Sie sind auf Seite 1von 37

PT.

ANDROMEDA REKAYASA FLUIDA

Integrated Drilling Services , Mud Services , Cementing Services


Filtration Services , Oil & Gas Chemical
AboutUs Company History
PT. Andromeda Fluid Engineering was established on
February 7, 2014 as a limited company. PT. Andromeda Fluid
Engineering is engaged in the field of Specialty Chemical.

 Deed of Establishment No. 04, February 7, 2014 by a


Notary. Lilawati, S.H in Bekasi.

 Deed of Amendment No. 07, September 6, 2018 by a


Notary. Benedict Remard, S.H., M.Kn in South Bekasi.
VISION
• To be a superior, trusted and growing company that is able to compete
in a global market that prioritizes professionalism and trust as the
basis for work to build mutually beneficial partnerships.

MISSION
• Being a company that is able to provide appropriate technology
solutions, with reliable, trained and competitive resources that provide
the best service for clients for the progress of the company.
• Creating consumer satisfaction with quality service products through
excellence in innovation, management systems and human resources.
• Strive for efficiency of time and cost.
ORGANIZATIONSTRUCTURE
PRESIDENT
DIRECTOR

OPERATION
DIRECTOR

GENERAL
MANAGER

FINANCE &
BUSINESS & GA OPERATION
PRCHASING
MANAGER MANAGER
MANAGER

LABORATORIUM OPERATION IPM MUD CEMENTING WAREHOUSE


FINANCE & TAX GA STAFF PIPE SERVICES
HEAD SUPPORT COORDINATOR COORDINATOR COORDINATOR COORDINATOR
ISO14001:2015
ISO9001:2015
OHSAS18001:2007
SKUPMIGAS
SKT GEOTHERMAL
CERTIFICATE OF ASSOCIATION
OUR EXPERIENCES :
CLIENTS :

1. PT. COSL INDONESIA FOR PT. MEDCO INDONESIA BLOCK A


PROJECT, PT. CNOOC OFFSHORE PROJECT,
PT. PETROCHINA EAST JAVA PROJECT
2. PT. HUILE INDONESIA FOR PT. PERTAMINA EP ASSET 1 & 5
PROJECT & PT. EKSINDO TELAGA SAID PROJECT
3. PT. SOLSTICE INDONESIA, FOR PT. PERTAMINA EP ASSET 3
PROJECT
4. PT, PRIMA HIDROKARBON INDONESIA, FOR PT. CHEVRON
INDONESIA PROJECT & PT. PERTAMINA GEOTHERMAL
ENERGI PROJECT
5. PT, WIKA INTINUSA NIAGATAMA, FOR PT. HALLIBURTON
PROJECT
OUR EXPERIENCES :
6. INTEGRATED PROJECT MANAGEMENT
PT. SCHINTAR MARQUISA
7. MUD SERVICES, FOR EMP BENTU PROJECT
8. INTEGRATED PROJECT MANAGEMENT PT. RENCO
ELANG ENERGY
9. WELDING SERVICES, FOR GFPP RIAU PROJECT
10. DRILLING FLUIDS FOR SIAM INDUSTRIAL
MINERAL Co.,Ltd
OUR SERVICES
 INTEGRATED PROJECT MANAGEMENT
(MPPT)
 MUD SERVICES
 CEMENTING SERVICES
 FILTRATION SERVICES
 OIL AND GAS CHEMICAL
Onshore Rig Mast/Carrier :SJ Petro Machinery Co Jingzhou – Huabei China
3500.000 Lbs Static Hook Load Capacity at 8 Lines; back in type carrier
mounted. 115 ft adequate clearance to allow a mouse-hole connection.
Comply with API Spec 4 F

Draw Works : SJ-PETRO CO. Mfg:Series, -S/N:120905

Drawworks. Double drum 650 HP c/w pneumatic crown-o-matic

Drilling Line : 3000 ft Drilling line 1-1/8" (6 x 19) EIPS IWRC. comply with
API Spec 9A

Rotary Table : SJ PETRO Mfg Rotary Table, Model ZP-275 with


27.5”opening, c/ w master split /casing bowl bushing for 7”, 9-5/8" and
13-3/8" ,20”Tubulars. The Rotary Table have Positive lock to prevent
clockwise rotation

Draw Works Prime Mover : Engine Caterpillar - 650 HP, Model Cat C 18
in-line and suitable ALLISON USA Transmission. c/w remote operated
auto kill and shut off engine. A water spray spark arrestor must be
present and functional at any time. Any electrical components should
be explosion proof type.

