloves during the removal of piles and pile caps.
2.5 Ensure pile bore is covered from all sides and no person is allowed in that area.
2.6 Ensure machinery used is checked as per respective checklist for safe operations.
2.7 Ensure person who enters the manhole has adequate communication facility with
him.
2.8 Ensure air is blown inside the manhole when any worker is working on site.
2.9 After work is over close the manhole by barricading so as to prevent a fall inside
manhole.
2.10 Ensure RCC pipes are lifted by the crane and put into the trench.
2.11 Do not allow persons to pull the pipe and put it in the trench.
2.12 Ensure before joining the pipe there are no individuals working inside.
2.13 Carry out back filling after the pipes are laid down and clear the ground surface.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/346/REV-0 Page : 1 of 2

QEHS WORK INSTRUCTIONS FOR USE OF CONSTRUCTION


TITLE :
EQUIPMENT AT SITE

1. Drivers, operators of plant and machinery are knowledgeable, experienced,


competent and are above 18 years. Only authorized drivers and operators are
allowed to operate plant and machinery.

2. Preventive maintenance schedules are strictly adhered to ensure that all plant and
machinery are systematically inspected, serviced, repaired and maintained as
necessary. Brakes are checked regularly.

3. Non-essential personnel are kept well away from the area of operation and trained
signal man are provided wherever necessary.

4. Site speed limit of 20 Km/hr. for all vehicles is strictly enforced.

5. Plant accessories & spares are kept at defined place.

6. Moving vehicles are fitted with proper rear view mirror and reversing alarms.
Vehicles are not moved in reverse without directions from cleaner.

7. Employees and workmen working in the vicinity of earth moving operations are
working with safety helmets, shoes, eye-glasses, if required.

8. Sleeping / resting under or rear side of vehicle like Tippers, Hyvas, Hydra,
Tractors, etc. are strictly prohibited. This is checked by watchman appointed at
various locations. No unauthorized person is allowed to enter in driver’s cabin.

9. Vehicles are not parked on a slope for push starting, if battery is weak. All vehicles
are having self-starter.

10. No workman other than operator is allowed to sit / ride on stationery or moving
tower crane, mobile crane etc. No. passengers are allowed in operator’s cabin.

11. Walky talky is provided, if required for better communication between crane
operator and lifting gang.

12. Inspection of wire-rope of cranes is carried out by Mech. I/c.

13. Operating any machine beyond its design limits can damage the machine & it can
cause very serious accidents. Any machine is not overloaded.

IMS Work Instruction Manual


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/346/REV-0 Page : 2 of 2

QEHS WORK INSTRUCTIONS FOR USE OF CONSTRUCTION


TITLE :
EQUIPMENT AT SITE

14. The engine of any machine has exposed rotating parts. Engine cover is not opened
while the engine is running. All other guards & protective devices are in place
while operating any machine.

15. While using excavator, because of long boom & dipper arm, one must be very
careful when slewing. Operator should not slew quickly and strike the dipper arm
against any obstacle.

16. Loose clothing is not used by operator as it can catch in moving parts of machine
and cause serious accidents.

17. While lifting the load by crane, nobody should work / stand in the crane coverage
area.

18. Ensure the use of air plug while working in noisy area to avoid deafness / irritation
to individuals.

IMS Work Instruction Manual


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/347/REV-0
Page : 1 of 2

TITLE : QEHS WORK INSTRUCTIONS FOR OPERATION OF TOWER CRANE

1.0 ENVIRONMENT:
1.1 Do not allow leakage/spillage of oil & Grease used.
1.2 Do not throw oil / grease rags in open area, use bins.
1.3 Lifting of material plan should be made to ensure effective usage of
electrical energy for operation; switch off when not in use.

