Sequence of operation
System Layout
The chilled water system consists of 2 nos. of Carrier air-cooled Chillers with a parallel
arrangement.
The chilled water pumping system consists of 3 nos. primary chilled water constant speed
pumps & 2 nos. variable speed secondary pumps.
Wiring Layout
The 2 nos. of Air-cooled chillers will be connected to DDC for communication with the
Chiller Plant Manager.
1. Upon a signal to start, Carrier chiller will send a signal to “OPEN” the corresponding
chilled water butterfly valve of the lead chiller. The drive time of the actuator shall
be approx. 120 secs
2. Upon the receipt of “OPEN” status from the butterfly valve in the lead chiller chilled
water line, DDC controller will send a command signal to “Start” the respective
primary pump. (immediately)
3. Chilled water primary pump gives the feedback to the controller confirming the run
status of the pump. (Feedback waiting time 30 secs)
4. When water flow through the cooler of the lead chiller is established and the other
safety circuits of the chiller are closed, the microprocessor controller of the chiller
shall signal the compressor to run.
6. When the chiller is loaded to the optimum level and upon a call for further cooling,
the next chiller shall run following the sequence as stated above.
Shut down Sequence of Chiller when operating through chiller plant manager.
1. Upon a reduction in load chiller shall be cut off, one at a time in the reverse
sequence.
2. Chiller will start unloading and stops, this process take approximately 5 mins
3. Once the selected chiller stops, the respective chilled water pumps shall stop.
(within 2 mins)
4. The motorized valves at the cooler outlet of the chiller shall close after (approx. 3
mins).
Page 1 of 5
ADD AND SUBTRACT CONTROL SEQUENCE
Rotation based on weekly. The chillers rotate to equalize service runtime, once per week
at a configured time and day.
When the cooling active is ON, the program starts the lead chiller based on the current
start sequence. When the chiller in sequence is enabled by the system, it will allow the
lead chiller to “Pull Down” the chilled water loop temperature for a configured pull down
time. Pull down time (15 mins) allows the lead chiller to cool the building’s water loop and
prevents the starting of unnecessary additional machines. After the pull down time
elapses, the Additional Cooling Required (ACR) Algorithm determines when lag chillers
should be started.
Refer to the underneath table to determine the configured values of the service table’s
decisions.
2. Condition 2 is true because the above conditions remain true while the system is
decrementing the lag start timer.
Page 2 of 5
After ‘Time to Start Chiller’ expires, the system starts chiller 2 (the next chiller available to
start). If it reads back a ‘Running’ status before the ‘Start Fault’ has elapsed, the system
will not try to start another chiller.
When the load decreases, the system determines when to stop a chiller based on the
Reduced Cooling Required (RCR) Algorithm.
Evaluation of condition 1:
Condition 1 is true because the Average Chiller Load of all running chillers
(=45%) < RCR setpoint (=50%).
Evaluation of condition 2:
Condition 2 is true because the {Current CHW Temperature (46oF)} < {Control setpoint
(45oF) + Set point Delta T (=2^F)}.
Evaluation of Condition 3:
‘RCR conditions True’ will display ‘Yes’, then RCR will decrement pre configured timer to
Stop Chiller and keep checking to verify that Conditions 1 and 2 are still true. After the
configured Lag Stop Delay Time (15mins )has elapsed, the next chiller will be stopped.
The Butterfly valve will be interlocked with the chiller. When the chiller is enabled by the
system, the chiller will send signal to the Butterfly Valve actuator to open. The actuator
will drive the butterfly valve to open and normally it takes 60 to 120 seconds. The open
feedback will be send from the valve limit switches to the DDC controller and then the
pumps will get enable command to start.
Page 3 of 5
When the chiller is disabled by the CPM, The Chilled Water pump will be stopped and the
chiller will “Close” the respective butterfly Valve.
This controller is monitoring the HAND / OFF / AUTO switch (Auto position), the status
and the trip for all primary Pumps(3Nos.)
The number of enabled Chilled water Pumps is equal to the number of enabled chillers.
Pumps Rotation:
A Pumps rotation will be performed on a regular schedule (Time Based (Weekly, monthly -
selectable by user) or if
A Pumps failed to confirm “ON”
A Pumps tripped
If one of the running Pumps fails during operation, the next available Pumps will start (Fail
Recovery).
Page 4 of 5
Secondary Pump Control (1Working+1Standby)
This controller is monitoring the HAND / OFF / AUTO switch (Auto position), the status
(4-20mA VFD feedback) and the trip for all secondary pumps. (3 No’s) 1 no. of differential
sensor is connected across the load to control the speed of the secondary pumps.
The pumps will modulate their speed from 30% to 100% so as to maintain the system
differential pressure close to the setpoint. The speed of the pumps are controlled by the
measured differential pressure to active differential pressure setpoint (adjustable by
operator)
Periodic Rotation
If one of the running Pumps fails during operation, the next available Pumps will start (Fail
Recovery).