Sie sind auf Seite 1von 8
& FOLLOW UP WELL PLANNING, Si Read the well plan, and other related document in drilling contract, materials, service companies Comments ‘Attend pre-spud meeting, Comments Observe the drilling ofa well fiom move in, rig up to-rig down, move off, including the following activities © Move in, rig. up > Seiting conductor ([at hole) + Drilling of ruthole & mousehole * Spuddia sunface hole + Tripping + Running & cementing su + Drilling production hole + Loxging «© Running & cementing production easing + Rig down, move olf e casing Record the-following data as the well is dilled. Compare it 10 the proposed well program © Days vs Depth © Mud weight vs Depth + Bit type + Nozzle size + wob - + Rotary speed «Pump pressure + Circulating rate * ROP 1. RUG COMPONENTS, OPERATIONS & SAFELY Locate the following rig components at the rig you ate visiting, Label the major co on the following rig illustration Power system We Engines oe Fuel storage tank Rotating Syste Ye Swivel te fe fey ve Kelly bushing J+ Rotary table Hoisting System ve Traveling Block 4+ Mook Ze Elevators © Drilling line fe Drawwork Ze Crown block Ze Substructure ve Mast ve Driller console Le Cathetid Cat foe, © Water table Pipe and pipe handing equipment ve Bit sub we ve Drill pipe ve 7 © Dill collars “ ee Drill bit fe ve Stalk liner Pipe racks: Cat walk Pipe vamp Y door Rat hole entity the Following additional items om the Fig ve ve Upper kelly cock Lower kelly cock tof/e Drill pipe salety valve Je Subs & Crossovers Comments yagom ete Ciroulating System © Mud tanks Slug tank/pit ve Mud pumps Fe Stand pipe Je Kelly hose ve Mud return flow fine ve Shale shaker 1A Degasser V+ Gas buster / poor boy separator Desander Desilter Possum belly Fresh water tank ‘Well Control System Ve BOP stack Ve Accumulator unit Ye Choke manifisld Ve Trip tank 7+ Mouse hole ve Monkey Boar Ye Tongs ve Inside BOP J+ Diill pipe loat V+ Dit Breaker Ve Slips wv — 2-2 Conta ninety of or eta pe on ste " Tg tnventory Reuse oe Ten “service Company = a | 5) Locate and describe the drilling spool, A section and intermediate heads, If not nite up, ~ caliper their ID's and determine their pressure ~1D Giuch) Diilling Spool Flanges ‘A section Intermediate Head | _| [Kill ine Chioke line - = 6. Participate with a fall BOP Equipment Test including + Diverter equipinent test + Pressure test of BOP equip + BOP functional test (Real: Test procedure for BOP equipment in the BOP & well control equipment manual) 7. Monitor the trip tank and maintain the trip tank for au entive trip out of the ole. Comments n for 8. WOR the general housekeeping contions at the tig, Write down some sugges improvement 6. What features does the rig have for the Jerricknnan to get to and from the monkeyboark during normal condition? In an Emergency? 10, i 4 Does the dertickman use a safety belt and lifelines according to SOP? Are other provision of the SOP .......? not, why? , Trace the escape routes fom the drilling floor, Describe these alternatives soutes Note any of instruction Wavailable. Participate in HS safety training, with equipment, salety procedure or location DRILLING & OPERATION GEOLOGY “Determine from the well program, the primary geology objective of the well! What are the shallowest possible hydrocarbon zone ? What is the expected TD / TVD ? What are the anticipated formation pressure? How is the following data determined as the well is dilled ? + Formation type (sand, dolomite, etc) - + Depth of formation © Thickness of formation SEMENTING CASING, TUBING & PRIMARY Visit a cement service Coy, (next trip to Jakavta), observe a cement pilot test in lab | Conmnents: Read & study the casing running and cementing procedure for the well you will visit! Comments mnake and tally the casing and Noat equipment ! Help the Comment iy supervisor to mensu 1g and cementing meeting, between the rig supt, the pate in the pre casing ru toolpushes, and cementing coy representatives # Comment Observe make up of float equipment and float joints Comment Whiat type’of pipe dope is being used on the casing threads 7 As the casing being ran + Identify the type of thread coating related to proper torque values (Vin, Zine or phosphate...) 8 ~~ isthe TOC? Well bite sketch ; \B 10. Prior to cemeutiny H1. Verify that samples dry mater 12, Observe the installation of the cementing lead 15. Observe the (esting of the ceme Sketch the wellbore to show the casing as it is to be sel. With cement volume shown. © Observe the method of make up. 1s it torque only or torque tun? How do the actual torque value oF torque turn value compares with the proposed well progiam + Observe the use of a drift bar on zabdit to check the ID dhift of each joint of easing How many joints are not properly drifted ? «+ Keep your own tally book and make sure the easing is being run in proper sequence compare your tally book with the book kept by the rig supt Comment Note whether the casing is being filled with mud or floated into the hole How does this compare with the program ? + Note the intervals in which central to the procedure ? + Monitor running speed. Compare the sunning, speed with the procedure. Depth Running Speed «Describe how 1o establish the elapsed time between pi © Tov did the rig supervisor recommend timing the picking up and setting down oF easing? Where zers, scratchers, etc are installed, Does this correspond kup and set down ! Sketeh the suiface cementing equipment layout, Include the cement lines in your schernatje, label the following + Water source = Pump tank = Blender © Cementing manifold 4 © Bulk tank Cementing Equipment Lay Out verify the type, quantity andl quality of mix water Mix water source Mix water quantity Mix water quality (hardness) _ Is and mix water