Sie sind auf Seite 1von 4

CI PROJECT PROPOSAL

PROJECT SETTING EFFECTIVE VESSELS PROJECT


TITLE ELIMINATING NON-NUMERATES CODE
Name of School/Unit
PROPONENT PROPOSAL
BAHAY PARE HIGH SCHOOL DATE
Contact Person (Name and Number)

MIGUEL R. RIVERA JR.,Ph.D.

BACKGROUND Describe the problem situation or opportunity for improvement, and the potential contribution to the achievement of
specific school/learner outcomes (SIP).
AND
RATIONALE FGD responses shows that grade 7 learners were having difficulties in
understanding basic concepts in Math as based on the result of Zero Non
Numerates Test. In the school year 2016-2017 the number of learners that are
non-numerates reach a total of 25.This shows that the learners find difficulties in
understanding basic math concepts resulting to low performance level.
Therefore, the Mathematics Department has decided to conduct the Project
Seven in order to set an effective vessel to lessen the non-numerates
Specific, measurable, attainable, result-based, and time-bound (SMART), achievable within the project timeline.
OBJECTIVES
To make 100% of the non numerates students become numerates within school
year 2016-2018.
INDICATE STAGE SCHEDULE RESOURCES
PROJECT NEEDED
SCHEDULE 1. Assess June 13, 2016 2, 500 Php

2. Analyze June 27, 2016 ----------

3. Act August 1, 2016 3, 500 Php

TOTAL 6, 000 Php


FUNDING SOURCE SCHEDULE AMOUNT
SOURCE
 INTERNAL School Funds (MOOE) 6, 000.00 Php
School Canteen ------------------

PTA Funds ------------------

Prepared by: Endorsed by: Reviewed and Approved by:


Recommended by:

JUNE D. CUNANAN
MARLON B. ALABADO MIGUEL R. RIVERA JR. LEONARDO D. ZAPANTA Ed.D.,CESO IV
ALVIN G. GOZUN
RIZEL A. JIMENEZ School Principal Schools Division Superintendent
Division CI Facilitators
EDILON M. PONCE

School CI Facilitator
CI PROJECT PROPOSAL

STAKEHOLDERS Alumni 3500.00 Php

Barangay 3500.00 Php

TOTAL 7, 000.00 Php

REVIEW AND
APPROVAL
REMARKS

Prepared by: Endorsed by: Reviewed and Approved by:


Recommended by:
MARLON B. ALABADO
JUNE D. CUNANAN
RIZEL A. JIMENEZ MIGUEL R. RIVERA JR. LEONARDO D. ZAPANTA Ed.D.,CESO IV
ALVIN G. GOZUN
EDILON M. PONCE School Principal Schools Division Superintendent
Division CI Facilitators
School CI Facilitator
CI Team Charter
PROJECT SETTING EFFECTIVE VESSELS ELIMINATING PROJECT
NON-NUMERATES CODE
TITLE

SCHOOL HEAD/
PROCESS
OWNER LIDA D. MANANGU

FACILITATOR MARLON B. ALABADO

TEAM NAME ROLE


COMPOSITION
RIZEL A. JIMENEZ Team Leader

LILIAN G. DELA CRUZ Scribe

EDILON M. PONCE Communication

LOVELY C. BALBOA Documentation

SOLEDAD P. DE LEON Process Observer

KEY

CUSTOMER Grade 7 LEARNERS

KEY PROCESS ZNN RESULTS

OBJECTIVES Specific, measurable, attainable, result-based, and time-bound (SMART), achievable within the project timeline.

To make 100% of the non-numerates students become numerates within school


year 2016-2018.

PROJRCT Activity OUTPUT TARGET 1 2 3 4 5 6 7 8 9 1 1 1


SCHEDULE DATE 0 1 2

Assess 1. Get Organized  Project Plan June 13,


2016
 Data
Collection
Plan

2. Talk with FGD (Teachers/ June 20,


Customers Students) 2016

3. Walk the SIPOC June 22,


Process 2016

4. Identify Problem Statement June 24,


Improvement 2016
Areas

Analyze 5. Do Root Cause Why - Why June 27,


Analysis Diagram 2016

6. Develop To-Be Process July 22,2016


Solutions Flow Chart/Map

7. Finalize Project July 29,2016,


Improvement Template (A3)
Plans

Act 8. Pilot Solution Training/ August 1,


Orientation 2016
Materials

9. Roll Out Roll Out Plan October 10 ,


Solution 2017

10. Check Process February 7,


Progress Performance 2017
Results

Prepared by: Endorsed by: Reviewed and Approved by:


Recommended by:

JUNE D. CUNANAN
MARLON B. ALABADO MIGUEL R. RIVERA JR. LEONARDO D. ZAPANTA Ed.D.,CESO IV
ALVIN G. GOZUN
RIZEL A. JIMENEZ School Principal Schools Division Superintendent
Division CI Facilitators
EDILON M. PONCE

School CI Facilitator

Das könnte Ihnen auch gefallen