Imperatives for Optimisation

RF optimisation remains one of the key challenges in any network.

Identifying potential faults in the network and resolving them before


they affect network performance.

Rectifying causes of faults affecting network performance.

Leads to efficient use of the spectrum.

3
Optimisation Overview

4
Need for optimisation

Network issues that may generate a requirement

Perceived reduction in network quality.

Indications from network performance monitoring.

Subscriber's experience of using the network.

Maximising the use of existing infrastructure.

Operators wants to ensure the best returns on investment.

Introduction of new services.

Maximise existing resources to accommodate new services such as GPRS.

Change in original design parameters.


▪ Flawed original design in format.
▪ Original design information has changed.

5
Network Lifecycle

Licence
Award

Swap Network
Management
Planning
(If required) Network Lifecycle

Continuous Network
Optimisation
Rollout
Pre Launch
Optimisation

6
RF Optimisation

Pre Launch Virtual Continuous


Optimisation Centre Swap
Optimisation Optimisation Management

(If required)
- BTS upgrade

Virtual Optimisation
- BTS re-homing Centre

- BSC re-parenting

- Transmission Re-engineering

7
Pre Launch Optimisation

Pre Launch
Optimisation Objectives

High rate of integrations

Continuous
Optimisation Low traffic (Pre-launch or launch)

Predominantly drive data dependant

Swap
Management

8
Optimisation Process – Single site verification

Site
Pre Launch Identification
Optimisation

RF Site Coverage
Audit Verification

Continuous
Optimisation Reconfiguration

Parameter
verification

Fail
Swap Problem
Management Analysis

Site Pass
Acceptance

9
Optimisation Process – Drive Test Based

Cluster Site Site


Pre Launch Identification Identification Acceptance
Optimisation

Cluster Cluster
Stimulation Preparation

Continuous
Optimisation Drive Test

Data Analysis Reconfiguration

Fail
Swap Problem
Management Analysis

Cluster Pass
Analysis

10
Cluster Analysis
Determine clusters for acceptance

Drive Test Characterise performance


Results
Ensure correct site configuration
• Parameter Setting
• Neighbors
• Powered
• Stable
Drive tests
OMC Simulation
Data Process data
Data
•Call statistics
•Key measurement events
• Neighbor analysis
•Key measurement data

Analysis

Remodelling

Reconfiguration
• Parameters
• Neighbors
• Report Hardware
Requirements
11
Cluster Reconfiguration

Pre Launch
Optimisation Hardware Cell parameter
Optimisation optimisation

Antenna Reorientation Handover parameters

Antenna Down tilt Power planning

Antenna Relocation Neighbour list reconfiguration


Continuous
Optimisation Antenna Height adjustment Frequency planning

Masthead Amplifiers

Swap
Performance Monitoring
Management

12
Pre Launch Optimization

What GTL can do for On Site


Pre Launch Off Site
Optimisation you
Cluster
Parameter
Identification
Analysis
Cluster
Process Creation Preparation

Drive Testing
Continuous KPI Definition
Optimisation Drive Analysis
KPI Reporting

Functionality Modelling
Asses
Network
Training Reconfigure

Swap Cluster Monitoring


Management Config Management

Model Calibration

13
KPI’s to be Monitored
Based on performance of a Network & Cell (TBD : To Be Decided)

Network KPI Deciding


KPI Target Type Factor
CSR (%) 93% Performance

CSSR (%) 95% Performance


TBD upon
DCR (%) 5% Performance
checking trend
Network / to maintain the
Town Level performance of
TCH Blocking 2% Performance the network
and to improve

SDCCH
3% Performance
Blocking

CSR (%) 90% Performance

CSSR (%) 92% Performance


TBD upon
checking trend
Cell Level DCR (%) 10% Performance to maintain the
performance of
TCH Blocking
the network
4% Performance
and to improve

SDCCH Blocking 6% Performance

14
KPI’s to be Monitored
Based on performance of a Network & Cell (TBA : To Be Accepted)

Network KPI Deciding


KPI Target Type Factor
Downlink Rx Qual TBA Performance

Uplink Rx Qual TBA Performance


TBD upon
FER Performance
checking trend
Network / TBA
to maintain the
Town Level performance of
Data Through
Performance the network
output TBA
and to improve

Data
TBA Performance
Accessibility

TBA
Downlink Rx Qual Performance

TBA
Uplink Rx Qual Performance
TBD upon
TBA checking trend
Cell Level FER Performance to maintain the
performance of
Data Through TBA the network
Performance
output and to improve

Data Accessibility TBA Performance

15
Reports

Deliverables
Pre Launch
Optimisation Pre Launch Optimization

Cell / Cluster Drive Test and Analysis Report.

