To Do List IT KJ JBB SBS

Cut Off Date

No Pekerjaan Kegiatan Target PIC


RKAP 2018
Orcom EoT 10-May-19 Andika

Orcom PKTK 28-Jun-19 Andika

Laporan Bulanan 10-May-19 Andika

As Built Document 3-May-19 Andika


Perbaikan Jaringan Pipa Baja Dia 16'' Daan Penagihan progress 100% 15-May-19 Andika
1 Mogot
Invoice 15-May-19 Niken & Irma
Penagihan progress PKTK TBA Andika
Pemasangan Plug Valve 1-Jul-19 Andika
Pemeriksaan Lapangan 8-Jul-19 Andika
Amandemen Kontrak Niken
Gate Review V 30-Apr-19 Andika
Laporan Bulanan 26-Jun-19 Andika
Orcom PKTK 28-Jun-19 Andika

Penagihan progress TBA Andika


2 Relokasi MRS PT Huntsman
As Built Document 28-Jun-19 Andika
Pemeriksaan Lapangan 8-Jul-19 Andika
Amandemen Kontrak Niken
Gate Review V 30-Apr-19 Andika

FAT PCV 5-Apr-19 Jonli

PSSR 11-Apr-19 Jonli


Orcom PKTK 17-May-19 Jonli
Pengembalian Material 15-May-19 Jonli

3 Upgrading Offtake Surya Cipta


Training 15-May-19 Jonli
3 Upgrading Offtake Surya Cipta
Pemeriksaan Lapangan 15-May-19 Jonli
Material oleh Kontraktor 28-Jun-19 Jonli
BAP BAPK Invoice 28-Jun-19 Jonli
Amandemen Kontrak Niken

Laporan QA/QC, Harian dan Bulanan 28-Jun-19 Jonli

Pemasangan pipa distribusi Kuala Pangan & Indocords 8-Jul-19 Halid

Cut and Connect Kuala Pangan 8-Jul-19 Halid


4 Pindah Tapping Looping Citeureup
Hot Tapping Indocordsa 24-May-19 Halid
Pengambilan material 10-Apr-19 Rosidin
PSSR TBA Halid

Perbaikan Fire Water Pump + Dinamo Starter rusak TBA Jonli

5 Upgrading Tangsi Station Penggantian part Flow Comp TBA


Jonli
Perbaikan PCV TBA Jonli
Perbaikan Check Valve TBA Jonli
6 Ring Line 1 Extension Pengaspalan Muara PLN Muara Karang 3-May-19 Andika
Pengecoran Pipa Ekspos Samping Jembatan
7 Kehandalan Jaringan JBB 12-Apr-19 Halid
Indocorsa
BAPL Demang Lebar Daun 19-Mar-19 Diki
Finalisasi Laporan Harian dan Bulanan PU & DLD 3-May-19 Diki
F&G System Batu Ceper, Pondok Ungu II,
8 Penagihan progress 100% 10-May-19 Diki
Demang Lebar Daun
Invoice 17-May-19 Niken & Irma
Retensi F&G Batu Ceper 28-Jun-19 Niken & Irma
Negosiasi harga kerja tambah 8-Apr-19 Jonli
Finalisasi Laporan Bulanan 3-May-19 Jonli
Finalisasi amandemen 17-May-19 Jonli
10 Penggantian R/S Warung Bongkok
Penagihan progress 100% 28-Jun-19 Jonli
Pemeriksaan Teknis 5-Jul-19 Jonli
10 Penggantian R/S Warung Bongkok

Invoice 28-Jun-19 Niken & Irma


Finalisasi Laporan Bulanan 3-May-19 Jonli
Finalisasi amandemen 17-May-19 Jonli
11 Koneksi Pipa Realokasi 12" Cikarang Kecil Penagihan progress 100% 28-Jun-19 Jonli
Pemeriksaan Teknis 5-Jul-19 Jonli
Invoice 28-Jun-19 Niken & Irma
BAPL 8-Jul-19 Andika
12 Pemasangan Casing Pipa di Jembatan SawojajarAs Built Document 28-Jun-19 Andika
Gate Review V 30-Apr-19 Andika
RKAP 2019
Aanwijzing 9-Apr-19 Diki
Negosiasi 10-Apr-19 Diki
1 Pemasangan Jalur Pipa Baru Ke Tanjung PrioKontrak TBA Niken
SPMK TBA Niken
Uang Muka 20% TBA Niken
Penyusunan Dokumen Teknis 11-Apr-19 Jonli
ND Permintaan Pengadaan 29-Apr-19 Niken
SPPH 3-May-19 Jonli
Gate Review II 26-Apr-19 Jonli
2 Penggantian Pipa DCI Jaringan Rusun Tanah Ab Aanwijzing 13-May-19 Jonli
Pemasukan penawaran 20-May-19 Jonli
Kontrak 24-May-19 Niken
Gate Review III 24-May-19 Jonli
Konstruksi 1-Jul-19 Jonli
3 Zinker Pipa Jembatan Hitam POL 12-Apr-19 Jonli
Penyusunan Dokumen Teknis 12-Apr-19 Diki
ND Permintaan Pengadaan 12-Apr-19 Diki
SPPH 3-May-19 Diki

