Sie sind auf Seite 1von 3

NEAR MISS REPORT (AEC-HSE-PM-02-03)

(Page 1)
Engineering & Construction Co. L.L.C
Client Name: …………………………………
Project No.: ………………………………….
Poject Name: ………………………………. NEAR MISS REPORT
Sub-contractor Name: ……………………
Location: ……………………………………..

Date observed: ……………………………………………….


Location: ……………………………………………………..

HAZARD DESCRIPTION (Please write what you saw and where it took place):

WERE YOU ABLE TO CORRECT THE PROBLEM?


YES NO

WHAT ACTION WAS TAKEN SUGGESTED

OBS ERVER NAME/ I.D. NO. (optional):

Please complete reverse side. This portion to be completed by the Project HSE / Sub-contractor's HSE
IS DETAILED INVES TIGATION REQUIRED?

YES NO
Procedure No. AEC-HSE-PM-02 Form:03 Revision No.: 00 Effective Date: 01/08/2012
NEAR MISS REPORT (AEC-HSE-PM-02-03)
(Page 2)
Engineering & Construction Co. L.L.C
TICK WHERE APPROPRIATE
What Hazardous act/ condition did you see?
A. PPE G) ENGINEERING
1) Head protection not w orn ……………………….. 1) Moving parts not guarded ………………
2) Eye protection not w orn ………………………….. 2) Electrical substandard ……………………….
3) Face protection not w orn ………………………… 3) Chemical substandard ……………………………..
4) Ear protection not w orn ………………………….. 4) Pressure substandard ……………………………..
5) Protective clothing not w orn ……………………… 5) Maintenance substandard …………………………
6) Safety shoes not w orn ……………………………. H) ENVIRONMENT
7) Hand protection not w orn …………………………. 1) Water is being polluted ……………………………..
8) PPE in bad condition ……………………………….. 2) Air is being polluted …………………………………
9) Wrong PPE for the job …………………………….. 3) Too much noise …………………………………….
10) Substandard PPE …………………………………. 4) Radiation exposure …………………………………
B) TOOLS/EQUIPMENT Why did the hazardous act / condition occur?
1) Wrong tool for the job ……………………………… J) NOT AWARE
2) Tools in bad condition ……………………………… 1) Not informed ………………………………………..
3) Tools not inspected ……………………………….. 2) Language problem ………………………………….
4) Misuse ………………………………………………. 3) Not reading permit …………………………………..
C) MATERIAL HANDLING 4) Wrong interpretation of risk ……………………….
1) Too heavy for manual lifting ………………………. 5) Wrong instruction ………………………………….
2) Wrong mechanical manual lifting …………………. 6) No procedure ……………………………………….
3) Lifting tool not inspected …………………………… 7) Forgotten …………………………………………….
4) Chemicals not properly handled ……………………… K) AWARE
D) POSITIONS OF PEOPLE 1) Negligence …………………………………………..
1) In danger of struck by………………………………. 2) Working condition (including w eather) …………..
2) In danger of striking against ………………………. 3) Worksite layout ……………………………………..
3) In danger of caught by ……………………………. 4) The design of equip./tools …………………………
4) In danger of fall/ slip / trip …………………………. 5) Work habits ………………………………………….
5) In danger of burnt …………………………………. 6) Lack of skill ………………………………………….
6) Wrong position …………………………………….. 7) Time pressure ………………………………………
7) In danger of electricity …………………………….. 8) Not requested ………………………………………
E) HOUSEKEEPING 9) Physical limitations ………………………………….
1) Access block by obstruction …………………….. 10) Not supplied / available …………………………..
2) Tools/materials discorganized …………………….
3) Poor/ improper roping off ………………………….
4) Accumulation of rubbish ………………………….
F) PERMIT / PROCEDURES
1) Work w ithout permission …………………………..
2) Wrong permit ………………………………………..
3) Procedure not follow ed ……………………………
4) Wrong intruction on permit …………………………
5) Permit procedure not follow ed …………………….
Procedure No. AEC-HSE-PM-02 Form:03 Revision No.: 00 Effective Date: 01/08/2012