Quality issues identification and RX lev, RX Qual, TCH Blocking,


SDCCH Drop,HO Issues, Call drop problems, and call set up
issues analysis.
Continuous
Optimisation Cell / Cluster Optimisation Report.

RF parameters audit and tuning : neighbour site list, power


parameters, HO parameters, etc.

Antenna engineering tuning.

Swap
Management Cell / cluster Optimisation and tuning to reach acceptance criteria.

16
Reports

Traffic Statistics Analysis Report.

Pre Launch
Network Analysis and Optimisation Report.
Optimisation

Cell, cluster, Network drive test reports from post processing tool.

RF coverage and quality assessment report.

Continuous Radio and system Parameters audit and tuning report.


Optimisation
Optimisation Report.

Acceptance Report.

Swap
Interference Measurement.
Management

Updated network site database.

17
Continuous Optimisation

Pre Launch Objectives


Optimisation

Maintaining the traffic rate within medium to low

To achieve more stability in neighbour/ pilot

Continuous
Optimisation Minimisation of integration Issues

Reducing operational cost

Swap Predominantly OMC R Stats and Counters


Management

18
Continuous Optimisation

Customer Faults Trouble Tickets


Pre Launch
Network Service Level
Optimisation CM Data Call Trace Performance OMC
Targets Status

Drive Test Results Alarms

Continuous
Optimisation Fault
Performance
Resolution

Cell
Prioritisation
Swap
Management
Fault Reports

19
Optimisation Process – Drive Test Based
Determine clusters for acceptance

Characterise performance
Pre Launch
Optimisation Ensure correct site configuration
• Parameter Setting
• Neighbors
• Powered
• Stable

Drive tests
Continuous Process data
Optimisation •Call statistics
•Key measurement events
• Neighbor analysis
•Key measurement data

Analysis

Remodelling
Swap
Management Reconfiguration
• Parameters
• Neighbors
• Report Hardware
Requirements
20
Cluster Reconfiguration

Pre Launch
Optimisation Hardware Cell parameter
Optimisation optimisation

Antenna Reorientation Handover parameters

Antenna Down tilt Power planning

Continuous Antenna Relocation Neighbour list reconfiguration


Optimisation Antenna Height adjustment Frequency planning

Masthead Amplifiers

Swap
Management Performance Monitoring

21
Continuous Optimization

Pre Launch Off site What GTL can do On Site


Optimisation for you

Audit OMC Reporting

Benchmarking
Cell Prioritisation
Continuous Process Control
Optimisation
Config Fault Resolution
Management

KPI Definition Drive testing

KPI Reporting
Swap Change
Functionality recommend
Management
Asses

Training Network
Reconfigure

22
KPI’s to be Monitored
Based on performance of a Network & Cell (TBD : To Be Decided)

Network KPI Deciding


KPI Target Type Factor
CSR (%) 93% Performance

CSSR (%) 95% Performance


TBD upon
DCR (%) 5% Performance
checking trend
Network / to maintain the
Town Level performance of
TCH Blocking 2% Performance the network
and to improve

SDCCH
3% Performance
Blocking

CSR (%) 90% Performance

CSSR (%) 92% Performance


TBD upon
checking trend
Cell Level DCR (%) 10% Performance to maintain the
performance of
TCH Blocking
the network
4% Performance
and to improve

SDCCH Blocking 6% Performance

23
KPI’s to be Monitored
Based on performance of a Network & Cell (TBA : To Be Accepted)

Network KPI Deciding


KPI Target Type Factor
Downlink Rx Qual TBA Performance

Uplink Rx Qual TBA Performance


TBD upon
FER Performance
checking trend
Network / TBA
to maintain the
Town Level performance of
Data Through
Performance the network
output TBA
and to improve

Data
TBA Performance
Accessibility

TBA
Downlink Rx Qual Performance

TBA
Uplink Rx Qual Performance
TBD upon
TBA checking trend
Cell Level FER Performance to maintain the
performance of
Data Through
TBA the network
output Performance
and to improve

