GENERAL SUMMARY
Adjustment
Page 1
PROPOSED (B+G+1+R) VILLA FOR AVI BHOJANI
At Plot ID: PJJPFJ35
Bill Of Quantities
GENERAL SUMMARY
Item Description Qty Unit Rate Amount
Page 2
BILL NO. 2 - Finishing
2 Wall Finishing
Painting
a Internal painting 2202 M2
Wall 1552 M2
Ceiling (ON PLASTERED CEILING) 650 M2
c Plastering 2792 M2
Inside 1671 M2
Ceiling basement 500 M2
Out side 620.5 M2
3 waterproofing
4 FLOORING
a Marble 723 m2
b Service room ceramic tiles 136 m2
CEILING
E Bathroom ceiling 85 M2
1 Door
a D1 (1000X2200mm) 26 Item
b DI (2000X2200mm) 3 Item
D2 (800X2200mm) 6 Item
2 WINDOW
3 ventilator
a V1 (80X340) 1 Item
b V2 (80X340) 11 Item
c V3 (200X340) 1 Item
4 Glass
b C2 (200+200+600X1000) 1 Item
c C3 (880x340) 1 Item
e C4 (100+670X340) 1 Item