Cathead : Hydraulic Cat-works. Capable to 60,000 ft lb torque.

Substructure : Substructure rated static :309.790 Lbs, Pipe Set Back :


150.000 lbs Max Combined with space Accommodate for class III BOP
Stack ,length 16 ft; max width of base 12ft

Loading Ram/Mud Boat : Matched for rig carrier and substructure

Block Hook : Block Model: YG 150-4 sheave with 150T capacity dead
strength. lenght 6 ft Complete with Elevator Link 111” and 85”

Swivel : Drilling Swivel Model: SL160 with 176 Ton capacity - 5,000 psi
WP and matched to Block and Kelly. Dimension: 64-7/8" L x
26"W.Integrated with Kelly spinner
Mast/Carrier :SJ Petro Machinery Co Jingzhou – Huabei China 330.469
Lbs Static Hook Load Capacity at 8 Lines; back in type carrier mounted.
115 ft adequate clearance to allow a mouse-hole connection. Comply
with API Spec 4 F

Draw Works : SJ-PETRO CO. Mfg:Series, -S/N:120905

Drawworks. Double drum 550 HP c/w pneumatic crown-o-matic

Drilling Line : 3000 ft Drilling line 1-1/8" (6 x 19) EIPS IWRC. comply with
API Spec 9A

Rotary Table : SJ PETRO Mfg Rotary Table, Model ZP-275 with


27.5”opening, c/ w master split /casing bowl bushing for 7”, 9-5/8" and
13-3/8" ,20”Tubulars. The Rotary Table have Positive lock to prevent
clockwise rotation

Draw Works Prime Mover : Engine Caterpillar - 650 HP, Model Cat C 18
in-line and suitable ALLISON USA Transmission. c/w remote operated
auto kill and shut off engine. A water spray spark arrestor must be
present and functional at any time. Any electrical components should
be explosion proof type.

Cathead : Hydraulic Cat-works. Capable to 60,000 ft lb torque.

Substructure : Substructure rated static :252.910 Lbs, Pipe Set Back :


150.000 lbsMax Combined with space Accommodate for class III BOP
Stack ,length 16 ft; max width of base 12ft

Loading Ram/Mud Boat : Matched for rig carrier and substructure

Block Hook : Block Model: YG 150-4 sheave with 150T capacity dead
strength. lenght 6 ft Complete with Elevator Link 111” and 85”

Swivel : Drilling Swivel Model: SL160 with 176 Ton capacity - 5,000 psi
WP and matched to Block and Kelly. Dimension: 64-7/8" L x
26"W.Integrated with Kelly spinner
1. API MUD BALANCE
The Fann Four Scale Mud Balance is
an accurate,self-contained measuring
device used to determine the density
of drilling fluid. It has a range of 7 to 24
pounds per gallon or Specific Gravity
of 0.84 to2.88.

MUD SERVICES
2. SPEED VISCOMETER
The FANN® Model 35 viscometer are
direct reading instruments which are
available in six speed and 12 speed
designs for use on either 50 Hz or 60
Hz electricalpower.
CEMENTING
SERVICES

One (1) Twin Pumps Cementing Unit, Skid/ Trailler with 2 ea HT


400, RCM mixing system with a backup high pressure mixing
system, one compartment 8 bbls tub with one hydraulically

driven paddle agitators, total capacity 20 bbls measuring


displacement tank divided into two equal 10 bbls
compartment. 4-1/2” plunger with 11,200 psi working
pressure. Have ability to mix cement slurries continuously at
rates up to 12 bpm and density 20.0 ppg.
BATCH MIXER