4 Wet Calibration Ultrasonic Gas Flow Meter Negosisasi 10-May-19 Diki

Evaluasi HPS 17-May-19 Diki


4 Wet Calibration Ultrasonic Gas Flow Meter

Pengadan Ulang TBA Diki


Gate Review III 30-Apr-19 Diki
12-Apr-19 Halid & Ridwan

Penyusunan Dokumen Teknis

Penggantian Jaringan Schedule 20 - Maxim ke


5 ND Permintaan Pengadaan 12-Apr-19 Niken
arah Cibinong
SPPH 3-May-19 Halid
Aanwijzing 13-May-19 Halid
Pemasukan penawaran 21-May-19 Halid
Gate Review III 24-May-19 Halid
Expose ke BPJN VI (perijinan) 24-Jun-19 Halid
Kontrak TBA Halid
Kick Off Meeting 9-Apr-19 Andika
Pengambilan material 11-Apr-19 Andika
Pekerjaan Manual Boring 19-Jun-19 Andika
Realokasi Jalur Pipa dan Zinker Jembatan 19-Jun-19 Andika
6 Hydrostatic Test, FJC, Pemotongan Spool Pipe
Sukaraja Dia 10''
Insert Pipe 20-Jun-19 Andika
Pembongkaran Bak Valve Mall Jambu Dua 25-Jun-19 Andika
Fabrikasi spool FC Mall Jambu Dua 22-Jun-19 Andika
Penyusunan Dokumen Teknis 12-Apr-19 Diki & Ridwan
ND Permintaan Pengadaan 12-Apr-19 Niken
SPPH 15-Apr-19 Diki
Gate Review III 30-Apr-19 Diki
7 Pemasangan Navigational Buoy di Nearshore BJ
Negosisasi 10-May-19 Diki

Evaluasi HPS 17-May-19 Diki


Kontrak 21-Jun-19 Diki
Survey 15-Apr-19 Ridwan
Penyusunan Dokumen Teknis 3-May-19 Ridwan & Diki

Pekerjaan Koneksi Jaringan Pipa Gas 16" di 3


8 Lokasi Area Cilegon
Usulan Realokasi RKAP 28-Jun-19 Irma
Pekerjaan Koneksi Jaringan Pipa Gas 16" di 3
8 Gate Review II ulang 28-Jun-19 Ridwan
Lokasi Area Cilegon
ND Permintaan Pengadaan TBA Niken
SPPH TBA Ridwan
FEL III TBA Ridwan
Penyusunan Dokumen Teknis 17-May-19 Rosidin & Ridwan
Persetujuan Realokasi RKAP 28-Jun-19 Irma
ND Permintaan Pengadaan TBA Niken
9 Pemasangan R/S Underground SPPH TBA Rosidin
Gate Review III TBA Rosidin
Kontrak TBA Rosidin

ND Permintaan Pengadaan 29-Apr-19 Niken


SPPH 3-May-19 Niken
10 Jasa Kompresi Muara Karang (tahun ke-2) Kontrak 6-May-19 Niken
BA Mei 2019 28-Jun-19 Niken
Invoice Mei 2019 28-Jun-19 Niken
REALISASI 2019
BA Desember 2018 - Februari 2019 10-Apr-19 Niken
Invoice Desember 2018 - Februari 2019 12-Apr-19 Niken
BA Maret 2019 15-Apr-19 Niken
1 Jasa Kompresi Muara Karang
Invoice Maret 2019 16-Apr-19 Niken
BA April 2019 10-May-19 Niken
Invoice April 2019 13-May-19 Niken
10/14/2019

Keterangan

ND ke GH akan dilakukan setelah


penyelesaian orcom PKTK.
Evaluasi penawaran PKTK dari PGAS.
Laporan disampaikan PGAS pada 10
Mei 2019.
Selesai.
BAP BAPK pekerjaan original 100%

Amandemen kontrak

Koordinasi dengan GDMR I

Aktual 26 April 2019


Belum disubmit resmi oleh PGAS

Menunggu penawaran resmi dari


PGAS.
Amandemen kontrak.
Tersisa dokumen prosedur.

Aktual 26 April 2019


Aktual PCV B 21 April 2019, PCV A 27
April 2019.
Aktual 11 April 2019
Kerja kurang orifice plate.
Aktual 27 Mei 2019
Aktual 27 Mei 2019
Aktual 27 Mei 2019
Junction Box akan dikirim ke gudang Klari

Kuala Pangan akan dilakukan


pertama, Indocordsa pending.

Tidak jadi dilaksanakan


Aktual 25 April 2019

Menunggu perbaikan dinamo starter


Dilakukan bersamaan dengan
penggantian PCV
Target PO PCV pada M4-Juni 2019
Menunggu pemasangan PCV

BAP BAPK pekerjaan original 100%

Aktual 26 April 2019

BAP BAPK pekerjaan original 100%


BAP BAPK pekerjaan original 100%

Tersisa dokumen engineering.