Data Accessibility TBA Performance

24
Reports

Deliverables
Pre Launch
Optimisation
Continuous Optimisation

Radio network measurement and analysis report

Containing signal strength, Quality, Time advance,Path loss,


Continuous Frequency distribution, Neighbour selection.
Optimisation
BSS/ RAN parameter adjustment report

Neighbour optimisation parameter, BTS/ MS power control,


Intracell handover, Hierarchy cell structure & cell load sharing.
Swap
Management

25
Reports

Worst cell optimization report


Pre Launch
Optimisation TCH Blocking, SDCCH Blocking, Signal Strength, Bad Quality,
Timing Advance, Sudden Loss, Other Reasons.

Coverage Analysis report

Continuous Drive test, Worst cell, site survey,Antenna rigging.


Optimisation

Capacity Analysis & Recommendation Report

Dynamic full and half rate, Cell load sharing,Hierarchy cell structure,
Dynamic allocation of SDCCH.
Swap
Management

26
Swap Management

Pre Launch
Optimisation Objectives

High rate of integrations

Continuous
Optimisation
High traffic (Pre-Cut and Post Cut)

Predominantly drive data dependant

Swap
Management

27
Swap Management

Pre Launch
Optimisation Swap Planning

Default Parameter

Continuous
Optimisation Parameter Mapping

Validation of Neighbour, BSIC and MAIO

Swap
Management

28
Swap Process – Pre / Post verification

Site
Pre Launch Identification
Optimisation

RF Site Coverage
Audit Verification

Continuous
Optimisation Reconfiguration

Parameter
verification

Fail
Swap Problem
Management Analysis

Site Pass
Acceptance

29
Swap Process – Cluster Based

Cluster Site Site


Pre Launch Identification Identification Acceptance
Optimisation

Cluster Cluster
Stimulation Preparation

Continuous
Optimisation Drive Test

Data Analysis Reconfiguration

Fail
Swap Problem
Management Analysis

Cluster Pass
Analysis

30
Cluster Analysis
Determine clusters for acceptance
Drive Test
Results Characterise performance

Ensure correct site configuration


• Parameter Setting
• Neighbors
• Powered
• Stable

OMC Drive tests


Simulation
Data Data Process data

•Call statistics
•Key measurement events
• Neighbor analysis
•Key measurement data
Analysis

Remodelling

Reconfiguration
• Parameters
• Neighbors
• Report Hardware
Requirements
31
Cluster Reconfiguration

Pre Launch
Optimisation Hardware Cell parameter
Optimisation optimisation

Antenna Reorientation Handover parameters

Antenna Down tilt Power planning

Continuous Antenna Relocation Neighbour list reconfiguration


Optimisation Antenna Height adjustment

Masthead Amplifiers

Swap
Management Performance Monitoring

32
Swap Optimization

Pre Launch What GTL can do for On Site


Off Site
Optimisation you
Cluster
Parameter
Identification
Analysis
Cluster
Process Creation Preparation

Continuous KPI Definition


Drive Testing
Optimisation
Drive Analysis
KPI Reporting

Functionality Modelling
Asses
Network
Training Reconfigure
Swap
Management Cluster Monitoring
Config Management

Model Calibration

33
KPI’s to be Monitored
Based on performance of a Network & Cell (TBA : To Be Accepted)

Network KPI Deciding


KPI Target Type Factor
CSR (%) Improve Performance

CSSR (%) Improve Performance


TBD upon
DCR (%) Improve Performance
checking trend
Network / to maintain the
Town Level performance of
TCH Blocking Improve Performance the network
and to improve

SDCCH
Improve Performance
Blocking

Improve
CSR (%) Performance

Improve
CSSR (%) Performance
TBD upon
Improve checking trend
Cell Level DCR (%) Performance to maintain the
performance of
TCH Blocking
Improve the network
Performance
and to improve

SDCCH Blocking Improve Performance

34
KPI’s to be Monitored
Based on performance of a Network & Cell

Network KPI Deciding


KPI Target Type Factor
Downlink Rx Qual Improve Performance

Uplink Rx Qual Improve Performance


TBD upon
FER Improve Performance
checking trend
Network / to maintain the
Town Level performance of
Data Through
Improve Performance the network
output
and to improve

Data
Improve Performance
Accessibility

Improve
Downlink Rx Qual Performance

Improve
Uplink Rx Qual Performance
TBD upon
Improve checking trend
Cell Level FER Performance to maintain the
performance of
Data Through
Improve the network
output Performance
and to improve

Data Accessibility Improve Performance

35
Reports

Deliverables
Pre Launch Swap Management
Optimisation
Swap Planning Report.

