DESIGN AND CONSTRUCTION OF ROADS BRIDGES, CULVERTS, DOCUMENT NO.

DATE
SIDEWALKS, PHE & ASSOCIATED CIVIL
PROJECT:
WORKS ON TENDER SURE CONCEPTS FOR ABD AREA UNDER
NAGPUR SMART CITY PROJECT

PROJECT: HYDRAULIC DESIGN OF MJBR-07 MC-18C AT CH. 0+835 SHEET

CONTENT

Sr. No. Item Description Page No.

1) Catchment Area
i) Toposheet Image 1

2) L - Section 2 to 3

3) Cross Section 4 to 5

4) Hydraulic Calculation
i) Data 6

ii) Discharge calculation by Ingli's Formula 6

iii) Discharge calculation by Dicken's Formula 6

iv) Discharge calculation by Rational Method 6

v) Design Discharge 6

vi) Calculated HFL at Defined Section at Bridge Site 7

vii) Manning Discharge 7 to 9

viii) Calculation for linear waterway at HFL 10

ix) Afflux Calculation 11

5) Summary 12

6) Drawing 13 to 14
1) L - SECTION LEVELS
Calculation for Hydraulic Gradient S

Chainage Levels Sr. U/S Bed Level D/S Bed Level Difference in
(m) (m) no. Chain age (m) Chain age (m) Bed Level
300 277.340 1 300 277.340 0 277.500 -0.160
270 277.220 2 270 277.220 -30 277.490 -0.270
240 277.270 3 240 277.270 -60 277.280 -0.010
210 277.320 4 210 277.320 -90 277.290 0.030
180 277.380 5 180 277.380 -120 277.270 0.110
150 277.450 6 150 277.450 -150 277.260 0.190
120 277.490 7 120 277.490 -180 277.190 0.300
90 277.520 U/S levels 8 90 277.520 -210 276.940 0.580
60 277.550 9 60 277.550 -240 276.900 0.650
30 277.530 10 30 277.530 -270 276.780 0.750
0.0 277.500 Location of Box culvert 11 0 277.500 -300 276.710 0.790
-30 277.490 Total = 2.960
-60 277.280
-90 277.290 D/S levels Average Difference = Total = 0.269
-120 277.270 No. of Chain age
-150 277.260 Hydraulic Gradient = 1115
-180 277.190
-210 276.940 Bed Slope = 1 in 1115
-240 276.900
-270 276.780
-300 276.710
D/S L- SECTION FOR NALLAH U/S

280.000

279.000

278.000
LEVELS

277.000

276.000

275.000

274.000

273.000 At 0 m Chainage - Bridge Location.


-300 -270 -240 -210 -180 -150 -120 -90 -60 -30 0 30 60 90 120 150 180 210 240 270 300
CHAINAGE
2) Cross section
ion at
at90m
150 m
D/S
D/S
side
SIDE
Road Top Level = 281.700 m
Top of Box = 281.548 m
Bed Level at 90 m D/S = 277.280 m
HFL at proposed bridge = 282.300 m
HFL at 90 m D/S = 282.219 m

Bed Level HFL Road Top Level


Chainage
(m) (m) (m)
-34 279.700 282.219 281.700
-32 279.800 282.219 281.700
-30 279.800 282.219 281.700
-28 279.900 282.219 281.700
-26 279.800 282.219 281.700
-24 279.900 282.219 281.700
-22 279.900 282.219 281.700
-20 279.500 282.219 281.700
-18 279.500 282.219 281.700
-16 279.400 282.219 281.700
-14 278.800 282.219 281.700
-12 278.100 282.219 281.700
-10 277.400 282.219 281.700
-8 277.000 282.219 281.700
-6 277.100 282.219 281.700
-4 277.200 282.219 281.700
-2 277.200 282.219 281.700
0 277.280 282.219 281.700
2 277.300 282.219 281.700
4 277.300 282.219 281.700
6 277.300 282.219 281.700
8 277.300 282.219 281.700
10 277.300 282.219 281.700
12 277.300 282.219 281.700
14 277.300 282.219 281.700
16 278.500 282.219 281.700
18 279.700 282.219 281.700
20 280.600 282.219 281.700
22 280.400 282.219 281.700
24 280.300 282.219 281.700
26 280.600 282.219 281.700
28 280.600 282.219 281.700
30 280.600 282.219 281.700
32 280.700 282.219 281.700
34 280.700 282.219 281.700