Aktual 26 April 2019

Aktual 9 April 2019


Aktual 16 April 2019
Aktual 8 Mei 2019
Aktual 8 Mei 2019

Aktual 26 April 2019


Aktual 13 Mei 2019

Aktual 28 Mei 2019


GR III dengan Maxim Cibinong
Tanggal Mulai Kerja 11 Juni 2019
Sudah disampaikan ke PMD.

Aktual 22 April 2019

Tidak terjadi kesepakatan harga, nilai


penawaran di atas HPS.
Menunggu arahan GH PMO
Aktual 26 April 2019
Penambahan Scope:
1. Penyambungan Pipa Induk Jambu
2
2. Penyambungan Pipa Dinas Good
Year
3. Penyambungan Pipa Induk dan
Pipa Dinas R/S Pejagalan

Aktual 18 April 2019.

Aktual 13 Mei 2019

menunggu GH Definitif
Aktual 27 Maret 2019.
Aktual 25 April 2019.

Aktual 18 April 2019.

Aktual 26 April 2019


Tidak terjadi kesepakatan harga, nilai
penawaran di atas HPS.

Menunggu jaminan pelaksanaan


n & Ridwan

Menuju persetujuan FID dan


realokasi anggaran.

Dalam proses review AME.


Menunggu tanda tangan kontrak
ke gudang Klari
RENCANA KEGIATAN IN

INTEGRATED TEAM KEHANDALAN JARINGAN JAWA BAGIAN BARAT

TARGET FISIK
TOTAL NILAI RKAP NILAI RKAP 2019 BOBOT TARGET REALISASI FISIK
NO NO RKUP TERKAIT NAMA KEGIATAN S.D 2019
GAS IN S/D 2018
( Rp.) ( Rp.) (%) (%)

1 PMO/06/03/2017-M3-2 Penyaluran Gas PLN Muara Karang 98,703,869,249 43,692,925,792 56.53 2018

PMO/06/03/2017-M3-2 PROJECT
PMO/06/03/2017-M3-2 EPC Penyaluran Gas PLN Muara Karang Phase 1 100 100
PMO/06/03/2017-M3-2 Jasa Kompresi Gas 100 100

PMO/06/03/2017-M3-2 EPC Penyaluran Gas PLN Muara Karang Phase 1 10,256,313,086 1,323,139,564 1.71
PMO/06/03/2017-M3-2 Jasa Kompresi Gas 88,447,556,163 42,369,786,228 54.81

2 BUI/03/10/2018-L Perbaikan R/S Warung Bongkok 2,100,442,507 210,044,250 0.27 2018

BUI/03/10/2018-L FEL - 1 18 18
BUI/03/10/2018-L FEL - 2 15 15
BUI/03/10/2018-L FEL - 3 14 14
BUI/03/10/2018-L IMPLEMENTASI 13 13
BUI/03/10/2018-L PROJECT 100 100
BUI/03/10/2018-L OPERASI 9 9

BUI/03/10/2018-L Pengadaan material (pipa, fitting & MR/S) 1,243,797,361 124,379,736 0.16
BUI/03/10/2018-L Penggantian R/S Warung Bongkok 710,497,851 71,049,785 0.09
BUI/03/10/2018-L TAS 146,147,294 14,614,729 0.02

Pekerjaan Penggantian Pipa DCI Jaringan Rusun Tanah Abang dan Tebet
3 BUI/04/00/2019 4,284,143,031 4,284,143,031 5.54 2019
X
BUI/04/00/2019 FEL - 1 18 -
BUI/04/00/2019 FEL - 2 15 -
BUI/04/00/2019 FEL - 3 14 -
BUI/04/00/2019 IMPLEMENTASI 13 -
BUI/04/00/2019 PROJECT 100 -
BUI/04/00/2019 OPERASI 9 -

BUI/04/00/2019 Pengadaan Material PE 884,043,864 884,043,864 1.14


RENCANA KEGIATAN IN

INTEGRATED TEAM KEHANDALAN JARINGAN JAWA BAGIAN BARAT

TARGET FISIK
TOTAL NILAI RKAP NILAI RKAP 2019 BOBOT TARGET REALISASI FISIK
NO NO RKUP TERKAIT NAMA KEGIATAN S.D 2019
GAS IN S/D 2018
( Rp.) ( Rp.) (%) (%)
BUI/04/00/2019 Pekerjaan Persiapan 233,977,747 233,977,747 0.30
BUI/04/00/2019 Pekerjaan Bongkaran & Galian 478,148,000 478,148,000 0.62
BUI/04/00/2019 Pekerjaan Pemasangan & Pengujuan 229,165,420 229,165,420 0.30
BUI/04/00/2019 Pekerjaan Perbaikan 2,436,126,000 2,436,126,000 3.15
BUI/04/00/2019 Pekerjaan Penyelesaian Akhir 22,682,000 22,682,000 0.03

