DULL Inner Row Outer Rows Dull Char. Location Bearings/Seals Gauge Other Dull Char. Reason Pulled
CODE
- - - - - - - -
CASING SEAT(NEXT 7” & 5” LINER)
WOB ROTARY + PUMP VOLUME PUMP PR.
DRILLING (TONS) MOTOR (RPM) (GPM) (PSI) 20” 14”/13 3/8” 9 7/8”/9 5/8” 7”Liner 5”LinerTop/Shoe
Top/Shoe
PARAMETER 4386 / 5030 /
- - 455 2300 406 2604 4479
5140.5 5415
Water Oil Ca Water Solids
MUD TYPE S.G Vis PV YP Gel PH Cake Cl (ppm)
Loss (%) (ppm) (%) (%)
KCL POLYMER 1.81 56 30 24 9/23 10.5 4.8 - 73,000 9 280 61 30
FROM TO HRS CODE DETAIL OF OPERATIONS
06:00 08:00 02:00 7 RIH 7” CSG SCRAPER DOWN TO 3200M.
08:00 10:00 02:00 10 REPAIRED WORK ON CROWN-O-MATIC.
10:00 16:00 06:00 7 RIH DOWN TO 5136M & TAGGED CMT.
16:00 19:00 03:00 5 SWEPT OUT HI-VIS PILL PRIOR TO POH.
19:00 05:00 10:00 7 POH UPTO SURFACE (L/D 5-7/8” BIT + 7” CSG SCRAPER)
05:00 06:00 01:00 13 PREPARATION & R/UP OGDCL W/LINE LOGGING UNIT FOR CBL-VDL LOG.
LPO #IBA/A/16107/RIG N-4/19 QTY. 400000 LTRS HSD RCVD. 180104 LTRS BALANCE. 219896 LTRS
DAILY CONS.(LTRS) CUM. CONSUMPTION
DAILY COST (MM$) CUM COST (MM$) BALANCE (RIG + CAMP) LTRS
HSD GEN. MUD (LTRS)
CONSUMPTION
3857 - 498381 0.003548 0.455211 67757
DAILY HSD COST DAILY MUD DAILY RIG COST DAILY WMS CUM.COST
DRLG.MATERIAL CUM COST DRLG MTRL
COST MM$ COST(MM$) (MM$) COST HSD+RIG+CHEM
(MM $)
0.003548 0.000992 0.024125 - 13.373654 - -
ROTATING WASH PIPE REPLACED ON 21-08-2019
DC = 21 HRS HWDPS = 21 HRS HMD JAR = 21 HRS
HRS. ROTATING HOURS = 540