AIR COMPRESSOR
PNEUMATIC CEMENT SILO

WATER TANK/MIXING TANK


WATER TANK/MIXING
TANK
FILTRATION SERVICES
OIL & GAS CHEMICALS PRODUCTS

 DRILLING FLUID CHEMICAL


 CEMENTING CHEMICAL
 COMPLETION FLUIDCHEMICAL
 PRODUCTION CHEMICAL
WATER BASE MUD PRODUCT
PRODUCTION CHEMICAL PRODUCT
PERSONNEL EXPERTS
INTEGRATED PROJECT MANAGEMENT (IPM)

MANAGEMENT PROYEK PEMBORAN TERPADU


(MPPT)
Integrated Project Management Daftar Service Company
01 Definisi, Maksud dan Tujuan
04 Services Company Pendukung
IPM

Ruang Lingkup Kerja IPM


02 Perencanaan, Pengintegrasian,
Eksekusi

Organisasi IPM
03 Proses, Struktur, Alur Koordinasi
DEFINISI, MAKSUD, & TUJUAN

Definisi
Integrated Project Management (IPM) atau Management Proyek Pengeboran Terpadu
(MPPT) adalah gabungan dari beberapa unit kegiatan untuk menyediakan jasa layanan
Drilling / Pemboran minyak & Gas dimana semuanya terintegrasi dalam satu atap (one
stop solution) dibawah satu management.

Maksud & Tujuan


Untuk melaksanakan suatu project pengeboran, pihak KKKS (PSC) & KSO harus
mempersiapkan beberapa proses tender (Drilling Rig, Mud Services, Cementing, Wireline
Logging, Mud Logging, dll). Hal ini tentu akan sangat memakan waktu yang lama, tenaga
dan biaya. Dengan melakukan lelang IPM/IDS untuk suatu project pengeboran, maka akan
sangat menghemat waktu, tenaga, biaya, dll karena semua services yang akan mendukung
dalam proyek pengeboran akan terintegrasi dalam satu proses Tender
INTEGRATED PROJECT MANAGEMENT
MULTI DICIPLINARY TEAM OF SPECIALIST

COORDINATING OF ALL MEMBER OF THE PROJECT

FORECAST AND CONTROL COST OF THE PROJECT

PROSPECTIVE AND OPERATIONAL PLANNING

FLEXIBLE AND RAPID RESPONSE TO CHANGE IN THE OPERATION

PROTECTION OF REPUTATION AND FINANCIAL INTEREST OF COSTUMER


Transparency
Manageability
Predictability
Adjustability during the project execution

QUALITATIVE RESULT IN THE PLANNED PERIOD OF TIME WITH OPTIMUM COST


INTEGRATED PROJECT MANAGEMENT

Menyediakan
Manajerial dan
peralatan Memberikan Mengkoordinasikan
pelaksanaan
drilling rig dan suatu proyek Kerjasama team
operasioanl yang
peralatan yang internal dan
terorganisasi
pendukung berkualitas eksternal lebih
dalam satu
lainnya dan tepat efektif dan optimal
komando
(services comp)
Ruang Lingkup Kerja IPM
02 Perencanaan, Pengintegrasian, Eksekusi
RUANG LINGKUP KERJA IPM
Tahap Persiapan
 Identifikasi dan Evaluasi
Contractor/Service
Tahap Pengeboran
Company potensial untuk  Pembuatan rencana Tahap Akhir
masing-masing services pelaksanan project dan
 Evaluasi Penawaran Teknis monitoring atas  Management of well testing
dan Commercial sesuai implementasi  After Action Review
dengan permintaan klien  Risk assessment dari  Development of measures
untuk semua jenis services semua phase pengeboran to reduce drilling risks for
 Pembuatan perjanjian kerja  Mengkoordinasikan seluruh subsequent wells in this
berisi komitmen service company. field based on the analysis of
pelaksanaan services,  Cost control pada seluruh work performed (Lessons
pembagian tugas dan kegiatan secara daily basis Learn)
tanggung jawab, dan  Pembuatan keputusan  Cost effectiveness analysis
pemahaman bersama atas lansung berkaitan dengan  Final well report
resiko project dan deviasi pada eksekusi  Pembuatan laporan proses
mitigasinya. rencana project pelaksanaan project
 Pelaksanaan inspeksi  Optimalisasi kerja  Daily reports
terhadap kesiapan  Selalu menjaga interest  Administrative reports dan
peralatan, HSE, logistic dan klien dari sisi financial dokumen lain yang diminta
personil. maupun dari sisi reputasi oleh klien
 Pembuatan detail  Membuat semua pencatatan
perencanaan mobilisasi (dokumentasi) terhadap
personil, material dan seluruh aktivitas
equipment pengeboran
Organisasi IPM
03 Proses, Struktur, Alur Koordinasi
ORGANIZATION CHART IPM
CLIENT