4 BUI/05/00/2019 Pekerjaan Zinker Pipa Jembatan Hitam - Jakarta 212,160,048 212,160,048 0.27 2019

BUI/05/00/2019 FEL - 1 18 -
BUI/05/00/2019 FEL - 2 15 -
BUI/05/00/2019 FEL - 3 14 -
BUI/05/00/2019 IMPLEMENTASI 13 -
BUI/05/00/2019 PROJECT 100 -
BUI/05/00/2019 OPERASI 9 -

BUI/05/00/2019 Pengadaan Material 31,769,998 31,769,998 0.04


BUI/05/00/2019 Pekerjaan Persiapan 95,279,690 95,279,690 0.12
BUI/05/00/2019 Pekerjaan Bongkaran & Galian 10,844,725 10,844,725 0.01
BUI/05/00/2019 Pekerjaan Pemasangan 50,010,397 50,010,397 0.06
BUI/05/00/2019 Pekerjaan Perbaikan 10,991,231 10,991,231 0.01
BUI/05/00/2019 Pekerjaan Pengujian 1,719,237 1,719,237 0.00
BUI/05/00/2019 Pekerjaan Penyelesaian Akhir 11,544,772 11,544,772 0.01

5 BUI/06/00/2019 Perbaikan TR Gang Macan & Pulogadung 1,121,348,692 1,121,348,692 1.45 2019

BUI/06/00/2019 FEL - 1 18 -
BUI/06/00/2019 FEL - 2 15 -
BUI/06/00/2019 FEL - 3 14 -
BUI/06/00/2019 IMPLEMENTASI 13 -
BUI/06/00/2019 PROJECT 100 -
BUI/06/00/2019 OPERASI 9 -

BUI/06/00/2019 Pengadaan Material TR Gang Macan 39,633,000 39,633,000 0.05


RENCANA KEGIATAN IN

INTEGRATED TEAM KEHANDALAN JARINGAN JAWA BAGIAN BARAT

TARGET FISIK
TOTAL NILAI RKAP NILAI RKAP 2019 BOBOT TARGET REALISASI FISIK
NO NO RKUP TERKAIT NAMA KEGIATAN S.D 2019
GAS IN S/D 2018
( Rp.) ( Rp.) (%) (%)
BUI/06/00/2019 Pengadaan & Pemasangan Groundbed Pulogadung 934,775,222 934,775,222 1.21
BUI/06/00/2019 Pekerjaan Persiapan Gang Macan 16,095,170 16,095,170 0.02
BUI/06/00/2019 Pekerjaan Service & Pemasangan Kembali Gang Macan 19,536,000 19,536,000 0.03
BUI/06/00/2019 Pekerjaan Testing & Comissioning Gang Macan 13,030,611 13,030,611 0.02
BUI/06/00/2019 Pengukuran Performance Katodik Jalur Pipa Gang Macan 6,956,974 6,956,974 0.01
BUI/06/00/2019 Pekerjaan Persiapan Pulogadung 58,134,130 58,134,130 0.08
BUI/06/00/2019 Pekerjaan Design Engineering Pulogadung 13,200,000 13,200,000 0.02
BUI/06/00/2019 Pekerjaan Testing & Comissioning Pulogadung 13,030,611 13,030,611 0.02
BUI/06/00/2019 Pengukuran Performance Katodik Jalur Pipa Pulogadung 6,956,974 6,956,974 0.01

Wet Calibration Ultrasonic Gas Flow Meter (USM) 81-FT-1360A dan 81-FT-
6 BUI/15/00/2019 6,274,400,000 6,274,400,000 8.12 2019
1360A
BUI/15/00/2019 FEL - 1 18 -
BUI/15/00/2019 FEL - 2 15 -
BUI/15/00/2019 FEL - 3 14 -
BUI/15/00/2019 IMPLEMENTASI 13 -
BUI/15/00/2019 PROJECT 100 -
BUI/15/00/2019 OPERASI 9 -

Wet Calibration Ultrasonic Gas Flow Meter (USM) 81-FT-1360A dan 81-FT-
BUI/15/00/2019 6,274,400,000 6,274,400,000 8.12
1360A

7 PMO/01/01/2019-M1-2 Penggantian Jaringan Schedule 20 - Maxim ke arah Cibinong 29,715,681,949 9,379,682,295 12.13 2020

PMO/01/01/2019-M1-2 FEL - 1 18 18
PMO/01/01/2019-M1-2 FEL - 2 15 15
PMO/01/01/2019-M1-2 FEL - 3 14 -
PMO/01/01/2019-M1-2 IMPLEMENTASI 8 -
PMO/01/01/2019-M1-2 PROJECT 20 -
PMO/01/01/2019-M1-2 OPERASI - -

PMO/01/01/2019-M1-2 Material Pipa dan Fitting 6,268,241,081 705,948 0.00


PMO/01/01/2019-M1-2 Penggantian Jaringan Schedule 20 - Maxim ke arah Cibinong 22,330,862,448 8,932,344,979 11.56
PMO/01/01/2019-M1-2 Jasa Asitensi Teknik (Penggantian Pipa) 1,116,578,420 446,631,368 0.58
RENCANA KEGIATAN IN