2.0 HEALTH AND SAFETY:


2.1 Ensure incoming voltage at crane panel specified power supply, proper
earthing & lightening arrestor as specified in the crane manufacturer
manual.
2.2 Ensure wire rope, slings are in good condition and tested.
2.3 Check the function of Load limit switch, Trolley Limit switch, and Hoisting
Limit switch before operation.
2.4 Check split pins of tower mast, cathead and tension bar.
2.5 Ensure greasing is carried out for wire ropes and nipples, Drums, Bearings.
2.6 Ensure exposed moving parts, including gears, shafts, and sprockets are
properly guarded.
2.7 Load chart of the tower crane must be available with crane operator.
2.8 Load capacity to be placed on the boom at specified distance.
2.9 Ensure hoisting hook and safety latch in good condition.
2.10 Ensure signal man available during operation and communication device /
method is defined.
2.11 Anemometer is provided on crane to know the wind speed to enable
operator stop the operations in case of strong wind
2.12 Make sure sufficient lighting arrangement in case of night operation.
2.13 Check the tightness of mast mounting bolts.
2.14 Ensure crane operator is medically fit and daily checklist is used by
operator.
2.15 Install fall arrester and make sure operators are using safety belt while
climbing to cabin (Ascending /Descending).
2.16 Use of PPE Safety belt, Helmet, fall arrestor, life line available and used.
2.17 Load chart and other warnings are displayed for easy reference to the
operator and others in vicinity.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/347/REV-0
Page : 2 of 2

TITLE : QEHS WORK INSTRUCTIONS FOR OPERATION OF TOWER CRANE

2.18 Ensure first aid box, is available in operator cabin.


2.19 Ensure there is portable fire extinguisher (1 or 2 kg) in operator cabin.
2.20 Report any unusual noise or sound during operation.
2.21 Ensure Third party inspection carried out in every 12 months by competent
person.
2.22 Ensure wire rope and slings inspected on every six months
2.23 Ensure the signalman provided with reflective jackets.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/348/REV-0
Page : 1 of 1

TITLE : QEHS WORK INSTRUCTIONS FOR LOADING, UNLOADING AND


HANDLING OF MATERIAL

1) Suitable footwear, safety helmets and necessary PPEs are used by personnel during
loading, unloading and handling of material.
2) Vehicles are not overloaded by any materials.
3) Proper approaches for vehicle movements are ensured around the site. Approach
roads are fairly leveled and compacted to avoid skidding of vehicles.
4) Proper capacity wire rope is used while handling the material with cranes.

5) Valid test certificates of wire rope sling, chain pulley block, wire ropes, pulley, etc.
are maintained.
6) Hand gloves are worn by workers while handling / shifting steel.
7) Suitable equipment is used to lift the steelwork.

8) Good housekeeping standards are maintained in steel yard in order to prevent


slips, trips and falls.
9) Experienced and trained persons are engaged with adequate supervision for
loading, unloading and handling of materials.
10) proper tools are used by steel fixers in order to assist in bar bending type activities.
11) Exposed vertical bars, if observed are bent, covered or protected by some other
means.
12) Construction materials are not stacked on the floors more than the allowable loads
and are stacked in safe manner.
13) Material is stored in designated areas.
14) Handling of shuttering material, scaffolding, concrete bucket, precast components,
blocks, Siporex slabs by crane is controlled by experienced operators and where
necessary, with the help of signalman. While lifting the load by crane, it is ensured
that nobody is present in crane coverage area.
15) Safety shoes, dust mask and hand gloves are used by workers while loading,
unloading and shifting of cement bags.
16) Use of hand gloves is ensured while handling wire-rope slings.
17) It is ensured by supervisors and operators that all overload relays & limit switches
of material handling equipment like tower crane, mobile crane are in perfect
working condition.
18) Walky talky is provided, if required for better communication between crane
operator and lifting gang.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/349/REV-0
Page : 1 of 1

QEHS WORK INSTRUCTIONS FOR FABRICATION,


TITLE :
ALUMINUM AND GLASS WORK.

1.0 ENVIRONMENT:

1.1 Do not allow aluminum powder to spread in the air,


1.2 Ensure aluminum cut pieces are deposited in scrap yard for recycle and reuse.
1.3 In case of acetylene gas leakage or backfire, sprinkle continuous water.
1.4 Prepare bar bending / cutting schedule in advance.
1.5 Cut the bars / sections to correct length and reduce wastage of steel/
Aluminum.
1.6 Control and minimize wastage of material.

2.0 HEALTH AND SAFETY:


2.1 Unwanted people should not enter near any welding spot.
2.2 Use of welding / cutting goggles and welding shield is must for welder, and
helper.
2.3 Use flash back arrestor while using gas cutting torch.
2.4 Always keep a fire extinguisher (ABC type Dry powder / CO2 type) near
welding & gas cutting spot)
2.5 Do not roll the gas cylinders.
2.6 For glasswork, use gloves.
2.7 Always use hand gloves, while working at height ensure use of safety shoes,
helmet and safety belt.
2.8 Use special clamps for holding of glass sheet (Vacuum lifter)
2.9 Use proper cutting tools, Edges of cut glasses should be polished / grounded.
2.10 Use proper glass cutting and drilling tools.
2.11 Use hand gloves, goggles, ear plugs while cutting.
2.12 Obtain hot work permit.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/350/REV-0
Page : 1 of 1

QEHS WORK INSTRUCTIONS FOR WORKING AT NIGHT UPTO


TITLE :
10:00 p.m.

1.0 Environment

1.1 Ensure there is no dust or smoke generation during the night work.
1.2 Prevent noise generated caused by machines and hammering by
barricading the area.

2.0 Health and Safety

2.1 Ensure adequate lighting is provided to avoid poor visibility.


2.2 Ensure all electrical wiring is free from joints and protected from damage
by machines and hammering.
2.3 Ensure safety hooks are used while shuttering work is done at height.
2.4 Ensure person with visionary problems do not work during the night.
2.5 Ensure adequate lighting in the staircases as well as walkways.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

REF : QEHS/351/REV-0
Page : 1 of 1

TITLE : QEHS WORK INSTRUCTIONS FOR OFFICE WORK

1.0 ENVIRONNMENT

1.1 Use of Paper


 Use email to prevent/reduce paper consumption.
 Use both sides of paper for printing.
 Use internet and intranet for internal and external communication
 Do not take multiple copies unless essential.

1.2 Use of Electricity


 Switch off the lights, fans and ACs when you are not at work place.
 Use natural light as far as possible.
 Introduce use of CFL lamps.
 Use ACs when it is a must.
 Ensure AC machines are CFC free.

2.0 Health and safety

2.1 Provide sufficient fire extinguishers at office.


2.2 Establish emergency preparedness plan.
2.3 Provide awareness training to office staff on fire fighting and first aid.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/352/REV-0
Page : 1 of 5

TITLE : QEHS WORK INSTRUCTIONS FOR CLC PLANT

A. QUALITY

1. SCOPE:-
Applicable for production of Cellular Light Weight Concrete Blocks

2. EQUIPMENTS
1) Mixer Plant of 1.3 C.M. Capacity/batch.
2) Trolley to carry the mix & trolley for carriage of blocks.
3) The foam generator
4) Hopper and Belt/ Screw conveyer for Pond Ash & Cement respectively
5) Curing Bay
6) Production Bay to have moulds for CLC Bricks
7) Under Ground Water Tank capacity - 10,000 Ltrs.
8) Cement Go-down capacity - 1200 bags.

3. RESPONSIBILITY
Plant Incharge

4. WORK INSTRUCTIONS
I) INPUTS :-
Following are considered as inputs to this procedure.
1) C L C Blocks requirement received from site
2) Raw material received from supplier
3) Mix design as given below
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/352/REV-0
Page : 2 of 5

TITLE : QEHS WORK INSTRUCTIONS FOR CLC PLANT

1) PROCESS / OPERATION :-
PLANNING :-

1) Daily production plan for CLC Blocks is prepared & displayed on


display board.
2) Before starting check availability of all raw materials.
3) Ensure that the Mix design for CLC is kept at the Panel for uploading

COLLECTION OF RAW MATERIALS

1) The Cement of Grade 53 is to be used.


2) Pond Ash is to be used
3) Calcium Chloride is used as a hardener.
4) The foaming agent is required

ACTIVITIES / OPERATION
1) As per Design Mix the data is loaded on the Design Pannel by the Plant
Operator.

2) Each time the Mixer is filled up its of 1.3 cum of Mix, which takes
around half an hour to make.

3) The flow chart for the production of Cellular Light Weight Block

Water 220 ltr is mixed with


Calcium Chloride (5 Kg.)

Pond Ash 500 Kgs in 3 Parts are taken


and mixed with the above mix & mixer
is run forward & reverse 30seconds
each to ensure proper mix
(slurry formation)

Cement is taken in 3 parts a total of


( 250Kgs)
The mixing process is same as above.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/352/REV-0
Page : 3 of 5

TITLE : QEHS WORK INSTRUCTIONS FOR CLC PLANT

Foam is poured in the slurry for 140


seconds, to increase volume resulting
in required density.