are taken prior to mising Comment and work up of the cementing fines to the head Comment nes. Verify that they are tested (0 the pressure specified in the procedure Proposed pressure Actual pressure - 4. Observe foading and dropping of the bottom wiper plug. What procedure was used to ensure that the plug actually dropped ? Comment 3, observe breaking circulation ofthe mu, How much pressure was required Lo init circulation? What was the circulation rate which pumping cement ancl how did it compare to the rate described in the procedure, Pressure to initiate cise Circ, rate which pumping cement" _ How many cycles were made with the mud before pumping cement 16. Weight the cement with the regular mud balance and a pressurized mud balance) Weight with regular much balance: _ Weight with pressurized mud balance - 17 Observe reciprocation / rotation, Note the calc of reciprocation, How long were you able to reciprocate ? What is the speed and torque ? How long were you able to rotate ? At what joint was reciprocation / rotation clesed ? Ra Duration of re Rotating speed Torque _— Drag Duration of rotation Reciprocation / rotation closed - 7 18, Observe the loading aul dropping of the top wiper plug, How was the dropping of reciprocation pracation a verily ? Comment 9, During displacement, monitor the fluid return, Are you getting full returns to the surface or only partial 7 How do you know ? , 20. Note the displacement rate and pressure Displacement rate _ Pressure 21) How do you know if the plug bumped ? How does the actual displacement volume compare with the expected displacement volume ? Did it take more displacement planned ? If count with the difference ? different, what are some possible reasons that might Barrels displacement a Maximum pressure - 52! What was the pump pressure when the pump was shut down? 53. How many barrels were required to bleed back to zero pst ? 24, Was there an excess volume ? 130, why ? 25. Observe the pressure bleed off test to determine ifthe Moat is holding ? Comment 26. Observe dropping of easing hanger Comment (2A What is the Goon Hts je (28) Observe a PIT or LUT bot {the easing 7 , Wl giessure vo the cuswutntive volume oF nnd pomp \. 1. Check the actual pump presi ngallf he drilling program and the contr there any discrepancy 7 If'so, wliy ? 2, How was the flow rate measured ? of te'aetual flow rates with 1 bee fact speci ates used to calculate the hydraulics, How do they compare 7 there any discrepancies, why ? 3. Calculate equivalent circulating density 7 ECD = 4.) Calculate annular velocities, are they suf ~ "Annular velocities In dill pipe In drill collars . ide 1b cleanthe hole? How do you know ? mi Vi. BIT: TECHNOLOGY 1 Calls service coy. to discuss a variety of availa bits Comment 2. While at a rig, observe pulling a bit, preparing anew bit, up. ‘omment stallation of the Rozzle and make J in the bit program, desciibe any discrepancies Je sizes in the bit progr 4, Cottipare the bits used and the bits specified 4 Check actual nozzle size used against the proposed #022 Actual nozzle size Proposed nozzle size 5. Calculate cost/foot for a bit white drilling Cost! 6. Grade the bit when pulled fiom thi 1 well, Compare grading with the actual grading given by the rig supt Your grade ss Rig Sup's grades 7. What does the condition of tl recommend for the next bil 7 hie bit (hat was pred) indicate to you ? What would you Vil. DRILL STRING DESIGN 1 Sketch the component ofthe bottom hote assembly Bug used to drilled (using thes below) label and show lengths of individuel componeh Bile Skel / 2. Caliper the bottow hole assembly components before sunning in the Hole, Show resullson sketch above 4 Devermine the last tine the bottom liole assembly ws inspected, Was it in the past 400 rotating hours ? Last inspection 4 Observe the torque used Le make up the bottom hole assembly. How do the actual torque values compare with the values specified in the program : What kind of dope is being used on drill string ? 4G Caleulate the maxinyon allowable overpull based or the actual Bolom hole assembly. Overpull = 1. Coectate the dsplacenent of the dil string atthe depth being dilled, Was an allowance nade the toot joints ? Displacement 8 Calculate the eapacity ofthe dil string, the strokes requived to ih he dil si stand pipe tothe bit and the strokes required to circulate fron the Vit to the surface Capacity of the drill string Strokes required to fil dil sting fFom the stand pipe t0 the bit Stroke vequired to circulate from the bit to the surface - 9 tHovr da the cafeulation in the item eight components wilh the observe data? 10, What might account for any difference ? I Were you able to ensure ites nine an ten” HFso, how? [Ft why not? Wy from the Vill DRILLING ELUIDS 1 Perform day surveillance of and properties. Plot these propetties and compare them with the well program. WOK any niajor discrepancies with the progtary 2. Observe mixing of nud anc additives at the rig site i Comment 3. Weight the mud at the rig site Mud weight. 25 gee 4. Observe the operation si solids control equipnrent Inciuding (but not fimited to) the shale shaker, the desilter, and desander. i What size mesh is the shaker serecn ? Lethe desander operating with a spray discharge at underflow ? i Ag the desiter operating with a spray cischarge at underow 7°55 oy IX. WELL CONTROL 1. Sketch and label the BOP equipment at the rig. site (using the space below). Including the trip tank, BOP stack, closing unit, choke manifold, mail control fines did gas buster, 2. Shute a welbore, showing the capacities and displacements of the Hole and drill sting Observe sam change out Comment 4. Check the BOP co! Comment ation and outlets against the SOP/named.

Das könnte Ihnen auch gefallen