INTEGRATED TEAM KEHANDALAN JARINGAN JAWA BAGIAN BARAT

TARGET FISIK
TOTAL NILAI RKAP NILAI RKAP 2019 BOBOT TARGET REALISASI FISIK
NO NO RKUP TERKAIT NAMA KEGIATAN S.D 2019
GAS IN S/D 2018
( Rp.) ( Rp.) (%) (%)
RENCANA KEGIATAN IN

INTEGRATED TEAM KEHANDALAN JARINGAN JAWA BAGIAN BARAT

TARGET FISIK
TOTAL NILAI RKAP NILAI RKAP 2019 BOBOT TARGET REALISASI FISIK
NO NO RKUP TERKAIT NAMA KEGIATAN S.D 2019
GAS IN S/D 2018
( Rp.) ( Rp.) (%) (%)

8 PMO/03/03/2017-M3-2 Upgrading Offtake Stasiun Surya Cipta 24,444,639,476 1,076,510,072 1.39 2019

PMO/03/03/2017-M3-2 FEL 1 18 18
PMO/03/03/2017-M3-2 FEL 2 15 15
PMO/03/03/2017-M3-2 FEL 3 14 14
PMO/03/03/2017-M3-2 IMPLEMENTASI 13 13
PMO/03/03/2017-M3-2 PROJECT
PMO/03/03/2017-M3-2 - Upgrading Offtake Stasiun Surya Cipta 100 39.53
PMO/03/03/2017-M3-2 OPERASI 9 -

PMO/03/03/2017-M3-2 Upgrading Offtake Stasiun Surya Cipta 24,444,639,476 1,076,510,072 1.39

9 BUI/14/28/2016-M4-2 Perbaikan untuk Kehandalan Jaringan RD I 12,228,355,057 9,407,071,280 12.17 2019

Pemasangan F&G
BUI/14/28/2016-M4-2 FEL - 1 18 18
BUI/14/28/2016-M4-2 FEL - 2 15 15
BUI/14/28/2016-M4-2 FEL - 3 14 14
BUI/14/28/2016-M4-2 IMPLEMENTASI 13 13
BUI/14/28/2016-M4-2 PROJECT 100 100
BUI/14/28/2016-M4-2 - Pemasangan F & G Demang Lebar Daun
BUI/14/28/2016-M4-2 - Pemasangan F & G Pondok Ungu II
BUI/14/28/2016-M4-2 OPERASI 9 9
Pekerjaan Pipa & Zinker
BUI/14/28/2016-M4-2 FEL - 1 18 18
BUI/14/28/2016-M4-2 FEL - 2 15 15
BUI/14/28/2016-M4-2 FEL - 3 14 14
BUI/14/28/2016-M4-2 IMPLEMENTASI 13 1
BUI/14/28/2016-M4-2 PROJECT
BUI/14/28/2016-M4-2 - Perbaikan Jaringan Pipa Baja Dia 16'' Daan Mogot 100 -
BUI/14/28/2016-M4-2 - Realokasi Jalur Pipa dan Zinker Jembatan Sukaraja Dia 10'' 100 -
BUI/14/28/2016-M4-2 - Pekerjaan Zinker Pipa Baja Sawo Jajar 100 -
RENCANA KEGIATAN IN

INTEGRATED TEAM KEHANDALAN JARINGAN JAWA BAGIAN BARAT

TARGET FISIK
TOTAL NILAI RKAP NILAI RKAP 2019 BOBOT TARGET REALISASI FISIK
NO NO RKUP TERKAIT NAMA KEGIATAN S.D 2019
GAS IN S/D 2018
( Rp.) ( Rp.) (%) (%)
BUI/14/28/2016-M4-2 OPERASI 9 -

BUI/14/28/2016-M4-2 Pemasangan F & G Demang Lebar Daun 1,472,548,100 1,178,038,480 1.52


BUI/14/28/2016-M4-2 Pemasangan F & G Pondok Ungu II 1,094,300,000 860,941,840 1.11
BUI/14/28/2016-M4-2 Perbaikan Jaringan Pipa Baja Dia 16'' Daan Mogot 4,228,244,000 3,382,595,200 4.38
BUI/14/28/2016-M4-2 Realokasi Jalur Pipa dan Zinker Jembatan Sukaraja Dia 10'' 4,190,574,000 3,352,459,200 4.34
BUI/14/28/2016-M4-2 Pekerjaan Zinker Pipa Baja Sawo Jajar 244,376,000 195,500,800 0.25
BUI/14/28/2016-M4-2 PMC 998,312,957 437,535,760 0.57

10 PR3/01/03/2013-M7-2 Upgrade Rawamaju 1,986,000,000 198,600,000 0.26 2018

PR3/01/03/2013-M7-2 FEL - 1 18 18
PR3/01/03/2013-M7-2 FEL - 2 15 15
PR3/01/03/2013-M7-2 FEL - 3 14 14
PR3/01/03/2013-M7-2 IMPLEMENTASI 13 13
PR3/01/03/2013-M7-2 PROJECT 100 100
PR3/01/03/2013-M7-2 OPERASI 9 9