At this stage the density of mix is


checked. It should be in the range of
840 Kg./m3 to 860 Kg./m3 or 0.840
Kg./ ltr to 0.860Kg/ltr. If density is
not achieved, foam is again poured
for 10 seconds, & the above process
repeated.

The mixed material is then unloaded


in the mixture carrying trolley,
which is then taken to the moulds in
the production bay

Before this the moulds are kept


ready by oiling and checked for the
dimension / right angles.
The vertical bases are covered by
Pond ash on the exterior of the
moulds.

RECONCILLATION:-
1) The consumption of material will be as per the mix design given below:
a) Cement 53 grade - 250 bags
b) Pond Ash - 500 Kgs
c) Calcium Chloride - 5 Kgs
d) Foam - 140 seconds pour
e) Water - 220 ltrs.
2) The density of the mix should be 840 Kg/m3 to 860 Kgs/m3
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/352/REV-0
Page : 4 of 5

TITLE : QEHS WORK INSTRUCTIONS FOR CLC PLANT

3) The details of production will be recorded and the said record will be
maintained for every day production as per the format attached.
4) The empty bags of Cement are counted & checked with the consumption
report.

MATERIAL STACKING:-
1) Cement:-
Cement is unloaded at cement godown at site/ CLC Plant / Silo / Store.
2) Foaming Agent
Foaming agent is kept in a drum connected to the foam generator.
3) Pond ash:-
To be stacked in the covered stacking yard.

4) Calibration of CLC Plant to be done after 2000cum/ three months


whichever is earlier
B) ENVIRONMENT:-
1) Cut Cement bag by removing stitches & change directly in batching /
mixing plant to prevent waste of cement.

2) Do not throw/drop cement bags to prevent air pollution by dust


generation.

3) P.U.C. Checked of all vehicle enter in premises.

4) Do not use water pipe having any leakage / damage & prevent west of
water.

5) Water drain should not leak.

6) Store empty cement bags separately for appropriate disposal of reuse.

7) Use sign board for awareness for environment.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/352/REV-0
Page : 5 of 5

TITLE : QEHS WORK INSTRUCTIONS FOR CLC PLANT

C) HEALTH & SAFTY:-


1) Use Helmet, safety shoes, Rubber Hand Gloves & safety Belt at height.

2) Always use good quality ladder.

3) Proper sanitation provided.

4) Use industrial plug for temporary electric connection.

5) Use sign Board for awareness for safety. .

6) Mask is provided for labour & Operator.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/353/REV-0
Page : 1 of 3

TITLE : QEHS WORK INSTRUCTIONS FOR FALSE CEILING

QEHS WORK INSTRUCTIONS FOR FALSE CELLING

A) QUALITY

1.0) SCOPE

Applicable for False ceiling in Residential/Commercial buildings.

2.0) EQUIPMENTS

a) Measuring Tape
b) Level Tube
c) Ghodi for Standing
d) Hammer, Drill Machine
e) Line Dori
f) Colour Blue/Red
g) Screw Drivers star & flat both
h) Cutting Tools

3.0) RESPONSIBILITY

a) Site Incharge
b) Building Incharge
c) Q.A. Representative

4.0) WORK INSTRUCTIONS


i) Ensure approved good for construction drawing is available with the latest
revision.
ii) The following material is available
a) POP sheets 3’X 2’ as required quantity
b) Suspender (L) of 29 guage and size of 20 X 20mm length as per site.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/353/REV-0
Page : 2 of 3

TITLE : QEHS WORK INSTRUCTIONS FOR FALSE CEILING

c) Screws 50 X 8 half threaded nettle screw for fixing suspender in the


ceiling.
d) ‘W’ shaped of 29 guage of 55mm Top & 30mm bottom.
e) Screw to five purling with rafter is star screw 20 X 11- one no.
f) Each POP sheet to be fixed to purling patti at a location with nettle fold
screw full thread 25 X 8 mm.
iii) Take levels on all walls at 5’ ht. By level tube.
iv) Work out the level, as per drg from the ceiling, then mark the line dori on
wall/beams at the place, where the false finish level is expected; where patti
level is expected and where bottom level is expected.
v) Make a grid of 1.5’ X 2’ and mark on the ceiling by line dori with Red/Blue
colour.
vi) Drill holes at 2” from the junction of the grid marked on the ceiling to a depth
of 50mm.
vii) Put Rawal Plug and fix the Suspender by half thread nettle fold screw of size
50 X 8.
viii) Fix the bottom in line and level as per the reference datum marked on the wall
for fixing bottom with line dori.
ix) Fix the patti in line and level, as per the reference datum marked on the wall
for fixing the patti in line dori.
x) After completing the framing work, once again check the framing for stability,
line, level and get the NOC from QAD Engineer before fixing the POP
sheeting.
xi) Ensure all electrical conducting, wiring, light points fixing, fan hooks
suspender or any air-conditioning ducts, if any, have been completed as per
GFC drg.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/353/REV-0
Page : 3 of 3

