Civil Construction Works for GC-29 at North Kuwait

Project Personnel Approval Status


Date :28-Sept-2015
HEISCO Letter PIL Letter Ref.
Sl. No. Name Designation Discipline Approval Status Remarks
No. No.

1 Maulik Yogeshkumar Soni Site QA/QC Manager QC L-0008 Approved L-0008 Approved as Site QA/QC for Civil Works

2 Ronald C. Bernado QC Engineer QC L-0009 L-0009 was not available for Scheduled Interview

3 Inam Ullah Shah QC Inspector QC L-0009 Not Approved L-0009

4 Hany Louis Zaky QC Engineer QC L-0009 Not Approved L-0009/L-0113 Approval withdrawn

5 Nikhil Raj Technical Clerk QC L-0009 Approved L-0009

6 Sathyaraj Prakasam QC Engineer (Civil) QC L-0033 / L-0041 Approved L-0037 Approved as Civil QC Inspector

7 Mohamad Arshad QC Inspector QC L-0041 Approved L-0037 Civil QC Inspector

8 Rayapati Sumanth QC Inspector - Civil QC L-0142 Approved L-0158