04.16.19
Dewatering Room Detail GPL Submitted via
email to PM Roel
04.16.19
ASD Pump Layout GPL Submitted via
email to PM Roel
Unclosed/Pending from Previous Minutes of the Meeting
1. Alviera Montala
Construction Odor Control Piping PJL 04.26.19
Drawings
Construction Drawings Revision align
PJL 04.21.19
to comments
Document Code:
Revision Take-off
Waiting for instruction of Sir Rommel
4. DMI-65 Filtration for the fittings
Systems (Emergency PJL 04.17.19
Construction Drawings:
Deepwells) Del Pillar – Done
San Jose – Not yet done
Revision Take-off
Construction Drawings:
GPL 04.17.19
Signal – Done
Vista – Least Priority
Revision Take-off VMV 04.17.19
Construction Drawings:
San Isidro – Done
Document Code:
New Tasks:
Document Code:
Others:
NEXT MEETING:
Date: Time: Venue:
Noted by: