Beruflich Dokumente
Kultur Dokumente
Stock/
Unit Item Description Quantity Unit Cost
Property No.
TOTAL:
Purpose:
For the Construction of Supply Warehouse.
QSU-PROC-F001
Rev. 00 (Feb. 11, 2019)
Signature :
Printed Name :
RICHARD P. PABLO SAMUEL O. BENIGNO, Ph.D.
Designation : OIC-Director-Physical Plant and Site President
Development
QSU-PROC-F001
Rev. 00 (Feb. 11, 2019)
_______________
e: ____________
Total Cost
57,200.00
9,600.00
12,000.00
37,440.00
48,600.00
2,000.00
15,120.00
27,200.00
3,400.00
1,200.00
5,000.00
195.00
48,450.00
8,640.00
8,100.00
6,300.00
1,920.00
330.00
4,800.00
370.00
1,950.00
1,250.00
625.00
750.00
35,000.00
13,200.00
330.00
210.00
330.00
1,000.00
2,600.00
5,000.00
8,000.00
368,110.00
d by:
QSU-PROC-F001
Rev. 00 (Feb. 11, 2019)
O. BENIGNO, Ph.D.
sident
QSU-PROC-F001
Rev. 00 (Feb. 11, 2019)