Parameter mapping report

Pre Drive Test Report


Continuous
Optimisation Verification of RF Coverage, parameters audit and tuning : neighbour site list,
Power parameters, HO parameters, etc.

Cutover Drive Test Report

Validation of RF Coverage, parameters audit and tuning : neighbour


site list, power parameters, HO parameters, etc.
Swap
Management Post Drive Test Report.

Improvement of RF Coverage, parameters audit and tuning : neighbour


site list, power parameters, HO parameters, etc.

36
Subjects to Investigate
Non-Working sites/sectors or TRX’s

Pre Launch In-active Radio network features like frequency hopping


Optimisation
•Disabled GPRS

Overshooting sites – coverage overlaps

•Coverage holes
Continuous
Optimisation C/I, C/A analysis

High Interference Spots

Drop Calls

Swap Capacity Problems


Management
Other Interference Sources

Missing Neighbors

37
Subjects to Investigate

One-way neighbors

Pre Launch
Ping-Pong Handovers
Optimisation
Not happening handovers

Footprint and performance of the site as per design


criteria

Faulty Installations
Continuous
Optimisation
Sites not operational

•Faulty TRX

BA list error

Swap
•BSIC, HSN, MAIO Plan
Management
Hopping ON or OFF

38
Recommendations
Defining missing neighbor relations

Pre Launch Proposing new sites or sector additions


Optimisation
Proposing antenna azimuth changes

Proposing antenna tilt changes

Proposing antenna type changes


Continuous
Optimisation BTS Equipment/Filter change

Re-tuning of interfered frequencies

Adjusting HO Margins

Swap Adjusting accessibility parameters


Management
Changing power parameters

MHA/TMA adds

39
Virtual Optimisation Centre

Remote Analytics for Design, Planning & Optimisation


Pre Launch
to achieve minimal startup time, consistent use of
Optimisation
process and tools and concentrated expertise in one
location

State of the art VPO Centre vital stats:

Floor space: 2000 Sq. Ft.


Continuous Seating capacity: 50
Optimisation Internet speed: 2 Mbps
No. of RF engineers: 50
Total man years experience: 10 Years
Tools used for VPO: Asset
Connect
PL4 & MIPT
Swap
Management

40
Virtual Optimisation Centre

Pre Launch
Optimisation
Activities Off shore On shore

Benchmarking
Data Collection
Continuous
Optimisation RF and Transmission Planning
Transmission Network Verification
RF / Line of Sight Surveys
CW Testing and Model Tuning
Nominal Cell Planning
Swap
Management Frequency Scanning
Optimisation

41
Virtual Optimisation Centre

Benefits
Pre Launch
Optimisation Low fixed Cost regardless of the project location.

Fast Delivery Cycle and Quick deployment of project.

Cost effective especially for high cost areas.

Continuous Flexible service packages to meet unique customer needs.


Optimisation
Ideal solution for high-risk or hard to access areas.

Expertise availability guaranteed.

Core expertise group available to service multiple project.


Swap
Management Quick take off without tine lag to mobilize.

Uniform applications on tolls through standard processes.

42
Value Proposition

Risk Sharing - KPI & SLA Based Commitments

End to End RF solution provider

RF Planning, Design and Optimisation done for


31 networks

– Experience across 15 geographies


– Covering 2G, 2.5G, 3G technologies
– Across standards such as GSM, Edge/GPRS,
CDMA, UMTS and WiMAX