PAGE NO.7
CROSS SECTION OF NALLAH AT 90 m D/S
286.00

284.00

282.00
LEVELS

280.00 Formation
level
HFL
278.00
PROFILE
276.00

274.00

272.00
-34 -30 -26 -22 -18 -14 -10 -6 -2 2 6 10 14 18 22 26 30 34

CHAINAGE

PAGE NO.8
3) Hydraulic Calculations

Catchment Area = 25.90 Km2


No. of Span = 5 no.
Span Length = 9.32 m
Location of Defined Section = 90 D/S
LBL at Proposed section = 277.500 m
LBL at 90D/S = 277.280 m

3.1) Discharge calculation by Ingli's Formula (As per Clause. 4.4 IRC:SP:13-2004)
Q = 125 x M
(M+ 10)

= 125x25.901
(25.901+10)

Q = 540.35 m3/sec

3.2) Discharge calculation by Dicken's Formula (As per Clause. 4.2 IRC:SP:13-2004)
3/4
Q = CM
C = 14.0
Q = 14x(25.901)^3/4
= 160.74 m3/sec

3.3) Discharge calculation by Rational Method (As per Clause. 4.7.9 IRC:SP:13-2004)
Q = 0.028 P f A lc
Where,
Q = Discharge in Cum/sec
P = % Co-efficient of runoff for the catchment characteristics
= 0.8
A = Area of Catchment in Ha.
= 2590.1 Ha.
f = Fraction
= 0.910
Ic = Critical intensity of rainfall in cm per hr.
= 1.593 cm/hr
Q = 0.028 x 0.8 x 2590.1 x 0.91 x 1.593
= 84.105 m3/sec

So Final designed discharge = 540.35 m3/sec

The HFL as per local inquiry and Discharge is calculated By Manning's Formula
Calculation for Hydraulic Gradient
Slope = 1 in 1115
Hydraulic Gradient 1 in 1115

Calculated HFL at Defined = 282.219 m


Compartment I
Depth of Wetted Diff. In GL. Wetted
Chainage GL. Mean depth Length
water Area perimeter
1 2 3 4 5 6 7 8
-34 279.700 2.519
-32 279.800 2.419 2.469 2.00 4.939 0.100 2.002
-30 279.800 2.419 2.419 2.00 4.839 0.000 2.000
-28 279.900 2.319 2.369 2.00 4.739 0.100 2.002
-26 279.800 2.419 2.369 2.00 4.739 0.100 2.002
-24 279.900 2.319 2.369 2.00 4.739 0.100 2.002
-22 279.900 2.319 2.319 2.00 4.639 0.000 2.000
-20 279.500 2.719 2.519 2.00 5.039 0.400 2.040
-18 279.500 2.719 2.719 2.00 5.439 0.000 2.000
-16 279.400 2.819 2.769 2.00 5.539 0.100 2.002
-14 278.800 3.419 3.119 2.00 6.239 0.600 2.088
118.020 A1 = 50.89 P1 = 20.14