TITLE : QEHS WORK INSTRUCTIONS FOR FALSE CEILING

xii) Fix POP/Gypsum sheet by drilling holes at nine locations per sheet with nettle
fold full threaded screw 25 X 8’
xiii) Do not finishing of sheet joints and screw location point to make it look
uniform finish.
xiv) Record details in M & M in process activities register (QAD/702) duly signed
by QA/SI

ENVIRONMENT

i) Cut the POP bags by removing stitches, do not spill the POP
ii) Stack the POP sheets in such a way that they don’t get damaged, and all
the sheets can be u sed.
iii) The screw, MS Sheets/Suspender wastage is removed from the site and
stacked as scrap/ taken away by the contractor.
iv) Do not allow the POP sheets getting mixed up with water. Only the POP
powder is mixed after the fixing of sheets and the POP paste is used with
care to finish the joint, if any.

Health & Safety

I) Use Safety Helmet, rubber hand gloves, Safety Belt if working at heights
II) Ensure that the POP sheets and the grid of boxing is made in advance and
fixed in situ.
III) Used good quality Ghodi for working which has a balanced base.
IV) Keep area clean of nails & screw and metal pieces.
V) Use goggles and ear plugs while drilling.
VI) Insulate all electrical wire joints with insulation tape and use two pin/three
top pin for electrical sockets.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/354/REV-0
Page : 1 of 4
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
RAMP IN STILT PARKING

A) QUALITY

1.0 SCOPE:-

Applicable for all Residential & Commercial Buildings.

2.0 EQUIPMENT:-

Earth Compactor, Vibrator electrical or Petrol, Vibrator needle 60 no.


,Electrical panel board, Cable 2.5 sq.mm 3 core ,Ghamela, Phawada,
Tikav, Thapi, Ghotai patra, Wire Brush, Wheel Barrow, Gum Boot,
Rubber hand gloves, Safety Helmet, Tool & Plants, and machinery.

3.0 RESPONSIBILITY:-

1) HOD D&D
2) Site In charge.
3) QAD Engineer.
4) Development In charge.

4.0 WORK INSTRUCTIONS:-

1) Study the Drawing of Plinth Beam.

2) The Plinth level of Building is known, line out the Road Marking
levels with respect to plinth levels.

3) For smooth entry of vehicle in parking, ramp at entry should have


gradient of 1:6 consider ramp length of minimum 900mm. Mark the
Tremix road finish level, & the top of plinth beam. The top of plinth
beam should maximum 3.5” above Tremix road level. (Chequered tile
thk. + Mortar bedding = 2.5”) and minimum level top of plinth beam
equal to finish Tremix road level.

4) Keep the slope of road 1:100 transversely toward the gutter and
longitudinally adjust the slope as per plinth FFL so that everywhere
Tremix road is maximum 3.5” below top of plinth beam level and
minimum levels of finish Tremix road & top of plinth beam should
equal.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/354/REV-0
Page : 2 of 4
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
RAMP IN STILT PARKING

5) If topography of land is such that steep slope is required to be given


to the road , then change the top level of Plinth Beam, accordingly to
the road level before casting of Plinth Beam, and make the level
difference in parking.

6) During changing the level of Plinth beam, check the unsupported


height of Column which should not be exceed beyond the limit for
particular width of Column.

7) Accordingly cast the plinth beam of building, preparation of sub


grade by compacting the portion by earth compactor. 9” thick soling,
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/354/REV-0
Page : 3 of 4
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
RAMP IN STILT PARKING

filling gaps with kapchi, murum spreading above soling, watering


and compact by earth compactor.

8) 3” P.C.C. done over compacted surface for parking, Keep plinth beam
top and P.C.C top level same.

9) For Tremix road follow the standard procedure as per work


instruction QEHS/328.

