PLUMBING LABOUR RATES PER BATHROOM Rs 7,000 (Basic) to Rs

10,000 (Basic)
The current Plumbing rates varies between Rs 7,000 to Rs 15,000 for each Bathroom which includes the
fixing of shower panels, western closet (WC), washbasins, health faucet, shower heads, mixtures, two
way diverters, valves, all taps, solar hot water valve, shower enclosures fittings, soap racks, towel
rod, holders , flush tank etc.

INCLUDING MATERIALS and LABOR rates Rs 50,000 (Basic) to Rs

80,000 (Standard)
For a Bathroom to be made fully fitted with materials and labor including all basic fittings will cost Rs
50,000 for a small bathroom and upwards of Rs 80,000 for a Standard bathroom size. These proposed rates
don’t include high-end bath wares like the bathtub, Jacuzzi, shower enclosures, steam etc.

One can decide on his budget on how much one wants to spend on additional fit-outs. In today’s lifestyle,
one efficiently spends upwards of Rs 1 lac for an attached bathroom.

Type Plumbing rates in Bangalore/ Plumber rates / LABOR LABOR


Plumber labour work cost in Bangalore charges (per & MATERIAL
DETAILS of PLUMBING WORKS bathroom)
Basic Labor rates for laying of CPVC/PVC pipes for water Rs 7000/- Rs 50,000/-
supply including fittings,chase cutting,hole
cutting,making the walls good,Laying of PVC/UPVC
pipes for soil & waste including accessories,installation
of CP fitting & fixtures which includes 1 basin,1 Mirror,1
Towel rail, 2 tap points,1 Electric water heater,1
European water closet & 1 shower
Standard Labor rates for laying of CPVC/PVC pipes for water Rs 10,000/- Rs 80,000/-
supply including fittings,chase cutting,hole
cutting,making the walls good,Laying of PVC/UPVC
pipes for soil & waste including fittings,installation of CP
fitting & fixtures which includes 1 basin,1 Mirror, 1
Towel rail,2 tap points,1 Electric water heater,1
European water closet , 1 Shower, Wall mixture, Basin
mixture & Health faucet

ITEM RATES FOR PLUMBING LABOR WORK


The below mentioned are item rates for plumbing labor costs for all kinds of work including rainwater
harvesting, drainage lines, excavation, PCC, water supply lines, bathtub or Jacuzzi fitting, waterproofing,
shower cubical, drain pit construction etc. The current overall cost of construction for a residential
building is at Rs 1600 / sft to Rs 2000 / sft.

Sl. Item rates for Plumbing work / Plumbing labour work in Labor Rate
No. Bangalore
DETAILS of PLUMBING WORKS
1 UPVC Rainwater pipes(100mm dia) 150/ rm
2 Soil & Waste pipes(100mm dia PVC/UPC) 170/rm
3 Drainage line for soil & waste( S.W. Pipes 100 mm dia) 350/-
including civil work such as excavation, P.C.C. encasing,etc.
4. Water supply line for the riser,downtake, tank connection &ring 125/-rm
line(upto 50mm dia PVC/CPVC)
5. JACUZZI/BATHTUB LS : 3000/-
6. SHOWER CUBICLE LS : 2000/-
7. WATERPROOFING 200/Sq.mtr
Abbreviations used : LS : Lump sum , RM – Running meter, Sq.mtr – Square meter, SFT- Square Feet.