Beruflich Dokumente
Kultur Dokumente
Build Sum/1
ITEM DESCRIPTION PAGE NO.
Build Sum/2
Building Works
AMOUNT (RM)
Build Sum/3
Building Works
AMOUNT (RM)
Build Sum/4
ELEMENT NO.1 Building Works
E Pad footing m² 2
G Apron slab m² 26
H Pad footing m³ 2
To Collection :
To Collection :
( Cont'd )
J Ground beam m³ 12
L Apron slab m³ 26
In ground beams
10mm Diameter; links, stirrup, binders and the
C like Kg. 26
In pad footings
D
12mm Diameter, straight and bend Kg. 2
E
16mm Diameter, straight and bend Kg. 686
In ground beams
To Summary :
( Cont'd )
Page WBLFF/1
Page WBLFF/2
Page WBLFF/3
To Summary :
Building Works
AMOUNT
(RM)
BIL NO.2 Building Works
FRAME
A In column m³ 35
C In roof beam m³ 11
In column
16mm diameter high tensile straigt and bent bars in first kg. 511
F floor beam
In roof beam
H 16mm diameter high tensile straigt and bent bars in roof 242
beam kg.
To Summary :
FRAME/13
Building Works
AMOUNT
(RM)
FRAME/14
BIL NO.3 Building Works
UPPER FLOOR
D DPM m² 4
U.FLOOR/15
BIL NO.3 Building Works
To Summary :
U.FLOOR/16
Building Works
AMOUNT
(RM)
U.FLOOR/17
Building Works
AMOUNT
(RM)
U.FLOOR/18
BIL NO.4 Building Works
STAIRCASE
A In staircase m³ 2
C In landing beam m³ 1
In staircase
In landing slab
In landing beam
In landing beam
STAIR/19
BIL NO.4 Building Works
To Collection :
STAIRCASE (Cont'd)
D To landing slab m² 4
Prepare and apply one coat 'jotun plus' sealer and two
finishing coats of approved emulsion paint of approved
colour as described internelly:
STAIR/20
BIL NO.4 Building Works
To Collection :
STAIRCASE (Cont'd)
To Collection :
Collection :
Page STAIR / 1
Page STAIR / 2
STAIR/21
BIL NO.4 Building Works
To Summary :
STAIR/22
Building Works
AMOUNT
(RM)
STAIR/23
Building Works
AMOUNT
(RM)
STAIR/24
Building Works
AMOUNT
(RM)
STAIR/25
Building Works
AMOUNT
(RM)
STAIR/26
BIL NO.5 Building Works
ROOF
ROOF FINISHES
Roof Covering &
Insulation Foil
on 50 mm x 50
A mm s.p.t. Gr B tbr.
Battens. m² 342
Hip tiles
pointed in cement
B and sand (1:3 )
mortar m 180
Ridge tiles
pointed in cement
C and sand ( 1:3 )
mortar m 7
End capping
pointed in cement
D and sand (1:3 )
mortar no 15
Apex
pointed in cement
E and sand ( 1:3 )
mortar no 11
Valley gutter
with top edge
F dressed over
battens . m 76
To Collection :
ROOF (Cont'd)
ROOF STRUCTU
Wall plate
A Sawn pressure
treated timber
grade 'A' pitched m 62
roof member as
Rafter
described of
B 150mm x 50mm
rafter. m 595
Hip rafter
described of
C 100mm x 50mm
hip rafter. m 180
Ridge board
described of
D 150mm x 50mm
ridge board m 7
Purlin
roof member as
E described of
150mm x 50mm
tie beam m 62
F Tie beam
described of
150mm x 50mm
tie beam m 283
G Valley rafter
m
H Strut
described of
150mm x 50mm
strut.
m 629
To collection :
Collection
Page ROOF / 1
Page ROOF / 2
To Summary :
BIL NO.6 Building Works
INTERNAL WALL
BRICKLAYER
Notes : -
(1) The rates for brickwall shall include all mild steel
bonding ties with one end hooked and cast into
concrete and other end build into brickwall as per
S.O.'s requirement or noted in the drawings
(4) The rates for half brick thick brick/block wall shall
include a layer of 'Exmet' at every fourth course
\ \
To Summary :
E.WALL/1
BIL NO.6 Building Works
E.WALL/1
BIL NO.7 Building Works
BRICKLAYER
Notes : -
Clay brick
CEMENT AND SAND ( 1 : 6 ) MORTAR LAID IN
STRETCHER BAND WITH AND INCLUDING
BRICK REINFORCEMENT AT EVERY FORTH
COUSE OF THE WALL
I.WALL/32
BIL NO.7 Building Works
To Summary :
I.WALL/33
BIL NO.8 Building Works
WINDOWS
B GLASS m2 52
6mm thick clear float glass to BS 952 to metal with
clips and extruded rubber gasket in panes area 0.10-
0.50 m2
TO COLLECTION :
WINDOWS/34
BIL NO.9 Building Works
DOORS
H IRONMONGERY No 77
IRONMONGERY FOR BUTT HINGES, BARREL
LOCKSET
TO COLLECTION
DOORS/35
BIL NO.9 Building Works
DOORS/36
BIL NO.9 Building Works
B PAINTING TO FRAME m 36
knotting, stopping one coat primer, two
undercoats, one coat gloss finish to timber
door frame 150 - 300mm girth internally &
externally
C PAINTING TO DOOR m 2
To Collection :
DOORS/37
BIL NO.10 Building Works
A To floor m² 192
B To drop 50mm m 12
To drop 100mm m 8
To drop 150mm m 10
m² 42
200mm x 200mm 'MML' homogeneous tiles equivalent
and approved in colour, pattern and design, bedded and
jointed with cement mortar (1:3) and pointed with white or
tinted cement as described on cement and sand screed
(measured separately) as described :-
m² 16
300mm x 300mm 'MML' homogeneous tiles equivalent
and approved in colour, pattern and design, bedded and
jointed with cement mortar (1:3) and pointed with white or
tinted cement as described on cement and sand screed
(measured separately) as described :-
m² 122
400mm x 400mm 'MML' homogeneous tiles equivalent
and approved in colour, pattern and design, bedded and
jointed with cement mortar (1:3) and pointed with white or
tinted cement as described on cement and sand screed
(measured separately) as described :-
INT FLOOR/38
BIL NO.10 Building Works
To Summary :
INT FLOOR/39
Building Works
AMOUNT
(RM)
INT FLOOR/40
Building Works
AMOUNT
(RM)
INT FLOOR/41
BIL NO.11 Building Works
B To wall m² 57
C To wall m² 57
Prepare and apply one coat 'Jotun Easy Clean' sealer and
two finishing coats of approved emulsion paint of
approved colour as described internally
INT WALL/42
BIL NO.11 Building Works
To Summary :
INT WALL/43
Building Works
AMOUNT
(RM)
INT WALL/44
Building Works
AMOUNT
(RM)
INT WALL/45
BIL NO.12 Building Works
______________________________________
E
1,219mm x 1,219mm x 4.5mm Thick asbestos ceiling
board, set out in accordance to reflected ceiling as per
manufacturer's instruction and Architect's approval m² 126
INT CEILING/46
BIL NO.12 Building Works
To Summary :
INT CEILING/47
Building Works
AMOUNT
(RM)
INT CEILING/48
Building Works
AMOUNT
(RM)
INT CEILING/49
BIL NO.14 Building Works
SANITARY FITTINGS
Squatting
Basin
plate botle trap complete with stainless steel outlet, plug
C and chain and 1 pair of fixing bolt (ws10x 140)
including plugging and screwing bracot to tiled wall and
connecting trap to drain pipe. No. 2
D Floor trap
including all necessary raising piece with
100mmx100mm stainless steel cover and frame and
setting trap in concrete floor and connecting trap to drain
pipe. No. 2
Sink
ABS handle, 38mm waste outlet, plug and chain, 38mm
E plastic botle trap, fixing clam and foam in reinforced
concrete counter top(measure seporately) in cement and
sand(1:3) motar including connecting trap to drain pipe. No. 1
Gully trap
grating including surrounding trap with concrete c1 3:6-
F 38mm aggregate) and all necessary axcavation and
formwork. No. 2
S.FITTINGS/50
BIL NO.14 Building Works
To Collection :
H Tap
No. 2
S.FITTINGS/51
BIL NO.14 Building Works
Collection :
Page S.FITTINGS / 1
Page S.FITTINGS / 2
To Summary :
S.FITTINGS/52
Building Works
AMOUNT
(RM)
S.FITTINGS/53
Building Works
AMOUNT
(RM)
S.FITTINGS/54
Building Works
AMOUNT
(RM)
S.FITTINGS/55
BIL NO.13 Building Works
EXTERNAL FINISHES
A To apron m² 29
B To floor m² 79
C To floor m² 79
EXT FINISHES/56
BIL NO.13 Building Works
To Collection :
Prepare and apply one coat 'Jotun Plus' sealer and two
finishing coats of approved emulsion paint of approved
colour as described internally :-
To Collection :
Collection :
EXT FINISHES/57
BIL NO.13 Building Works
To Summary :
EXT FINISHES/58
Building Works
AMOUNT
(RM)
EXT FINISHES/59
Building Works
AMOUNT
(RM)
EXT FINISHES/60
Building Works
AMOUNT
(RM)
EXT FINISHES/61
BIL NO.15 Building Works
A
32mm diameter hdpe pipe laid in trench m 2
B
32mm abs pipe laid in wall m 8
C
32mm hdpe pipe laid in ceilling space m 2
Water tank
M
Approved holy water tank 5800 lengthx5800 width
x3300 hight and capasity 2500 gallon complete with
cover vent pipe, mosquito wire mesh, level indiater and
collecting to PDR pipe including hosting tank
approrutmately 6.47m above ground level. No 1
Testing
N Item
On completion of the installation af cold and hot water,
sources, test all pipe fitting, etc for water fighness make
good all defect and leave everything in perfect working
order to the entire satisfaction of engineer and local
authorifies.
C.WATER/62
Item
To Summary :
C.WATER/63
Building Works
AMOUNT
(RM)
C.WATER/64
C.WATER/65
BIL NO.14 Building Works
Excavating trenches
A
Evcavate and set out,part return,fill in and
rammed,removed,excavated materials,deposited,spread
and leveled where directed removed surplus excavated
material exceeding 55 mm diameter form the site. m 27
Laid in trenches:-
B 51 mm Diameter m 15
C 50 mm Diameter m 5
D 100 mm Diameter m 8
Laid in ceiling:-
E 51 mm Diameter m 3
F 50 mm Diameter m 4
G 50 mm Diameter m 3
H 51 mm Diameter m 15
Fitting:-
S.PIPE/66
To Collection :
Fitting:- (Cont'd)
Reduce Tee
D Ballon grating No 3
E Floor trap No 5
Testing
On comletion of the whole of the soil waste pipe and
F vent pipe,test all appliances,pipes and fitting in the of the
s.o. Item
To Collection :
S.PIPE/67
Collection :
Page S.PIPE / 1
Page S.PIPE / 2
To Summary :
S.PIPE/68
Building Works
AMOUNT
(RM)
S.PIPE/69
Building Works
AMOUNT
(RM)
S.PIPE/70
S.PIPE/71
BIL NO.17 Building Works
Distribution Board
Fuses
D 13 amp fuses No 54
H Ceiling lighting No 70
ELECTRICAL/72
To Collection :
Earthing System
Testing
B
Allow for testing the whole of the electrical installation
as described to the satisfaction of the S.O and
appropriate TNB and for making good any defect and
leaving the whole in perfect working order on
completion to the entire satisfaction of the S.O. Item
To Collection :
Collection :
Page ELECTRICAL / 1
ELECTRICAL/73
Page ELECTRICAL / 2
To Summary :
ELECTRICAL/74
Building Works
AMOUNT
(RM)
ELECTRICAL/75
Building Works
AMOUNT
(RM)
ELECTRICAL/76
ELECTRICAL/77
BIL NO. 18 Building Works
SITE CLEARANCE
A
Clear the whole of the site to the extent as shown in
drawing and as described, of all trees and vegetation
unless otherwise measured separately herein under
all structures or other obstructions which interfere
with the execution of the works and remove all debris
from site to a tip provided by the Contractor m² 346
SEWERAGE
Note :-
______________________________________
C
Excavate trench for 150mm diameter VCP pipe
(measured separately) exceeding 2.50m but not
exceeding 1.00m, from platform level average 0.60m
deep; get out, part return, fill in, well rammed m 37
D
Allow for keeping the surface of the site and the
whole excavations free from all surface water by
mean of pumping or otherwise Item
E
150mm nominal diameter pipe, laid on concrete
support (measure separately) in trench (measure
separately) m 37
EXT WORKS/78
BIL NO. 18 Building Works
To Collection :
SEWERAGE (Cont'd)
Manhole
Excavation
EXT WORKS/79
BIL NO. 18 Building Works
To Collection :
SEWERAGE (Cont'd)
Brickwall
Plastering
Steps Iron
Manhole Cover
EXT WORKS/80
BIL NO. 18 Building Works
Testing
Item
To Collection :
Saptic tank
LANDSCAPE
Turfing
EXT WORKS/81
BIL NO. 18 Building Works
ITEM Trim, level and grade to flat and slope area, deposit,
DESCRIPTION UNIT QTY. RATE
spread and level excavated material where directed (RM)
within Site
m² 122
Trees
______________________________________
To Collection :
SUNDRIES
Rubbish Bin
EXT WORKS/82
BIL NO. 18 Building Works
No. 1
m 69
Collection :
EXT WORKS/83
BIL NO. 18 Building Works
To Summary :
EXT WORKS/84
Building Works
AMOUNT
(RM)
EXT WORKS/85
Building Works
AMOUNT
(RM)
EXT WORKS/86
Building Works
AMOUNT
(RM)
EXT WORKS/87
Building Works
AMOUNT
(RM)
EXT WORKS/88
Building Works
AMOUNT
(RM)
EXT WORKS/89
Building Works
AMOUNT
(RM)
EXT WORKS/90
Building Works
AMOUNT
(RM)
EXT WORKS/91