10) Provide 3” PCC for Ramp, keep P.C.C top 2.5” below Tremix road
top level at roadside and same as plinth beam top at parking side.

11) For the Podium at the starting of the Building. Level of Top of
Podium slab should below the stilt floor slab by maximum 6” for
ramp of 1:6 gradient(Consider 3”trimix over podium slab) and give
the slope to stilt slab same as slope of podium slab. Accordingly cast
the Podium slab & Stilt slab of building. Also check the unsupported
height of column which should be within the specified limit.

12) Provide 3” P.C.C for ramp keeping top 2.5” below Tremix top level at
road side and same as stilt slab top level at building parking side.

13) Fix the granite or kadappa patti 7” width at the entry of parking.

14) Level marking on Entry column and wall keeping slope of 1:10
towards granite patti from other end. Fix the chequered tile in mortar
bed of proportion 1:10. (Take 50% Crush sand and 50% River sand
chal )

15) Fix 8” X 8” rough granite (Flamed finish) in a skew manner with


10mm spacer in a mortar bed of 1:10 proportion .Take ( 50% Crush
sand and 50% River sand ) from patti towards Tremix road, so that
maximum slope to ramp not exceed than 1:6.

16) Fill the 10mm joint between two granite pieces by cement, finish the
joint 2mm below the granite top surface & curing done for 3 days.
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS
REF : QEHS/354/REV-0
Page : 4 of 4
QEHS WORK INSTRUCTIONS FOR CONSTRUCTION OF
TITLE :
RAMP IN STILT PARKING

B) ENVIRONMENT:-

1) During excavation for sub grade preparation before soling of road


and parking sprinkle the water to reduce dust and prevent air
pollution.

2) G.I sheet and barricading to reduce noise level of machineries.

3) Collect all broken tiles or bags and use them where cut piece is
required.

C) HELATH AND SAFETY:-

1) Use safety Helmet, Ear plug, Shoes, Rubber Hand Gloves, Mask,
Goggles and Safety Belt.

2) Before excavation check underground lines of water and electricity.

3) Ensure that proper stacking of natural stones is done.

4) First Aid Box with medicine should be available at site.

5) Ensure that cutting of tiles and natural stones to be done at confined


space.

6) Avoid loose electrical contacts and loose joints.


NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

Ref. No. QEHS / WI/ 103 / Rev – 0

Sec No. TABLE OF CONTENT REV No. No of Pages


6.0 0 Page 1 of 2

Sr. Ref. No WORK INSTRUCTIONS FOR EHS Rev. Date No. of


No No pages
1 QEHS / 301 Environment and safety work instruction for line out. 0 30-04-17 3
2 QEHS / 302 Environment and safety work instruction for Excavation 0 30-04-17 2
3 QEHS / 303 Environment and safety work instruction for Labour 0 30-04-17 3
Camp
4 QEHS / 304 Environment and safety work instruction for Antitermite 0 30-04-17 3
5 QEHS / 305 Environment and safety work instruction for PCC 0 30-04-17 3
6 QEHS / 306 Environment and safety work instruction for RMC Plant 0 30-04-17 5
7 QEHS / 307 Environment and safety work instruction for Cement 0 30-04-17 3
Mortar Cover Block for Reinforcement
8 QEHS / 308 Environment and safety work instruction for RCC 0 30-04-17 5
Footing and Raft
9 QEHS / 309 Environment and safety work instruction for 0 30-04-17 4
RCC Column
10 QEHS / 310 Environment and safety work instruction for RCC 0 30-04-17 7
Staircase
11 QEHS / 311 Environment and safety work instruction for RCC Pardi 0 30-04-17 5
12 QEHS / 312 Environment and safety work instruction for RCC Slab 0 30-04-17 6
for Residential
13 QEHS / 313 Environment and safety work instruction for RCC Slab 0 30-04-17 7
for Commercial
14 QEHS / 314 Environment and safety work instruction for Brick Work 0 30-04-17 4
15 QEHS / 315 Environment and safety work instruction for Gypsum 0 30-04-17 4
Finish Plaster
16 QEHS / 316 a) Environment and safety work instruction for Internal 0 30-04-17 3
Plaster
b) Environment and safety work instruction for External 4
Sand face Plaster
17 QEHS / 317 Environment and safety work instruction for Plumbing 0 30-04-17 4
Work