Long Standing relations With OEMs At Global


Level

Unique combination of tasks carried out Offshore


and Onshore that give cost efficiencies

Technology and vendor agnostic skill set

43
Case Studies & Capabilities

44
Case Study 1

On many occasions, it has been found that improper RF


cabling gave rise to wrong BCCH - Sector combination.
Corrections were initiated and post correction verifications have
been performed.
About the Client : To find coverage footprint and associated quality plt, drive
Hutchison Essar (Hutch), is a leading GSM network tests were executed with two MS (MS 1-Hutch Idle mode &
operator in India having GSM wireless operations with MS 2 – Hutch Dedicated mode) simultaneously.
a pan Indian footage. The network has been growing
at a very high pace to address competition with more This were done in and around 6km radius centering the site as
coverage and capacity. This entails Hutch to roll out per Hutch specification.
new sites in remote areas of UP. While expanding,
Hutch wanted to have their network optimised From this drive-test data, GTL prepared coverage and quality
plot for newly commissioned site. Results were submitted to
Business Challenge : Hutch. After achieving required results, sites were put on air
for commercial purposes.
Hutch found RF Group of GTL a competent partner to
perform on their behalf optimization activities with Value Delivered :
quality deliverables. In the process GTL got the
responsibility of around 240 sites (170 existing & 70 GTL successfully completed the optimisation activity for
new sites) to be completed during October 2005 to the project covered 170 existing sites and 70 new sites during
March 2006. Oct’05 to Mar’06.
All sites were either in Highways or in remote locations of
Project Scope : eastern part of UP covering Kanpur, Lucknow, Varanasi,
Allahabad and Gorakhpur.
GTL was to optimize new roll out cell sites in the
network to achieve desired results viz. call origination,
call termination, intra-cell handover, and coverage.

45
Case Study 2

Project Scope :
SoW conferred and accepted by GTL have been as follows:
About the Client : Perform pre swap drive test for all 41 sites.
Hutch is one of the leading gsm operator in India Prepared proficient database for Nokia
having licenses spanning all over India. Hutch is Add and delete Neighbor list.
working with gsm 900 band and wants to expand their Verification of antenna locations and azimuth.
network as the demand grow. So to meet quality and Verifies existing Frequency Plan, recommend the changes
coverage there is need to swap old ZTE system with required.
some new updated system, which can support the Download the database to OMC and verify the dump.
gsm, gprs, edge and easily upgraded to 3G. Perform Drive Tests for sites verification on Swap night.
Hutch selected Nokia as OEM for the core part of their Perform the post swap drive test for all 45 sites.
network. Conduct Acceptance Test Procedure (ATP) with end customer.
Nominal Cell Planning for New 417 sites
Business Challenge : RF survey, LOS survey and Drive Test for New Sites.
Nokia wanted to have resources in the outsourcing MW radio link planning for MW transmission links.
domain increase their strength. As GTL had done lots Provide a solution for the Hutch subscriber’s complaints.
of work with Nokia in India so GTL seems to be Preparation of 2 Mbit/s transmission plan including link capacity
perfectly poised to rise to the need. We became calculations, timeslot allocation and ET planning
partner of choicer for Nokia to perform RF tasks in the Maintain the Network quality by daily monitoring KPI.
swap roll out process. From March 2005 to Till Date
for performed allocated tasks creditably. A few points Value Delivered :
of project: All swaps are mostly conducted at night there is around 6 sites
GSM 900 Networks. swap per day. As soon as swap sites bring on air our drive test
45 sites to be swap from ZTE to Nokia. is ask to conduct the site verification drive test at each cell the
342 New Nokia Ultra BTS test includes database verification, sector swapping, handover
Coverage includes cities and boundaries. testing, neighbor list verification, call termination. After
Network with 19 BSC’s and two switch AXE 10 from finishing the swap now optimization is started on network level,
Nokia.- to meet the KPI daily statistic report are generated with the
CSSR ≥94%, SDCCH Drop ≥2%, Handover success help of Business object and results are discussed with the
rate ≥ 94%, Call drop rate ≤ 2.5%. customer and also suggest the necessary changes.

46
GTL's Network Customer Engagement

Government Of Power Grid


Maharashtra Corp

47
International Presence
Europe:
UK
France
Middle East: Asia–Pacific:
Ireland
UAE Malaysia
Sweden
KSA Thailand
Switzerland
Oman China
Americas: Taiwan
Qatar
US Indonesia
Kuwait
Australia
Singapore
Philippines
New Zealand

South Asia
India
Nepal
Africa: Bhutan
Maldives
Nigeria
Sri Lanka
South Africa
Bangladesh
Guinea Conakry
Mauritius

International Office
Projects Undertaken

© Copy right GTL Limited 2008 48


Thank you

Das könnte Ihnen auch gefallen