PR3/01/03/2013-M7-2 Pekerjaan Tie In Realokasi Pipa 12 Inch Cikarang 1,986,000,000 198,600,000 0.26

11 PMO/03/01/2016-LLL Perbaikan dan Peningkatan Kehandalan Jaringan 1,114,007,000 445,602,800 0.58 2018

Pemasangan F&G
PMO/03/01/2016-LLL FEL - 1 18 18
PMO/03/01/2016-LLL FEL - 2 15 15
PMO/03/01/2016-LLL FEL - 3 14 14
PMO/03/01/2016-LLL IMPLEMENTASI 13 13
PMO/03/01/2016-LLL PROJECT
PMO/03/01/2016-LLL - Kegiatan peningkatan kehandalan jaringan Area Tangerang 100 100
PMO/03/01/2016-LLL OPERASI 9 9

PMO/03/01/2016-LLL Kegiatan peningkatan kehandalan jaringan Area Tangerang 1,114,007,000 445,602,800 0.58
RENCANA KEGIATAN IN

INTEGRATED TEAM KEHANDALAN JARINGAN JAWA BAGIAN BARAT

TARGET FISIK
TOTAL NILAI RKAP NILAI RKAP 2019 BOBOT TARGET REALISASI FISIK
NO NO RKUP TERKAIT NAMA KEGIATAN S.D 2019
GAS IN S/D 2018
( Rp.) ( Rp.) (%) (%)

12 BUI/14/00/2019 Pemasangan Navigational Buoy di Nearshore BJN 993,546,908 993,546,908 1.29 2019

BUI/14/00/2019 FEL 1 18 -
BUI/14/00/2019 FEL 2 15 -
BUI/14/00/2019 FEL 3 14 -
BUI/14/00/2019 IMPLEMENTASI 13 -
BUI/14/00/2019 PROJECT 100 -
BUI/14/00/2019 OPERASI 9 -

BUI/14/00/2019 Navigational Buoy 993,546,908 993,546,908 1.29

RENCANA FISIK PER BULAN


RENCANA KUMULATIF FISIK 2,334.00 100.00 1,056.53

RENCANA KEUANGAN PER BULAN


KUMULATIF RENCANA KEUANGAN 183,178,593,917 77,296,035,168
PERSENTASE KUMULATIF KEUANGAN

KETERANGAN :

: Proses Lelang Rencana Fisik


: Masa Konstruksi Rencana Keuangan
: Masa Pemeliharaan
: Rencana Keuangan
Bobot dibuat berdasarkan nilai RKAP di tahun berjalan
PT PERUSAHAAN GAS NEGARA (Persero) Tbk.
NA KEGIATAN INVESTASI PEMBANGUNAN JARINGAN PIPA, MODA TRANSPORTASI LAIN DAN/ATAU FASILITAS PENUNJANGNYA
DANA : APGN

TAHUN 2019

JAN FEB MAR APR MEI JUNI JULI AGT SEP

500,000,000 1,000,000,000 500,000,000 500,000,000 500,000,000 500,000,000 500,000,000 500,000,000

124,379,736
71,049,785
14,614,729

18
15
14
1 7
5 10 20 20

176,808,773 176,808,773
PT PERUSAHAAN GAS NEGARA (Persero) Tbk.
NA KEGIATAN INVESTASI PEMBANGUNAN JARINGAN PIPA, MODA TRANSPORTASI LAIN DAN/ATAU FASILITAS PENUNJANGNYA
DANA : APGN

TAHUN 2019

JAN FEB MAR APR MEI JUNI JULI AGT SEP

46,795,549 46,795,549
95,629,600 95,629,600
45,833,084 45,833,084
487,225,200 487,225,200
4,536,400 4,536,400

18
15
14
13
100
9

6,354,000 22,238,998 3,177,000


19,055,938 66,695,783 9,527,969
2,168,945 7,591,307 1,084,472
10,002,079 35,007,278 5,001,040
2,198,246 7,693,862 1,099,123
343,847 1,203,466 171,924
2,308,954 8,081,340 1,154,477

18
15
14
1 7
5 10 20 20

7,926,600 7,926,600
PT PERUSAHAAN GAS NEGARA (Persero) Tbk.
NA KEGIATAN INVESTASI PEMBANGUNAN JARINGAN PIPA, MODA TRANSPORTASI LAIN DAN/ATAU FASILITAS PENUNJANGNYA
DANA : APGN

TAHUN 2019

JAN FEB MAR APR MEI JUNI JULI AGT SEP

186,955,044 186,955,044
3,219,034 3,219,034
3,907,200 3,907,200
2,606,122 2,606,122
1,391,395 1,391,395
11,626,826 11,626,826
2,640,000 2,640,000
2,606,122 2,606,122
1,391,395 1,391,395

18
15
14
8 5
50 50
9

1,254,880,000 4,392,080,000

14
1 7
1 2 2 2 2 2

141,190 141,190
1,786,468,996 1,786,468,996
44,663,137 44,663,137 44,663,137 44,663,137 44,663,137 44,663,137 44,663,137
PT PERUSAHAAN GAS NEGARA (Persero) Tbk.
NA KEGIATAN INVESTASI PEMBANGUNAN JARINGAN PIPA, MODA TRANSPORTASI LAIN DAN/ATAU FASILITAS PENUNJANGNYA
DANA : APGN