Compartment I
H.F.L 282.220 m

Compartment I II III

Rugosity coefficients (n) 0.035

Wetted area (m2) (A) 50.885 50.89

Wetted perimeter (m) (P) 20.140 20.14

Hydraulic Mean Depth ( R) 2.527

Bed Slope (S) 0.0009

Velocity = R 2/3 x S 1/2 1.587 1.59


n
Discharge (m3/sec) (Q) 80.77 80.77

Manning's Discharge at HFL 282.22 m = 80.77 m3/sec

Compartment II
Depth of Wetted Diff. In GL. Wetted
Chainage GL. water Mean depth Length
Area perimeter
1 2 3 4 5 6 7 8
-12 278.100 4.119 3.769 2.00 7.539 0.700 2.119
-10 277.400 4.819 4.469 2.00 8.939 0.700 2.119
-8 277.000 5.219 5.019 2.00 10.039 0.400 2.040
-6 277.100 5.119 5.169 2.00 10.339 0.100 2.002
-4 277.200 5.019 5.069 2.00 10.139 0.100 2.002
-2 277.200 5.019 5.019 2.00 10.039 0.000 2.000
0 277.280 4.939 4.979 2.00 9.959 0.080 2.002
2 277.300 4.919 4.929 2.00 9.859 0.020 2.000
4 277.300 4.919 4.919 2.00 9.839 0.000 2.000
6 277.300 4.919 4.919 2.00 9.839 0.000 2.000
8 277.300 4.919 4.919 2.00 9.839 0.000 2.000
10 277.300 4.919 4.919 2.00 9.839 0.000 2.000
12 277.300 4.919 4.919 2.00 9.839 0.000 2.000
14 277.300 4.919 4.919 2.00 9.839 0.000 2.000
16 278.500 3.719 4.319 2.00 8.639 1.200 2.332
75.409 A1 = 144.52 P1 = 30.62

Compartment II
H.F.L 282.220 m

Rugosity coefficients (n) 0.030

Wetted area (m2) (A) 144.518 144.52

Wetted perimeter (m) (P) 30.617 30.62

Hydraulic Mean Depth ( R) 4.720

Bed Slope (S) 0.0009

Velocity = R 2/3 x S 1/2 2.809 2.81


n
Discharge (m3/sec) (Q) 405.98 405.98

Manning's Discharge at HFL 282.22 m = 405.98 m3/sec

Compartment III
Depth of Wetted Diff. In GL. Wetted
Chainage GL. water Mean depth Length
Area perimeter
1 2 3 4 5 6 7 8
18 279.700 2.519 3.119 2.00 6.239 1.200 2.332
20 280.600 1.619 2.069 2.00 4.139 0.900 2.193
22 280.400 1.819 1.719 2.00 3.439 0.200 2.010
24 280.300 1.919 1.869 2.00 3.739 0.100 2.002
26 280.600 1.619 1.769 2.00 3.539 0.300 2.022
28 280.600 1.619 1.619 2.00 3.239 0.000 2.000
30 280.600 1.619 1.619 2.00 3.239 0.000 2.000
32 280.700 1.519 1.569 2.00 3.139 0.100 2.002
34 280.700 1.519 1.519 2.00 3.039 0.000 2.000
316.024 A1 = 33.75 P1 = 18.56

Compartment III
H.F.L 282.220 m
Rugosity coefficients (n) 0.035

Wetted area (m2) (A) 33.747 33.75

Wetted perimeter (m) (P) 18.563 18.56

Hydraulic Mean Depth ( R) 1.818

Bed Slope (S) 0.0009

Velocity = R 2/3 x S 1/2 1.275 1.27


n
Discharge (m3/sec) (Q) 43.01 43.01

Manning's Discharge at HFL 282.22 m = 43.01 m3/sec

Total Manning's Discharge Calculated as Above = 529.76 m3/sec

% increase over inglis discharge 1.96 %

3.4) Calculation for linear waterway at HFL @ 90D/S


Tallied HFL = 282.220 m
LBL = 277.500 m
Max. flood depth D = 4.720 m
Wetted area at HFL A = 229.15 m2
Linear waterway (L) A/D = 48.55 m Hence Ok
It is Proposed to Provide = 5 spans of 9.32 m
Linear waterway is proposed = 49.00 m
Width of inner wall = 0.60 m
Width of end wall = 0.70 m
No. of Wall = 6 Nos.
Linear waterway at site = 46.60 m