18 QEHS / 318 Environment and safety work instruction for 0 30-04-17 5


Waterproofing
19 QEHS / 319 Environment and safety work instruction for Tiling 0 30-04-17 9
20 QEHS / 320 Environment and safety work instruction for 0 30-04-17 4
Electrical Works
21 QEHS / 321 Environment and safety work instruction for Aluminium 0 30-04-17 4
Window
22 QEHS / 322 Environment and safety work instruction for Internal and 0 30-04-17 9
External Painting & Melamine Polish
23 QEHS / 323 Environment and safety work instruction for Compound 0 30-04-17 2
Wall
24 QEHS / 324 Environment and safety work instruction for RCC 0 30-04-17 2
Retaining Wall.
25 QEHS / 325 Environment and safety work instruction for Main Gate 0 30-04-17 2
and Security Cabin
26 QEHS / 326 Environment and safety work instruction for Club House 0 30-04-17 2
27 QEHS / 327 Environment and safety work instruction for Swimming 0 30-04-17 3
Pool
28 QEHS / 328 Environment and safety work instruction for Trimix 0 30-04-17 3
Concrete Road
NYATI BUILDERS PVT. LTD. &
NYATI ENGINEERS & CONSULTANTS

Ref. No. QEHS / WI/ 103 / Rev – 0

Sec No. TABLE OF CONTENT REV No. No of Pages


6.0 0 Page 2 of 2

Sr. Ref. No WORK INSTRUCTIONS FOR EHS Rev. Date No. of


No No pages
29 QEHS / 329 Environment and safety work instruction for DG Set. 0 30-04-17 2

30 QEHS / 330 Environment and safety work instruction for LT Room 0 30-04-17 3
31 QEHS / 331 Environment and safety work instruction for Sewage 0 30-04-17 2
Treatment Plant
32 QEHS / 332 Environment and safety work instruction for Water 0 30-04-17 2
Treatment Plant
33 QEHS / 333 Environment and safety work instruction for Under 0 30-04-17 2
Ground Water Tank
34 QEHS / 334 Environment and safety work instruction for Landscape 0 30-04-17 2
Garden
35 QEHS / 335 Environment and safety work instruction for 0 30-04-17 2
Vermiculture (Bio-sanitizer)
36 QEHS / 336 Environment and safety work instruction for Rainwater 0 30-04-17 2
Harvesting
37 QEHS / 337 Environment and safety work instruction for Gas Bank 0 30-04-17 2
38 QEHS / 338 Environment and safety work instruction for Pumping 0 30-04-17 1
for Concreting
39 QEHS / 339 Environment and safety work instruction for Scaffolding 0 30-04-17 1
40 QEHS / 340 Environment and safety work instruction for Cleaning of 0 30-04-17 1
Underground and Overhead Water Tank
41 QEHS / 341 Environment and safety work instruction for Using 0 30-04-17 1
Ladder as per Design
42 QEHS / 342 Environment and safety work instruction for 0 30-04-17 2
Housekeeping
43 QEHS / 343 Environment and safety work instruction for Monitoring 0 30-04-17 1
and Measuring of Noise, Light and Dust
44 QEHS / 344 Environment and safety work instruction for Monitoring 0 30-04-17 1
of Waste Generated in Construction
45 QEHS / 345 Environment and safety work instruction for Piling and 0 30-04-17 1
Construction of Manhole and RCC Pipes
46 QEHS / 346 Environment and safety work instruction for use of 0 30-04-17 2
Construction Equipment at Site
47 QEHS / 347 Environment and Safety work instruction for Operation 0 30-04-17 2
of Tower Crane
48 QEHS / 348 Environment and Safety work instruction for Loading, 0 30-04-17 1
Unloading and Handling of Material
49 QEHS / 349 Environment and Safety work instruction for 0 30-04-17 1
Fabrication, Aluminium and Glass Work
50 QEHS / 350 Environment and Safety work instruction for Working at 0 30-04-17 1
Night up to 10:00 p.m.
51 QEHS / 351 Environment and Safety work instruction for Office 0 30-04-17 1
Work
52 QEHS / 352 Environment and Safety work instruction for CLC Plant 0 30-04-17 1
53 QEHS / 353 0 30-04-17 3
False Ceiling Work Instructions
54 QEHS/354 Ramp in Stilt Parking 0 30-04-17 4

Das könnte Ihnen auch gefallen