TAHUN 2019

JAN FEB MAR APR MEI JUNI JULI AGT SEP


PT PERUSAHAAN GAS NEGARA (Persero) Tbk.
NA KEGIATAN INVESTASI PEMBANGUNAN JARINGAN PIPA, MODA TRANSPORTASI LAIN DAN/ATAU FASILITAS PENUNJANGNYA
DANA : APGN

TAHUN 2019

JAN FEB MAR APR MEI JUNI JULI AGT SEP

10 10 10 10 10 10.47
9

192,063,404 215,302,014 215,302,014 453,842,639

7 5

100
5 20 25 50
100
PT PERUSAHAAN GAS NEGARA (Persero) Tbk.
NA KEGIATAN INVESTASI PEMBANGUNAN JARINGAN PIPA, MODA TRANSPORTASI LAIN DAN/ATAU FASILITAS PENUNJANGNYA
DANA : APGN

TAHUN 2019

JAN FEB MAR APR MEI JUNI JULI AGT SEP

1,036,732,040
741,683,775
2,753,820,800
135,000,000 540,000,000
133,803,418
54,691,970 54,691,970 54,691,970 54,691,970 54,691,970 54,691,970 54,691,970

198,600,000

87,135,207
PT PERUSAHAAN GAS NEGARA (Persero) Tbk.
NA KEGIATAN INVESTASI PEMBANGUNAN JARINGAN PIPA, MODA TRANSPORTASI LAIN DAN/ATAU FASILITAS PENUNJANGNYA
DANA : APGN

TAHUN 2019

JAN FEB MAR APR MEI JUNI JULI AGT SEP

18
15
14
8 5
50 50
9

993,546,908

10.00 100.00 304.00 81.00 294.00 207.47 56.00 56.00 42.00


0.78 8.61 32.41 38.75 61.76 78.00 82.39 86.77 90.06

192,063,404 500,000,000 1,314,657,121 3,008,550,379 3,898,579,316 3,486,979,324 1,828,965,485 3,833,354,839 6,633,749,456


192,063,404 692,063,404 2,006,720,525 5,015,270,905 8,913,850,221 12,400,829,545 14,229,795,030 18,063,149,870 24,696,899,326
0.25 0.90 2.60 6.49 11.53 16.04 18.41 23.37 31.95

Integrated Team

Project Manager
O-002/0.24/F01
Rev.00

TAHUN : 2019

UN 2019
SISA
TARGET
OKT NOP DES

-
-

1,323,139,564 -
500,000,000 500,000,000 36,869,786,228 -

-
-
-
-
-
-

-
-
-

-
-
-
5 -
20 20 5 -
9 -

265,213,159 265,213,159 -
O-002/0.24/F01
Rev.00

TAHUN : 2019

UN 2019
SISA
TARGET
OKT NOP DES

70,193,324 70,193,324 -
143,444,400 143,444,400 -
68,749,626 68,749,626 -
730,837,800 730,837,800 -
6,804,600 6,804,600 -

-
-
-
-
-
-

-
-
-
-
-
-
-

-
-
-
5 -
20 20 5 -
9 -

11,889,900 11,889,900 -
O-002/0.24/F01
Rev.00

TAHUN : 2019

UN 2019
SISA
TARGET
OKT NOP DES

280,432,566 280,432,566 -
4,828,551 4,828,551 -
5,860,800 5,860,800 -
3,909,183 3,909,183 -
2,087,092 2,087,092 -
17,440,239 17,440,239 -
3,960,000 3,960,000 -
3,909,183 3,909,183 -
2,087,092 2,087,092 -

-
-
-
-
-
-

627,440,000 -

-
-
-
-
3 3 3 -
-

141,190 282,379 -
1,786,468,996 3,572,937,992 -
44,663,137 44,663,137 44,663,137 -
O-002/0.24/F01
Rev.00

TAHUN : 2019

UN 2019
SISA
TARGET
OKT NOP DES
O-002/0.24/F01
Rev.00

TAHUN : 2019

UN 2019
SISA
TARGET
OKT NOP DES

-
-
-
-

-
-

-
-
-
-
-

-
-
-
-

-
-
-
O-002/0.24/F01
Rev.00

TAHUN : 2019

UN 2019
SISA
TARGET
OKT NOP DES

141,306,440 -
119,258,065 -
628,774,400 -
2,677,459,200 -
61,697,382 -
54,691,970 -