3.5) Calculation for Determination of Formation level at Defind D/S Side section
At Defined
Sr.No. Particulars At Prop. section
D/S
1) HFL 282.219 m 282.300 m
2) Afflux maximum - 0.182 m
3) Clearance - 1.200 m
4) Soffit Level - 283.682 m < 280.848 m NOT OK
5) Top Slab Thickness - 0.700 m
6) Wearing Coat - 0.065 m
7) Top of Box - 284.447 m < 281.548 m NOT OK
8) Formation Level at defined c/s - 281.700 m

Clearance = 1.200 m As per IRC: 5 -2015 Clause.


106.8.2 (page no.24)

3.6) Calculation for Scour Level


Mean scour Depth 0.3
Db2
dsm = 1.34 x ------ As per IRC: 5 -2015 Clause 106.9.3.1
Ksf (page no.25)
Where,
Db = Designed discharge in m3/s per meter width
dsm = Normal scour depth in m
Ksf = Silt factor for material obtain upto deepest anticipated scour
2.45 (Silt factor ) As per IRC: 5 -2015 Clause 106.9.3.1
(page no.25)
3
30% increased design Discharge is = 702.4524 m /sec
Db = 702.45 As per IRC: 5 -2015 Clause 106.9.3.1
46.60 (page no.25)
= 15.07 m
dsm = 1.34 x ((15.07^2)/2.45)^0.33 As per IRC: 5 -2015 Clause 106.9.3.1
6.06 m (page no.25)

Scour Level Bottom of Cut-off Wall


Outer Wall = 276.235 m > 274.200 m Hence Ok
Inner Wall = 276.235 m > 274.200 m Hence Ok

HFL = 282.300 m
RTL = 281.700 m

LBL = 277.5
Raft Top = 277.2
1.265
Scour Level = 276.235 m
3.0

Bottom of Cut-off Wall = 274.2

The Span Arrangement of Bridge is as shown Above


RTL = 281.700 m
Top of Box = 281.548 m
Soffit = 280.848 m
H.F.L. at proposed section = 281.700 m
L.B.L. at proposed section = 277.500 m
Total discharge = 529.764 cumec

3.7) Afflux Calculation by Molesworth's formula

Afflux = V2 + 0.015 { ( A / A1 )2 - 1 }
17.88 As per IRC: 5 -2015 Clause 106.6.2
(page no.23)
Where,
Mean Velocity V = 1.890 m/sec

Unobstructed Sectional Area A = Total Area - Obstructed Area


= 205.80 - 43.06
2
= 162.74 m

Obstructed area = (Total Width of Slab X (Top of Box - Soffit)) +


(No. of Walls*(Soffit-Raft Top)*Thickness of Wall)
= 49.00 x 0.700 +
4 x 3.648 x
0.60
2
= 43.06 m

Total Area = (Total Width of Box) - (HFL-Raft Top)


= 49.00 x 281.70 -
277.50
2
= 205.80 m

Percentage of obstruction = Obstructed Area x 100


Total Area
= 43.06 x 100
205.80
= 20.92 %

2
Sectional Area at Obstruction A1 = 119.69 m

Afflux = 0.182 mtr. Hence OK.


5) Summary

Catchment Area 25.90 Km2


Linear waterway 48.55 m
Manning's Discharge 529.76 m3/sec
Design Discharge 540.35 m3/sec
Rugosity coefficients 0.030
Wetted area 229.15 m2
Wetted perimeter 69.32 m
Hydraulic Mean Depth 3.022 m

Velocity 1.89 m/sec


Bed slope 1 in 1115
Clearance 1.2 m
Afflux 0.182 m