IPM
PROJECT
LEADER

SR.
HSE PROJECT CIVIL
DRILLING
SUPERVISOR SUPPORT ENGINEER
ENGINEER

WELLSITE WELLSITE WELLSITE


COMPANY CIVIL FIELD
SUPERVISOR SUPERVISOR GEOLOGIST
MAN SUPERVISOR
(DAY) (NIGHT)

LOGISTIC HSE TUBULAR CONTRUCTION


COORDINATOR COORDINATOR DRILLING RIG VSAT & TEL
RUNNING SERVICES
LOGISTIC MEDICAL CEMENTING MAN POWER FISHING
ASSISTANT PERSONEL SERVICE
CLERK DRILING TUBULAR SURFACE
CONDUCTOR
/DISPATCHER FLUID INSPECTION TESTING
INSTALLATION
WIRELINE DIRECTIONAL SLICKLINE
SECURITY LOGGING DRILLING
GENERAL FRACTURING
CORING & CTU
SERVICE
JAKARTA OFFICE
WELLHEAD & LINER
OCTG
XMASTREE HANGER
PUMPING WATER 24 HOURS SUPPORT
FILTRATION
UNIT TREATMENT

DRILLING BIT WELL SITE


ORGANIZATION CHART IPM

WELL SITE
COORDINATOR/
SUPERVISOR COMPANY MAN
SERVICE COMPANY
(DAY/NIGHT)

MULAI

LAPORAN VERIFIKASI VERIFIKASI

TIDAK TIDAK
PERBAIKAN SETUJU SETUJU

PERSETUJUAN PERSETUJUAN
FUNGSI, PROSES, STRUKTUR DAN ALUR KORDINASI

IPM Project Leader


 Commercial
Responsibility
 Process Management
 Managing Interfaces Sr. Drilling Engineer
 Technical Integrity
Architect :
 Conceptional Well Design
 Detail Well Design
 Well Program Wellsite Supervisor
Service Provider :
 Implements Well Program.
 Responsible for planning,
 coordinating, supervising,
 evaluating all rig-site activities
Daftar Service Company
04 Services Company Pendukung IPM

DAFTAR SERVICES COMPANY PENDUKUNG IPM


NO SERVICES SERVICE COMPANY
1 SITE PREPARATION & CONDUCTOR INSTALLATION 14 EWLPP

2 DRILLING RIG 15 SURFACE TESTING

3 CEMENTING 16 TUBULAR RUNNING AND HANDLING TOOLS

4 WELLHEAD & XMAS TREE 17 DRILL BIT

5 OCTG 18 SLICKLINE

6 DRILLING FLUID 19 FISHING SERVICES

FILTRATION
7 20 CORING

8 SURFACE & SUB SURFACE EQUIPMENT (PUMPING UNIT) 21 LINER HANGER

9 GENERAL SERVICES, HEAVY EQUIPMENT & LOGISTIC 22 FRACTURING, COIL TUBING UNIT & NITROGEN UNIT

10 TUBULAR INSPECTION 23 VSAT

11 WASTE WATER MANAGEMENT

12 MUD LOGGING

13 DIRECTIONAL DRILLING, GYRO & MWD


HEAD OFFICE :
M – GOLDTOWER
19TH FLOOR, SUITE E
JL. KH. NOER ALI, PEKAYON JAYA

BEKASI SELATAN, JAWA BARAT 17148

PHONE : 021 – 28O87110 ; 021 -28087112

WAREHOUSE :
PERGUDANGAN GREEN SEDAYU BIZPARK
BLOK GS 5/ NO.78

JL.CAKUNG CILINCINGTIMUR RAYA KM.2


JAKARTATIMUR
TERIMA KASIH

Hormat Kami,
Management PT. Andromeda Rekayasa Fluida