-
-
-
-
-
-

-
-
-
-

-
-

358,467,593 -
O-002/0.24/F01
Rev.00

TAHUN : 2019

UN 2019
SISA
TARGET
OKT NOP DES

-
-
-
-
-
-

43.00 53.00 31.00


93.42 97.57 100.00

599,355,107 4,580,360,839 47,419,419,896


25,296,254,433 29,876,615,272 77,296,035,168
32.73 38.65 100.00

Jakarta, Januari 2019

Integrated Team Jawa Bagian Barat

Project Manager Kehandalan Jaringan

(Sigit Dewantoro)
STRUKTUR ORGANISASI MATRIX IT

Integrated Team Leader


Jawa Bagian Barat dan Sumatera Bagian

Agung Kusbiantoro

Sekretaris

Project Manager
Pengembangan Infrastruktur
JBB

M. Andi Rahman Sekretaris Doc Control

Budi J

Contract Project Pengelola HSSE +Serah


Engineering Administration Controller Material Terima +Permit

Luki R A (KRW, JKT,


Ardika M * CRB & Review All CA) Sulis Indriyanto
A. Rasyid Ide Dia Selly* Muhasyim Mardeni
Sulis I * (Review KJ,
Eko Yohanes PSI)
Pardi
Agus Setiawan Didi Nugroho, ST
Eko S, CE Andria Pradivta Agung C, Permit
DW Eben E, PE Hotma (BKS PLB CLG
Anna (PPY) Lutfi M, (PSI DC) Adi S, HSEO
Ikbal F, CsE Doni MR Rama, Permit
Idham, DRF Randy (TNG BGR LPG)
Zaenal A QE Feril (KJ PSI)
Arief DRF

Construction, HSE, QC

Sulis I * (Coordinator PI)

Jakarta Karawang
Bogor Bekasi Cirebon

Charles P B (Site Co) Soli A H (Site Co) M. Reza Lutfi A (Site Co)
Andika IC Ahmad Syuhada (Site Co) Jonli S*

John P S , QC
Dwi harjana, TRC Handoko IP , HSE
Fauzie L , TRC Hendrik S, QC Mujiono, TRC
Cipto , HSE Syawal Akbar, HSE
Ega S, HSE Surya Darma ,TRC Wargo Hendro, HSE
Edward, QC Wawan G, Pipeline Tutut, QC
Zaki, (HSE)
Oberlin H, Construction Andre, HSE
Tono (HSE Insp) Daniel, Construction
Guntur Doni, QC
Guntur Doni, QC

* Support other function


# Spot Assignment from other area

PM Pengembangan Infrastruktur JBB SBS PM Kehandalan Jaringan JBB SBS PM PI dan KJ Jabati

M Andi Rahman Noris Subekti Wahyu Wijaya


GANISASI MATRIX IT LEADER JBB SBS 2018
Revisi Per 30 Januari 2019
Integrated Team Leader
Berlaku Tgl :
an Barat dan Sumatera Bagian Selatan

Agung Kusbiantoro

Project Manager
Kehandalan Jaringan JBB SBS

Sekretaris Doc Control


Noris Subekti
M Muselik
Ronal Erick

Contract Project Pengelola HSSE


Engineering Controller Material Permit
Administration
Diki H*
Ridwan Niken A S Rosidin
Muharam Irma Indriani

Panggih, HSEO
Doni MR Ishak, Permit
Indra Fera W Alvin
Novan Sri Novianti
Joko P Wiwin
Yatim (DFT) Widya
Samsa, TRC

Construction, HSE, QC

Halid S (Coordinator KJ)

Karawang PSI/Stakeholder Jakarta Palembang


Tangerang Cilegon Lampung
Cirebon Bekasi

Charles P B* Diki H (Site Co)


M. Reza Lutfi A (Site Co) Soli * Wildan J (Site Co) Abdur rasyid*

ohn P S , QC Heldy K , QC
Handoko IP , HSE Adi Purnomo , QC Johan, TRC
Mujiono, TRC # Andika P , HSE #
Wargo Hendro, HSE Mamat , TRC
Tutut, QC Aming, QC
Ian G , HSE
Abdul Haris , QC
Organik
JPM
KWLO
PM PI dan KJ Jabati IT Leader JBB SBS Sekretaris
Total

Wahyu Wijaya Agung Kusbiantoro


Revisi Per 30 Januari 2019
Berlaku Tgl :

Pro
Program
Management Team

Ardika M
Ide Dia Selly

v
27 Personil
58 Personil
2 Personil
3 Personil
90 Personil
Project Manager
KJPI Jabati

Wahyu Wijaya
No Nama Paket Pekerjaan PIC I
1 Pekerjaan Penggantian Pipa DCI Jaringan Rusun Tanah Abang Andika
2 R/S Underground Rosidin
3 Zinker Pipa Jembatan Hitam Jonli
4 Realokasi Jalur Pipa dan Zinker Jembatan Sukaraja Andika
5 Penggantian Jaringan Schedule 20 - Maxim ke arah Cibinong Halid
6 IP Priok part II Diki
7 Pemasangan Navigational Buoy di Nearshore BJN Diki
8 Wet Calibration Ultrasonic Gas Flow Meter Diki
9 Koneksi Pipa Gas 16” 3 Lokasi di Cilegon Ridwan
10 Material Controller All Package Rosidin
PIC II
Ridwan
Ridwan
Andika
Halid
Rosidin
Ridwan
Ridwan
Ridwan
Jonli
PIC